Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 17410-2023 English PDF

US$419.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 17410-2023: Organic heat transfer material heaters
Status: Valid

GB/T 17410: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 17410-2023419 Add to Cart 4 days Organic heat transfer material heaters Valid
GB/T 17410-200888 Add to Cart 1 days Organic heat transfer material heaters Obsolete
GB/T 17410-1998639 Add to Cart 5 days Organic heat transfer material heaters Obsolete

Similar standards

GB/T 23711.1   GB/T 23711.2   GPON SFU   GB/T 10476   GB/T 37327   

Basic data

Standard ID: GB/T 17410-2023 (GB/T17410-2023)
Description (Translated English): Organic heat transfer material heaters
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: G93
Classification of International Standard: 71.120; 25.180
Word Count Estimation: 22,277
Date of Issue: 2023-09-07
Date of Implementation: 2024-04-01
Older Standard (superseded by this standard): GB/T 17410-2008
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 17410-2023: Organic heat transfer material heaters

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 71.120;25.180 CCSG93 National Standards of People's Republic of China Replace GB/T 17410-2008 Organic heat carrier furnace Published on 2023-09-07 2024-04-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee

Table of contents

Preface III 1 Scope 1 2 Normative reference documents 1 3 Terms and Definitions 2 4 Model and code 2 4.1 Model 2 4.2 Code 3 5 Requirements 4 5.1 Design 4 5.2 Pipeline components and safety accessories5 5.3 Expansion tank (tank) 6 5.4 Oil storage tank (tank) 7 5.5 Material 7 5.6 Main parts manufacturing 9 5.7 Assembly 11 5.8 Welding 11 5.9 Ball pass test 11 5.10 Non-destructive testing11 5.11 Heat treatment 12 5.12 Pressure resistance and air tightness12 5.13 Combustion equipment12 5.14 Auxiliary engine 13 5.15 Paint and surface treatment13 5.16 Air pollutant emissions13 6 Test methods 13 6.1 Boiler energy efficiency test 13 6.2 Appearance and dimensional inspection13 6.3 Ball pass test 13 6.4 Non-destructive testing13 6.5 Pressure resistance test and air tightness test 13 6.6 Cold test run 14 6.7 Air pollutant emissions14 7 Inspection Rules 14 7.1 General 14 7.2 Factory inspection items 14 7.3 Determination Rule 14 8 Marking, packaging, transportation and storage15 8.1 Flag 15 8.2 Packaging and transportation15 8.3 Storage15 8.4 Factory files 15 Reference 17 Figure 1 Allowable dimensional deviation of cylindrical coil Figure 9 Figure 2 Allowable dimensional deviation of square box coil Figure 10 Figure 3 Plane misalignment of two adjacent pipes in a disk-shaped tube 10 Table 1 Furnace type code 3 Table 2 Combustion equipment code 3 Table 3 Furnace installation type code 3 Table 4 Rated thermal power specifications 4 Table 5 Heating source category code and variety code 4 Table 6 Nominal diameters of expansion pipes, overflow pipes, discharge pipes and vent pipes of expansion tanks (tanks) and oil storage tanks (tanks) 7 Table 7 Applicable scope of steel plate 8 Table 8 Application scope of steel pipe 8 Table 9 Forging materials 9

Foreword

This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. This document replaces GB/T 17410-2008 "Organic Heat Carrier Furnace". Compared with GB/T 17410-2008, except for structural adjustment and editing In addition to sexual changes, the main technical changes are as follows. a) Changed the content of “scope” (see Chapter 1, Chapter 1 of the.2008 edition); b) Changed the model requirements (see 4.1, 4.1.1 of the.2008 edition); c) The "Other" category is deleted in "Table 3 Furnace Installation Type Code" (see Table 3, Table 3 of the.2008 edition); d) Changed the specification requirements in the "Rated Thermal Power Specifications" series (see Table 4, Table 4 of the.2008 edition); e) The heating source category code and variety code have been changed (see 4.2.5, Table 5, 4.1.1.5, Table 5 of the.2008 version); f) The requirement of “General Provisions” is deleted (see 5.1 of the.2008 edition); g) The requirements for thermal efficiency have been changed (see 5.1.2, 5.2.2 of the.2008 edition), and "Table 6 Thermal Efficiency" has been deleted (see Table 6 of the.2008 edition); h) Changed the requirements for classification in "Design Calculated Pressure" (see 5.1.4, 5.2.4 of the.2008 edition); i) Changed the requirements for strength calculation of pressure components of organic heat carrier furnaces (see 5.1.5, 5.2.5 of the.2008 edition); j) Added the requirements for the maximum liquid film calculation temperature of the liquid phase furnace (see 5.1.6), and changed the requirements for the flow rate limit (see 5.1.6, 2008 version of 5.2.6); k) Changed the title of "Pipeline Components" (see 5.2, 5.3 of the.2008 edition), changed the standard selection of pipe flanges, gaskets, and fasteners. Requirements (see 5.2.2.1, 5.3.2.1 of the.2008 version); l) The requirements for "safety accessories" have been changed (see 5.2.3.1~5.2.3.4, 5.3.3.1~5.3.3.4 of the.2008 version), and the safety accessories have been added. Requirements for protective devices (see 5.2.3.5); m) Changed the title and requirements of “expansion tank (device)” (see 5.3, Table 6, 5.4, Table 7 of the.2008 edition); n) The title and requirements of "oil storage tank" have been changed, and the requirements for rated thermal power have been changed (see 5.4, Table 6, 5.5, Table 7 of the.2008 edition); o) Changed material requirements (see 5.5, 5.6 of the.2008 edition); p) The requirements for the allowable deviation of plane misalignment between two adjacent pipes of a coiled pipe have been changed (see 5.6.4, 5.7.4 of the.2008 edition); q) Changes have been made in pipe manufacturing, header manufacturing, furnace tube hole center distance size deviation, gas phase furnace drum manufacturing, and shell-type organic heat carrier furnace specifications. Requirements for body manufacturing, design and manufacturing of expansion tanks and oil storage tanks (see 5.6.5~5.6.10, 5.7.5~5.7.10 of the.2008 edition); r) Changed the requirements for procedures to be performed before the installation of organic heat carrier furnace boilers (see 5.7.3, 5.8.3 of the.2008 version); s) Changed the requirements for process qualification of welded joints of organic heat carrier furnaces (see 5.8.1, 5.9.1 in.2008); t) The requirements of the standards applicable to the welding of pressure components and pressure parts have been changed (see 5.8.5, 5.9.5 of the.2008 edition); u) Added requirements for ball pass test (see 5.9, 6.1 of the.2008 edition); v) The requirements for non-destructive testing have been changed (see 5.10.1~5.10.5, 5.10.1~5.10.4 of the.2008 edition); w) Added requirements for X-ray digital imaging detection (see 5.10.6); x) The requirements for heat treatment have been changed (see 5.11,.2008 version of 5.11); y) Changed the title and requirements of "Pressure Test" (see 5.12,.2008 version of 5.12); z) The requirements for applicable standards in "auxiliary machinery" have been changed (see 5.14.2~5.14.4, 5.14.2~5.14.4 of the.2008 edition); aa) Changed the requirements for "paint and surface treatment" (see 5.15.1, 5.15.1 of the.2008 edition); bb) Changed the requirements for air pollutant emission (see 5.16,.2008 version of 5.16); cc) Delete "auxiliary engine test" (see 6.5 of the.2008 edition) and "rated power" (see 6.6 of the.2008 edition) in "Test Methods", Added boiler energy efficiency test (see 6.1); dd) Added requirements for appearance and dimensional inspection (see 6.2); ee) Changed the ball passing test method (see 6.3, 6.1 of the.2008 edition); ff) Changed the non-destructive testing method (see 6.4, 6.2 of the.2008 edition); gg) Changed the "pressure test" (see 6.5, 6.3 of the.2008 version); hh) Changed the test method of "air pollutant emission" (see 6.7, 6.7 of the.2008 edition); i) Change the title of "Inspection Classification" to "General Principles" and change the requirements for factory inspection (see 7.1, 7.2, 7.1 of the.2008 edition), The determination rules for factory inspection have been added (see 7.3), and type inspection has been deleted (see 7.3 of the.2008 edition); j) The title of Chapter 8 is changed to "Identification, Packaging, Transport and Storage" (see Chapter 8, Chapter 8 of the.2008 edition); kk) Added the requirement of “equipment code” in “marking” (see 8.1,.2008 version of 8.1); l) "Packaging" and "Transportation" are merged into "Packaging and Transportation", and the requirements for "Packaging and Transportation" are changed (see 8.2,.2008 version of 8.2, 8.3); mm) Changed the requirements for factory documentation (see 8.4, 8.5 of the.2008 edition). Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents. This document is proposed by China Petroleum and Chemical Industry Federation. This document is under the jurisdiction of the National Chemical Machinery and Equipment Standardization Technical Committee (SAC/TC429). This document was drafted by. Changzhou Energy Equipment Co., Ltd., Tianhua Chemical Machinery and Automation Research and Design Institute Co., Ltd., Ningbo Municipal Special Equipment Inspection and Research Institute, Anhui Yunde Engineering Technology Consulting Co., Ltd. The main drafters of this document. Wang Yunxiang, Ding Hong, Dou Yan, Huang Huandong, Jiang Lei, Ma Dejin, Hang Yuhong, Li Guang, Tang Yiqun, Lei Pengli. The previous versions of this document and the documents it replaces are as follows. ---First published as GB/T 17410-1998 in.1998, first revised in.2008; ---This is the second revision. Organic heat carrier furnace

1 Scope

This document specifies the model and code number, requirements, test methods, inspection rules, marking, packaging, transportation and storage of organic heat carrier furnaces. This document is applicable to fixed heating devices with a rated thermal power of not less than 0.1MW and using gas energy, liquid energy, and solid energy as heating sources. Organic heat carrier gas phase furnace (hereinafter referred to as "gas phase furnace") and organic heat carrier liquid phase furnace (hereinafter referred to as "liquid phase furnace"). This document does not apply to organic heat carrier furnaces that use electric energy as the heating source and organic heat carrier furnaces with a rated thermal power of less than 0.1MW.

2 Normative reference documents

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document. GB/T 150.3 Pressure vessels Part 3.Design GB/T 150.4 Pressure vessels Part 4.Manufacturing, inspection and acceptance GB/T 191 Packaging, storage and transportation pictorial mark GB/T 699 High-quality carbon structural steel GB/T 711 High-quality carbon structural steel hot-rolled steel plates and steel strips GB/T 713 Steel plates for boilers and pressure vessels GB/T 1226-2017 General pressure gauge GB/T 3087 Seamless steel pipes for low and medium pressure boilers GB/T 3274 Carbon structural steel and low alloy structural steel hot-rolled steel plates and strips GB/T 5310 Seamless steel pipes for high pressure boilers GB/T 5468 Boiler smoke test method GB/T 7251.1 Low-voltage switchgear and control equipment - Part 1.General principles GB/T 7251.3 Low-voltage switchgear and control equipment Part 3.Distribution boards (DBO) operated by general personnel GB/T 7251.6 Low-voltage switchgear and control equipment Part 6.Bus trunk system (bus duct) GB/T 8163 Seamless steel pipes for conveying fluids GB/T 10180 Thermal performance test procedures for industrial boilers GB/T 13306 Signage GB/T 16157 Determination of particulate matter in exhaust from stationary pollution sources and sampling method for gaseous pollutants GB/T 16507.4 Water tube boiler Part 4.Calculation of strength of pressure components GB/T 16507.5 Water tube boilers Part 5.Manufacturing GB/T 16507.6 Water tube boilers Part 6.Inspection, testing and acceptance GB/T 16508.3 Shell boilers Part 3.Design and strength calculation GB/T 16508.4 Shell boilers Part 4.Manufacturing, inspection and acceptance GB 50211 Code for construction and acceptance of industrial furnace masonry projects HJ/T 42 Determination of nitrogen oxides in exhaust gas from fixed pollution sources UV spectrophotometry HJ/T 43 Determination of nitrogen oxides in exhaust gas from fixed pollution sources Naphthylethylenediamine hydrochloride spectrophotometry HJ/T 56 Determination of sulfur dioxide in exhaust gas from stationary pollution sources Iodometric method HJ57 Determination of sulfur dioxide in waste gas from fixed pollution sources by constant potential electrolysis method
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 17410-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 17410-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 17410-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 17410-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 17410-2023?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17410-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.