Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 15969.2-2024 English PDF

US$1874.00 ยท In stock
Delivery: <= 10 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 15969.2-2024: Programmable controllers - Part 2: Equipment requirements and tests
Status: Valid

GB/T 15969.2: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 15969.2-20241874 Add to Cart 10 days Programmable controllers - Part 2: Equipment requirements and tests Valid
GB/T 15969.2-20081914 Add to Cart 8 days Programmable controllers -- Part 2: Equipment requirements and tests Valid
GB/T 15969.2-1995RFQ ASK 11 days Programmable controllers. Part 2: Equipment characteristics Obsolete

Similar standards

GB/T 41251   GB/T 32828   DL/T 680   GB/T 15969.10   GB/T 15969.9   GB/T 15969.3   

Basic data

Standard ID: GB/T 15969.2-2024 (GB/T15969.2-2024)
Description (Translated English): Programmable controllers - Part 2: Equipment requirements and tests
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: N18
Classification of International Standard: 25.040.99
Word Count Estimation: 94,960
Date of Issue: 2024-11-28
Date of Implementation: 2025-06-01
Older Standard (superseded by this standard): GB/T 15969.2-2008
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 15969.2-2024: Programmable controllers - Part 2: Equipment requirements and tests

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 25.040.99 CCSN18 National Standard of the People's Republic of China Replaces GB/T 15969.2-2008 Programmable Controller Part 2.Equipment requirements and tests Released on 2024-11-28 2025-06-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction V 1 Scope 1 2 Normative references 2 3 Terms, Definitions and Abbreviations 4 4 Declaration of Conformity and Type Test 9 5 Normal working conditions and requirements 18 6 Functional Requests 27 7 Electromagnetic compatibility (EMC) requirements 52 8 Marking requirements and information to be provided by the manufacturer 61 Appendix A (Informative) Relationship between temperature derating and altitude 71 Appendix B (Informative) Digital Input Standard Operating Range Formula 74 Appendix C (Normative) Zone C - EMC Immunity Level 76 Appendix D (Normative) Obsolete legacy technologies (not recommended for new product development) 79 Appendix E (Informative) Applied Reasoning for AC and DC Interruptions 82 Appendix F (Normative) Digital I/O. Sourcing Input and Sinking Output 83 References 86

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 2 of GB/T 15969 "Programmable Controllers". GB/T 15969 has published the following parts. --- Part 1.General information; --- Part 2.Equipment requirements and tests; --- Part 3.Programming languages; --- Part 4.User Guide; --- Part 5.Communications; --- Part 6.Functional safety; --- Part 7.Fuzzy control programming; --- Part 8.Application and implementation guidelines for programming languages; --- Part 9.Single-point digital communication interface (SDCI) for small sensors and actuators; --- Part 10.XML open exchange format for PLCs. This document replaces GB/T 15969.2-2008 "Programmable controllers Part 2.Equipment requirements and tests" and GB/T 15969.2- Compared with.2008, in addition to structural adjustments and editorial changes, the main technical changes are as follows. --- Deleted the safety requirements and quoted IEC 61010-2-201 (see Chapter 11 to Chapter 14 of the.2008 edition); --- Added negative logic digital input and output (see 6.4.3, Appendix F); --- Added 3-D digital input (see 6.4.4.3); --- Added the requirements for radio frequency electromagnetic amplitude modulation immunity from 2.7 GHz to 6 GHz (see 7.3, Appendix C); --- Added temperature test instructions (see 4.2.6); --- Added type test instructions (see 4.2.1, 4.2.10); --- Deleted some technologies that are no longer recommended (see Chapter 10 of the.2008 edition); --- Changed various functional requirements and EMC requirements (see Chapter 6 to Chapter 7, Chapter 5, Chapter 8 and Chapter 9 of the.2008 edition); --- Changed some clauses to more closely link requirements and verification (see Chapter 4, Chapter 5, Chapter 8, Chapter 4,.2008 Edition Chapter 6, Chapter 7). This document is equivalent to IEC 61131-2.2017 "Industrial process measurement and control programmable controllers Part 2.Equipment requirements and test". The following minimal editorial changes were made to this document. --- To be consistent with the existing standards, the name of the standard is changed to "Programmable Controllers Part 2.Equipment Requirements and Tests". Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Machinery Industry Federation. This document is under the jurisdiction of the National Industrial Process Measurement, Control and Automation Standardization Technical Committee (SAC/TC124). This document was drafted by. Beijing Institute of Automation of the Mechanical Industry Co., Ltd., Hangzhou Dianzi University, Guangdong Midea Intelligent Technology Co., Ltd., China Electronics Intelligent Technology Co., Ltd., Supcon Technology Co., Ltd., Shenzhen INVT Electric Co., Ltd., Beijing Hollysys Systems Engineering Co., Ltd., Shanghai Jiao Tong University, Shenzhen Automation Society, Hangzhou Yiyi Taidi Information Technology Co., Ltd., Shenzhen Xian Control Technology Co., Ltd., National Pipeline Network Group Northern Pipeline Co., Ltd., Changzhou Tianli Intelligent Control Co., Ltd., Hunan Super String Technology Co., Ltd., Shenzhen Yiwei Automation Technology Co., Ltd., Shanghai Senke Electronic Technology Co., Ltd., Zhongluan Technology Co., Ltd. Co., Ltd., Changsha Shuobo Electronic Technology Co., Ltd., Shenzhen Hexin Automation Technology Co., Ltd., Beijing Mitian Technology Co., Ltd. company. The main drafters of this document are. Wang Kai, Wu Huifeng, Yang Dasheng, Guo Xiaowang, Shi Ying, Liu Xin, Yu Kuo, Sun Jiexiang, Sun Danfeng, Wang Zifan, Jiang Ming, Zhu Yiming, Xue Jingwan, Zhu Shanying, Yang Jun, Zhao Yanan, Jiang Jiang, Lu Weijun, Xu Qimin, Shi Wei, Gong Liming, Song Bin, Wang Sunjun, Leng Liufang, Chen Weidong, Li Jiwei, Sun Hu, Han Guoqing, Guo Yanrui, Zhou Yunyu, Pi Yangjiang, Hu Junjie, Xu Jian, and Zhu Jingqiang. This document was first issued in.1995, revised for the first time in.2008, and this is the second revision.

Introduction

Since its introduction, programmable controllers have been widely used in various fields of industrial automation and have become an important component of industrial automation systems. The development of programmable controller technology is very rapid. The application range has expanded from logic control to motion control, process control, batch control, etc. control, recipe control, etc.; the control range is expanded from a single machine to the entire workshop and even the entire factory and radio remote control, thus covering a part of The application fields of programmable controllers are divided into distributed control systems (DCS), numerical control systems (NC), and robot control systems. In short, programmable controllers have been continuously Expand towards vertical and horizontal integration. GB/T 15969 PLC series standards have been continuously revised and expanded with the development of PLC technology. The software, hardware, peripherals and related guidelines of the programmable logic controller (PLC) are systematically standardized and are intended to be composed of ten parts. --- Part 1.General information. The purpose is to establish the relevant definitions of programmable controllers and their peripherals, and to confirm the Key features relevant to the selection and application of program controllers and their peripherals. --- Part 2.Equipment requirements and tests. The purpose is to provide equipment requirements and related tests for programmable controllers and their peripherals. Inspection regulations. --- Part 3.Programming languages. The purpose is to define the semantics and syntax of the most commonly used programming languages for programmable controllers. --- Part 4.User Guide. The purpose is to provide PLC end users with general information about GB/T 15969 and to help them Select PLC equipment and technical specifications according to GB/T 15969 series standards. --- Part 5.Communication. The purpose is to define the communication between programmable controllers and other electronic systems. --- Part 6.Functional safety. The functional safety requirements for programmable controllers and related peripherals are specified. The purpose is to establish and describe the safety lifecycle elements of functional safety programmable controllers and to integrate them with IEC 61508 Parts 1, 2 and 3. The general safety lifecycle identified in the --- Part 7.Fuzzy control programming. Fuzzy control programming language, fuzzy control application integration GB/T 15969.3 programming The basic methods in the language are specified to provide a basis for the interactive transplantation of fuzzy control programs between different programming systems. Provide basis. --- Part 8.Application and implementation guidelines for programming languages. The purpose is to help users use the programming languages defined in Part 3. language for software development. --- Part 9.Single-point digital communication interface (SDCI) for small sensors and actuators. For PLC master stations and devices The Single-Point Digital Communications Interface (SDCI) specifies the communications services and protocols for the digital communications interface in Part 2. The IO interface is expanded to SDCI. --- Part 10.XML open interaction format for PLC. The purpose is to define the XML interaction format of GB/T 15969.3. It can realize the exchange of GB/T 15969.3 programs or even the entire GB/T 15969.3 project in different development environments. This document is part of a series of standards for programmable controllers and should be read in conjunction with the other parts of the series, but can also be read independently. If there is a conflict between this document and other IEC standards, the provisions of this document shall prevail. The field of industrial control equipment includes programmable controllers and related peripherals. This document specifies the following equipment requirements and tests for industrial control equipment. --- Test and verification methods (Chapter 4); ---Operating conditions (5.2); --- Temperature and climate test (5.2.1); --- Mechanical requirements and tests (5.3); --- Functional requirements and tests for power supplies, I/O and other components (Chapter 6); --- Electromagnetic compatibility (EMC) requirements and tests (Chapter 7); --- Marking and documentation requirements (Chapter 8). The product safety requirements for PLCs and other types of industrial control equipment currently within the scope of this document are in IEC 61010-2-201. 2017, this document directly quotes these provisions, thereby replacing Chapters 11 to 14 of GB/T 15969.2-2008. Require. Temperature derating for operating conditions and altitude complies with IEC 61010-2-201.2017. Programmable Controller Part 2.Equipment requirements and tests

1 Scope

This document specifies the functions, electromagnetic compatibility requirements and related verification tests for the following industrial control equipment. ---Programmable logic controller (PLC); ---Programmable automatic controller (PAC); ---Remote I/O; ---Programming and debugging tools (PADTs); ---Industrial PC and Industrial Panel PC; ---Display devices and human-machine interfaces (HMI) for industrial use; ---Distributed control systems (DCS) and DCS components listed in this scope; ---Any product whose primary purpose is to perform the functions of an industrial control device, including PLC and/or PAC, and/or its related peripherals Equipment whose intended use is to control and command machines, automated manufacturing and industrial processes such as discrete, batch and continuous control. In this document, "control equipment" is equivalent to "industrial control equipment", just as programmable logic controllers (PLCs) and programmable automation controllers (PAC) relationship. Figure 1 Equipment within and outside the scope
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 15969.2-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 15969.2-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 15969.2-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 15969.2-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 15969.2-2024?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 15969.2-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.