GA 1814.1-2023 English PDFUS$289.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GA 1814.1-2023: Requirements for counter-terrorism of railway system - Part 1: Passenger station Status: Valid
Basic dataStandard ID: GA 1814.1-2023 (GA1814.1-2023)Description (Translated English): Requirements for counter-terrorism of railway system - Part 1: Passenger station Sector / Industry: Public Security (Police) Industry Standard Classification of Chinese Standard: A91 Classification of International Standard: 13.310 Word Count Estimation: 14,150 Date of Issue: 2023-02-28 Date of Implementation: 2023-07-01 Issuing agency(ies): Ministry of Public Security GA 1814.1-2023: Requirements for counter-terrorism of railway system - Part 1: Passenger station---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.ICS 13:310 CCSA91 Public safety industry standards of the People's Republic of China Anti-terrorism prevention requirements for railway systems Part 1: Passenger Station Part 1:Passengerstation Published on 2023-02-28 2023-07-01 Implementation Released by the Ministry of Public Security of the People's Republic of China Table of contentsPrefaceⅠ Introduction II 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Key objectives and key parts 2 5 Key target levels and prevention levels 3 6 Overall prevention requirements 3 7 Normal three-level prevention requirements 4 8 Normal secondary prevention requirements 5 9 Normal level one prevention requirements 6 10 Abnormal prevention requirements 6 11 Technical requirements for security systems 7 Appendix A (normative) Configuration of normal prevention facilities at passenger stations 9 Reference 11ForewordThis document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document is Part 1 of GA 1814-2023 "Anti-Terrorism Prevention Requirements for Railway Systems": GA 1814-2023 has been released with Lower part: ---Part 1: Passenger transport station; ---Part 2: Passenger trains; ---Part 3: Operation lines; ---Part 4: Key places; ---Part 5: Transport of dangerous goods: This document is sponsored by the Office of the National Anti-Terrorism Leading Group, China State Railway Group Co:, Ltd:, Counter-Terrorism Bureau of the Ministry of Public Security, and the Ministry of Public Security: Proposed by the Railway Public Security Bureau and the Science and Technology Information Bureau of the Ministry of Public Security: This document is under the jurisdiction of the National Security Alarm System Standardization Technical Committee (SAC/TC100): This document was drafted by: China State Railway Group Co:, Ltd:, Counter-Terrorism Bureau of the Ministry of Public Security, Railway Public Security Bureau of the Ministry of Public Security, Science and Technology Information Technology of the Ministry of Public Security Bureau of Information and Chemical Industry, Railway Police Academy, Guangzhou Railway Public Security Bureau, Chengdu Railway Public Security Bureau, Jinan Railway Public Security Bureau, China Academy of Railway Sciences Group Ltd: The main drafters of this document: Hu Xiaohui, Lin Xiaodong, Lu Ping, Zhao Xinbin, Li Sheng, He Hengpan, Chen Ziqing, Shen Guanfu, Wu Xiangxing, Zhou Kai, Zhang Zongyuan, Li Dongdong, Sun Tao, Yang Yubo, Gao Feng, Tian Chuan, Liu Hui, Wang Shuhua, Zhang Zhengwei, Lan Lihong, Li Mingming, Wang Zhanjun, Li Jingshan, Zhou Rui, Liu Jinghui, Ji Jinglin:IntroductionRailway is the main artery of the national economy and an important infrastructure of the country: It plays an important role in the sustained, rapid and high-quality development of the national economy: the supporting role: In order to establish a long-term mechanism for anti-terrorism prevention in the railway system and improve the ability and level of anti-terrorism prevention in the railway system, according to the "China The Anti-Terrorism Law of the People's Republic of China and other relevant laws, regulations and normative documents, and GA 1814-2023 "Anti-Terrorism Prevention and Control for Railway Systems" was formulated: Standard Requirements" series of standards: GA 1814-2023 implements anti-terrorism prevention regulations for key target management units in preventing terrorist attacks in the railway system: This provides a basis for relevant departments to supervise and inspect the implementation of anti-terrorism prevention responsibilities by key target management units: According to the specific structure and scene of the railway, the key targets and key parts of preventing terrorist attacks, and the needs of the current anti-terrorist situation According to requirements, GA 1814-2023 "Anti-Terrorism Prevention Requirements for Railway Systems" is divided into 5 parts: passenger stations, passenger trains, operating lines, and key sites: , transportation of dangerous goods: ---Part 1: Passenger station: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities at passenger stations in the railway system: ---Part 2: Passenger trains: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities for passenger trains in the railway system: ---Part 3: Operational lines: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities for railway system operating lines: ---Part 4: Key places: The purpose is to provide a basis for the implementation of anti-terrorism prevention responsibilities in key places on the railway system: ---Part 5: Transport of dangerous goods: The purpose is to provide information for the implementation of anti-terrorism prevention responsibilities for the transportation of dangerous goods in the railway system: in accordance with: Anti-terrorism prevention requirements for railway systems Part 1: Passenger Station1 ScopeThis document stipulates the key targets and key parts of anti-terrorism prevention at passenger transport stations, key target levels and prevention levels, and overall prevention requirements: requirements, normal third-level prevention requirements, normal second-level prevention requirements, normal first-level prevention requirements, abnormal prevention requirements and security prevention system technology Require: This document applies to the anti-terrorism prevention work and management of passenger stations:2 Normative reference documentsThe contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document: GB 2894 Safety signs and guidelines for their use GB 12899 General technical specifications for handheld metal detectors GB 15208:1 Microdose X-ray safety inspection equipment Part 1: General technical requirements GB 15208:2-2018 Micro-dose X-ray safety inspection equipment Part 2: Transmission luggage safety inspection equipment GB 15210 General technical specifications for pass-through metal detection doors GB 17565-2022 General technical conditions for anti-theft security doors GB/T 28181 Technical requirements for information transmission, exchange and control of public security video surveillance network systems GB/T 32581 Technical requirements for intrusion and emergency alarm systems GB 35114 Public security video surveillance network information security technical requirements GB/T 37078-2018 Technical requirements for entrance and exit control systems GB 50348-2018 Safety prevention engineering technical standards GB 55029 General specifications for safety prevention engineering GA 69 explosion-proof blanket GA 844 anti-smash transparent material3 Terms and definitionsThe following terms and definitions as defined in GB 50348-2018 apply to this document: 3:1 Passenger station passengerstation Handle railway passenger transport business and provide a place with boarding and alighting functions for railway passengers: [Source: TB10100-2018, 2:0:1, with modifications] 3:2 A platform that extends a certain width from the station building's outer wall toward the city and connects various parts of the station building and the entrances and exits: ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GA 1814.1-2023_English be delivered?Answer: Upon your order, we will start to translate GA 1814.1-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GA 1814.1-2023_English with my colleagues?Answer: Yes. The purchased PDF of GA 1814.1-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |