GA/T 527.1-2015 English PDFUS$229.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GA/T 527.1-2015: Road traffic signal control mode - Part 1: General technical requirements Status: Valid GA/T 527.1: Historical versions
Basic dataStandard ID: GA/T 527.1-2015 (GA/T527.1-2015)Description (Translated English): Road traffic signal control mode - Part 1: General technical requirements Sector / Industry: Public Security (Police) Industry Standard (Recommended) Classification of Chinese Standard: R87 Classification of International Standard: 93.080.30 Word Count Estimation: 10,189 Date of Issue: 2015-02-11 Date of Implementation: 2015-10-01 Older Standard (superseded by this standard): GA/T 527-2005 Quoted Standard: GB 50647-2011; GB/T 31418 Regulation (derived from): Notice on Publication of Public Safety Industry Standard (Year 2015); Industry Standard Record Announcement No. 2016 (No. 197) Issuing agency(ies): Ministry of Public Security Summary: This standard specifies general technical conditions such as the development of road traffic signal control scheme, control method classification, applicable conditions, phase phase sequence setting, steering dedicated signal setting and signal timing. This standard is applicable to the design and application of road traffic signal control mode. GA/T 527.1-2015: Road traffic signal control mode - Part 1: General technical requirements---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Road traffic signal control mode.Part 1. General technical requirements ICS 93.080.30 R87 People's Republic of China Public Security Industry Standards Replacing GA/T 527-2005 Road traffic signal control Part 1. General requirements Issued on. 2015-02-11 2015-10-01 implementation People's Republic of China Ministry of Public Security ForewordGA/T 527 "Road traffic signal control" is divided into the following sections. --- Part 1. General requirements; --- Part 2. access status and control benefit assessment indicators and methods; --- Part 3. a single point of control signal applicable conditions; --- Part 4. Route coordinated signal control method applicable conditions; --- Part 5. variable guide lane traffic control rules; --- Part 6. Bus lane traffic priority control rules; --- Part 7. Tram Intersection priority control rules; --- Part 8. Tide lane traffic control rules; --- Part 9. Ramp control rules. This section GA/T Part 1 527. This section drafted in accordance with GB/T 1.1-2009 given rules. This Part replaces GA/T 527-2005 "Urban Traffic Signal Control mode applicable codes." And GA/T 527-2005 phase Ratio, in addition to editorial changes outside the main technical changes are as follows. --- Modify the standard name (see standard name, the 2005 version of the standard name); --- Modify the scope of application (see Chapter 1, Chapter 1 of the 2005 edition); --- Increasing the definition of traffic signal control mode (see 3.1); --- Increasing the signal control programming principles and work content (see 4.1, 4.2); --- Modify the control signal classification (see Chapter 5, Section 4 of the 2005 edition); --- Modifications and additions signal control applicable conditions (see Chapter 6, Chapter 4, 2005 edition); --- Remove the multi-phase control design principles (see the 2005 edition of Chapter 5); --- Increasing the signal phasing setup requirements (see Chapter 7); --- Increased steering dedicated signal setup requirements (see Chapter 8); --- Increase the signal timing requirements (see Chapter 9); --- Remove the technical - economic evaluation methods (see the 2005 edition of Chapter 6). This section is proposed and managed by the Ministry of Public Security Traffic Management Standardization Technical Committee. This section drafted by. Ministry of Public Security Traffic Management Science Institute. The main drafters of this section. Liu Dongbo, on behalf of Leilei, tree and love for soldiers, Zhang Zhiyun, Wangyun Xia, Lei Yuan, Hua Jing Yi, Qiu Hongtong, Zhao Yong Jin, Lu Lijiang. Road traffic signal control Part 1. General requirements1 ScopeGA/T of the provisions of section 527 of the Road Traffic signal control program development, control mode classification, applicable conditions, phase phase sequence settings, General technical steering special signal settings, signal timing and the like. This section applies to the design of a road traffic signal control mode.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 50647-2011 Code for planning of urban road intersections GB/T 31418 Road traffic signal control systems -3 Terms and DefinitionsGB/T 31418 and defined by the following terms and definitions apply to this document. 3.1 Road traffic signal control roadtrafficsignalcontrolmode Used in road traffic signal control system for controlling and adjusting the traffic flow state, according to the special traffic signal control programs implemented Constant control.4 control program development4.1 Principles Road traffic signal control program should be based on different traffic flow, flow, time, road conditions and environment, transport objects, transportation And other factors making. 4.2 The content Road traffic signal control program development include the following. a) Traffic Flow Survey and Analysis; b) traffic running state discrimination; c) the control objectives and strategy formulation; d) determining scheduling control; e) set the control period is divided; f) control mode selection; g) phase phase sequence set; ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA/T 527.1-2015_English be delivered?Answer: Upon your order, we will start to translate GA/T 527.1-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GA/T 527.1-2015_English with my colleagues?Answer: Yes. The purchased PDF of GA/T 527.1-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GA/T 527.1-2015?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GA/T 527.1-2015 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |