GB/T 13760-2009 English PDFUS$114.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 13760-2009: Geosynthetics -- Sampling and preparation of test specimens Status: Valid GB/T 13760: Historical versions
Basic dataStandard ID: GB/T 13760-2009 (GB/T13760-2009)Description (Translated English): Geosynthetics -- Sampling and preparation of test specimens Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: W59 Classification of International Standard: 59.080.70 Word Count Estimation: 6,680 Date of Issue: 2009-06-11 Date of Implementation: 2010-01-01 Older Standard (superseded by this standard): GB/T 13760-1992 Quoted Standard: GB 14798 Adopted Standard: ISO 9862-2005, IDT Regulation (derived from): National Standard Approval Announcement 2009 No.9 (Total No.149) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the sampling method geosynthetics and sample preparation methods. This standard sampling method is suitable for geosynthetics roll supply. This standard sample preparation methods are applicable to all geosynthetics. GB/T 13760-2009: Geosynthetics -- Sampling and preparation of test specimens---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Geosynthetics. Sampling and preparation of test specimens ICS 59.080.70 W59 National Standards of People's Republic of China GB/T 13760-2009/ISO 9862.2005 Replacing GB/T 13760-1992 Geosynthetics sampling and sample preparation (ISO 9862.2005, IDT) Posted 2009-06-11 2010-01-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordThis standard uses the translation method is equivalent to using ISO 9862.2005 "Geosynthetics sampling and sample preparation." This standard ISO 9862.2005 compared with the following editorial changes. --- Normative references to international standards in the file are replaced by the corresponding national standards; --- Delete the note range of content. This standard replaces GB/T 13760-1992 "Geotextiles sampling and sample preparation." This standard compared with GB/T 13760-1992 The main differences are as follows. --- Standard name was changed to "geosynthetics sampling and sample preparation"; --- Increasing the normative references; --- Extend the application range from "geotextile" to "Geosynthetics"; --- Sampling and sample preparation step refinement; --- Increased 3.2.2 Note 1, 2; --- Increase the informative Appendix A. Appendix A of this standard is the data appendix. The standard proposed by China Textile Industry Association. This standard by the National Standardization Technical Committee on Basic Standards Subcommittee Textiles (SAC/TC209/SC1) centralized. This standard is mainly drafted by. Southern Textile Industry Science and Technology Test Center, Textile Industry Research Institute of Standardization. The main drafters of this standard. Dong Xiang, Zhang Minjie, Xu Jie, Zhang Hui. This standard replaces the standards previously issued as follows. --- GB/T 13760-1992. GB/T 13760-2009/ISO 9862.2005 Geosynthetics sampling and sample preparation1 ScopeThis standard specifies the method of sampling of geosynthetics and method of preparing the sample. The standard sampling method is applicable to geosynthetics package supply. Sample preparation method of this standard are applicable to all geosynthetics.2 Normative referencesThe following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, according to the study estimated that the parties to the agreement Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 14798 Geosynthetics site identification identification (GB/T 14789-2008, ISO 10320.1999, IDT)3 Steps3.1 Sampling Select the 3.1.1 package 3.1.1.1 For each test product, the number of samples by the agreement between the parties concerned (see Appendix A). 3.1.1.2 In addition to the relevant requirements of the test, the selected package should be no damage, intact shape into a package. 3.1.2 clipping samples 3.1.2.1 cut before samples were taken, the relevant test standard should obtain information about the number, shape, and any other requirements of the specimen. 3.1.2.2 Volume Header should not take two loaded samples do. 3.1.2.3 in the package perpendicular to the machine direction (production direction, that is wound in the longitudinal direction) and cut the entire width direction of the sample, the sample to be Long enough to obtain the required number of samples. According to the standard method of sample preparation (see 3.2). 3.1.2.4 Except as provided in 3.1.1.2, the sample should not damage specified in section 3.2.4, it should be avoided to take part in these injuries Like; or clipping large enough sample to obtain a number of samples needed. 3.1.3 labeled samples By labeling the sample GB/T 14798 requirements. 3.2 Sample Preparation 3.2.1 When sampling and sampling, samples should be taken to ensure its physical state does not change before the test. For example, clay impervious geotextile To maintain a certain moisture content in the film should be sampled. 3.2.2 As temporarily cut sample taken, samples should be stored in a dry, clean, dark place to prevent contamination by chemical etching and mechanical damage. Note 1. The sample can be rolled up, but can not be folded. Note 2. GB R-R sample neither rolled nor folded. 3.2.3 for each test sample, the sample should be evenly and cut the length and width directions, and from the edge of the sample at least 100mm. 3.2.4 Except as provided in 3.1.1.2, and cut the specimen should be uniform, not dirt, creases, holes or other in the production process Produced visual defects. 3.2.5 with a trial, unless the test standard requires otherwise, should be avoided at least two samples and the same longitudinal or transverse To the position. If unavoidable (such as narrow package) should be indicated in the test report. 3.2.6 In addition to the need to take additional samples, the sample should be cut taken along the longitudinal and transverse directions. Marked longitudinal sample when needed, on a sample of longitudinal Tags also need to mark on the sample, or the sample respectively vertical and horizontal placed separately to avoid confusion. GB/T 13760-2009/ISO 9862.2005 ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 13760-2009_English be delivered?Answer: Upon your order, we will start to translate GB/T 13760-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 13760-2009_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 13760-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 13760-2009?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 13760-2009 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |