GB/T 16558.3-2009 English PDFUS$149.00 ยท In stock
Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 16558.3-2009: The ship maintenance system -- Part 3: Maintenance grades, period coding and permissible deviation for maintenance period of ship Status: Valid GB/T 16558.3: Historical versions
Basic dataStandard ID: GB/T 16558.3-2009 (GB/T16558.3-2009)Description (Translated English): The ship maintenance system -- Part 3: Maintenance grades, period coding and permissible deviation for maintenance period of ship Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: R30 Classification of International Standard: 03.220.40; 47.020 Word Count Estimation: 5,527 Date of Issue: 2009-03-31 Date of Implementation: 2009-11-01 Older Standard (superseded by this standard): GB/T 16558.3-1996 Regulation (derived from): National Standard Approval Announcement 2009 No.4 (Total No.144) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the level of ship repair and maintenance work, period and the corresponding code, and the cycle tolerance limits. This section applies to ocean, coastal, manage river transport ship. Engineering vessels, management of ship and offshore facilities may refer to. GB/T 16558.3-2009: The ship maintenance system -- Part 3: Maintenance grades, period coding and permissible deviation for maintenance period of ship---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. The ship maintenance system Part 3. Maintenance grades, period coding and permissible deviation for maintenance period of ship ICS 03.220.40; 47.020 R30 National Standards of People's Republic of China Replacing GB/T 16558.3-1996 The ship maintenance system - Part 3. Ship Repair Maintenance grades, cycles and cycle tolerance codes Posted 2009-03-31 2009-11-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordGB/T 16558 "ship maintenance system" is divided into seven parts. --- Part 1. General; --- Part 2. The ship maintenance system codes; --- Part 3. Classification ship maintenance, periodic codes and cycle tolerance; --- Part 4. Equipment cards, work card format and initialization requirements; --- Part 5. work cards first row and operational requirements; --- Part 6. running system processes and management methods; --- Part 7. report format. This part of GB/T 16558 Part 3. This Part replaces GB/T 16558.3-1996 "ship maintenance ship maintenance system grading standards and codes week period Of tolerance. " This section compared with the GB/T 16558.3-1996, the main changes are as follows. --- Increasing the scope of ship and offshore installations (see Chapter 1); --- Maintenance of eight system were defined (see Chapter 2), for the first three to routine maintenance, after five to carry out planned maintenance The definition, according to the information management requirements of the original content has been simplified; --- According to the current regulatory requirements Chuanjian removed with four, six ship inspection cycle-related content. This part is proposed by the Ministry of Transport of the People's Republic of China. This part of the jurisdiction of the Ministry of Transport of the People's Republic of China Maritime Safety Administration. This section drafted by. China Ocean Shipping (Group) Corporation, Shanghai Maritime University, China Classification Society, Academy of Transportation Sciences. The main drafters of this section. Gulian Jun, Wang Guorong, Zhu hopes Wu Yuhua, Zheng Shijun. This part of the standard replaces the previous editions are. --- GB/T 16558.3-1996. The ship maintenance system - Part 3. Ship Repair Maintenance grades, cycles and cycle tolerance codes1 ScopeThis section GB/T 16558 specifies the level of the cycle and the corresponding code ship maintenance work, and the period of tolerance limit. This section applies to ocean, coastal, river transport ship management. Engineering vessels, ship management and marine facilities will be implemented by reference. Develop principles and level 2 ship maintenance period 2.1 maintenance level according to the actual needs of the ship as eight, the first three for the daily maintenance level after level five for the planned maintenance No, and plans to demand the establishment of the maintenance work cards. 2.2 Maintenance work five cards, the cycle should inspect standards and comply with the requirements of ship maintenance, a five-year cycle cycle. 2.3 Periodic maintenance operation of equipment according to different situations, respectively, using the cumulative counter equipment "operating hours" and two timing party calendar date law. The former is called timing cycle; the latter is called a regular cycle. 2.4 the same device in different maintenance levels according to the number of cycles the value of the relationship between high-level cycle principle of low-level cycle integer multiples OK.3 The ship maintenance cycles and classification codesShip repair and maintenance cycles, classification code, and the timing system regularly made provisions in Table 1. Table 1 Classification Codes regularly develop cycle when the system A five-year 1 day1 weekJanuary March June December 30 months 60 Months 1 day1 week500 operating hours 1500 operating hours 3000 operating hours 6000 operating hours 15,000 operating hours 30,000 operating hours4 Use the maintenance cycle codePress the same device can ship inspection and maintenance work required to set a variety of code within a loop system at regular intervals with the timing system works For the card. Example. If a repair equipment (parts) containing a D grade three-month period, the period of one year for the F-class, H period of five years three maintenance, its five-year A cycle ticket arrangements. DDDF, DDDF, DDDF, DDDF, DDDH.5 maintenance cycle tolerance level5.1 Periodic maintenance level tolerance limits in Table 2. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 16558.3-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 16558.3-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 16558.3-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 16558.3-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 16558.3-2009?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 16558.3-2009 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |