GB/T 14286-2021 English PDFUS$559.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 14286-2021: Terminology for live working tools, devices and equipment Status: Valid GB/T 14286: Historical versions
Basic dataStandard ID: GB/T 14286-2021 (GB/T14286-2021)Description (Translated English): Terminology for live working tools, devices and equipment Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K09 Word Count Estimation: 28,242 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 14286-2021: Terminology for live working tools, devices and equipment---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Terminology for live working tools, devices and equipment ICS 01.040.29 CCSK09 National Standards of People's Republic of China Replace GB/T 14286-2008 Terminology for live working tools and equipment (IEC 60743.2013, Liveworking-Terminologyfortools, devicesand equipment,MOD) Released on 2021-08-20 2022-03-01 implementation State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee Table of contentsForeword Ⅲ 1 Scope 1 2 Normative references 1 3 Insulating rod 1 4 General tool accessories 3 5 Insulation and shielding equipment 5 6 Bypass equipment 6 7 Special hand tools 7 8 Personal protective equipment and accessories 8 9 Climbing and manned equipment 10 10 Loading and unloading and anchoring devices 10 11 Testing equipment 12 12 Complete load-bearing device 13 13 Stringing equipment 14 14 Grounding and short-circuit device 14 15 Electric cleaning equipment 15 16 Live working vehicles 16 Index 17ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. This document replaces GB/T 14286-2008 "Terms of Live Working Tools and Equipment". Compared with GB/T 14286-2008, except for structural adjustment In addition to the overall and editorial changes, the main technical changes are as follows. ---The term of non-tool equipment has been deleted (see Chapter 2 of the.2008 edition); ---Added the terminology of tools and equipment such as insulation lock rods, bypass operation equipment, shielding clothing, insulator string distributed electric field detection devices (see section Chapter 3, Chapter 6, Chapter 8, Chapter 11). This document uses the redrafting law to amend and adopt IEC 60743.2013 ``Terminology for Live Working Tools, Equipment and Equipment'', which is in line with IEC Compared with 60743.2013, the technical differences and their reasons are as follows. ---The terminology of the same functional tool and equipment has been merged. For example, "insulated wrench" refers to the combination of "single-head wrench", "torx wrench" and "socket wrench". Combination of tool terms such as "hand" (see Chapter 5, Chapter 7, Chapter 9, Chapter 10); ---The terminology of tools and equipment such as personal arc protection products and live working vehicles has been added (see Chapter 8 and Chapter 16). This document has made the following editorial changes. ---Modified the standard name. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Technical Committee for Standardization of Live Work (SAC/TC36). Drafting organizations of this document. China Electric Power Research Institute Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Changzhou Power Supply Branch, State Grid Shandong Electric Power Company, State Grid Fujian Electric Power Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Wuxi Power Supply Branch, State Grid Hubei Electric Power Co., Ltd. Power Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Anhui Electric Power Co., Ltd., State Grid Sichuan Electric Power Company Maintenance Company, Wuhan University, Guangdong Power Grid Co., Ltd. Foshan Power Supply Bureau. The main drafters of this document. Peng Yong, Liu Kai, Chen Hong, Lei Xinglie, Zuo Xinbin, Tang Pan, Wang Linong, Liu Ting, Xiao Bin, Gong Hangzhang, Li Sheng, Guo Xuan, Shen Haiping, Yan Bo, He Huiwen, Yang Xiaoxiang, Qiu Zhonghua, Hu Cong, He Ying, Song Bin. The previous versions of this document and the documents replaced are as follows. --- First published as GB/T 14286-1993 in.1993, the first revision in.2002, and the second revision in.2008; ---This is the third revision. Terminology for live working tools and equipment1 ScopeThis document defines insulation rods, general tool accessories, insulation shielding appliances, bypass equipment, special hand tools, personal protection Terms and definitions of protective equipment and accessories, climbing and manned equipment and other tools and equipment. This document is suitable for the formulation and revision of live working standards, and the compilation and translation of professional literature.2 Normative referencesThere are no normative references in this document.3 Insulating rod3.1 Joystick 3.1.1 Joystick It is made of insulating pipes or insulating rods with or without end accessories, and the live parts are operated at a minimum safe distance by manual operation. Industry tools. 3.1.2 Tiestick An operating rod used to tie or untie wires on an insulator. 3.1.3 Hookstick Retractable hookstick The operating lever for installation, removal, and tightening of devices with holes. 3.1.4 Wireholdingstick An operating rod used to clamp and fix wires or other conductors. 3.1.5 Pliersstick An operating rod for clamping or assembling and disassembling various small parts. 3.1.6 Oilstick Operating lever for adding lubricating oil or anti-rust agent. 3.1.7 Wirecutterstick An operating lever for cutting wires. 3.1.8 Bindingwirecutterstick bindingwirecutterstick The operating rod used to cut the lashing line. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 14286-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 14286-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 14286-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 14286-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 14286-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 14286-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |