Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

CQC-C0301-2014 English PDF

US$1679.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
CQC-C0301-2014: China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
CQC-C0301-20141679 Add to Cart 7 days China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment

Similar standards

CQC-C0302   BJS 201706   CQC-C0201.07   CQC-C0901   CQC-C0701   

Basic data

Standard ID: CQC-C0301-2014 (CQC C0301-2014; CQC-C03-01-2014; CQC-C0301-2014)
Description (Translated English): China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment
Sector / Industry: China Quality Certification Center - CCC Implementation Detailed-Rules
Classification of Chinese Standard: CQC
Word Count Estimation: 42,425
Date of Issue: 7/16/2014
Date of Implementation: 9/1/2014
Older Standard (superseded by this standard): CQC-01C-010-2013
Regulation (derived from): Notice No. 23 of the State Certification and Accreditation Administration, No. 23 of the State Certification and Accreditation Administration
Issuing agency(ies): China Quality Certification Center
Summary: This document specifies the China Compulsory Certification (CCC) implementation Detailed-Rules for Low-voltage switchgear and low voltage electrical equipment. This document defines the Low-voltage switchgear and low voltage electrical equipment's certifi

CQC-C0301-2014: China Compulsory Certification Implementation Detailed-Rules - Low-voltage switchgear and low voltage electrical equipment


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
China Compulsory Certification Implementation Detailed-Rules-Low-voltage switchgear and low voltage electrical equipment Implementation details of compulsory product certification Low-voltage electrical low-voltage switchgear CQC-C0301-2014 Classification management requirements of manufacturing enterprises Collection, analysis, evaluation and preservation of various quality products related to certified products and their manufacturing companies Relevant information, dynamic classification management of production enterprises. Certification client, producer, Production enterprises should cooperate. There are four types of production enterprises. The classification is based on the following information. ① Factory inspection (including initial factory inspection and follow-up inspection after certification); ② Supervision sampling test results (sampling at production site or market); ③ National, provincial and special spot checks; ④ Media exposure and quality information feedback from product users and the public; ⑤ Quality status of certified products; ⑥ Other information. Classification and classification of production enterprises based on the basic principles of classification, and according to various types of information Regularly or irregularly reclassify and grade production enterprises to achieve dynamic management. The basic principles of classification are carried out in accordance with the public documents of the Management Requirements for Enterprise Classification. Selection of authentication mode and related requirements Basic mode of authentication The basic modes of implementing compulsory product certification for low-voltage switchgear are. Follow-up inspection after type test certification; Follow-up inspection after the type test of design appraisal for some items. Specific details of the authentication model According to the basic mode of certification, combined with the classification management principles of production enterprises, the details are as follows. Mode. Supervision after Type Test Mode. Type test enterprise quality assurance capability and product consistency check (initial Factory inspection) supervision after certification Mode. Supervision after type approval of some projects of design appraisal Mode. Design and appraisal of part of project type test enterprises' quality assurance capabilities and Product consistency check (initial factory inspection) Supervision after certification For the mode and mode, it is considered necessary, and it can be Perform design capability evaluation. Post-certification supervision generally refers to follow-up inspection after certification. For businesses in different categories, After obtaining the certificate, supervision can be added to the production site to take samples for testing or inspection, market sampling testing or Check for other pattern elements. Applicability of the certification model Does not use design certification For production enterprises to obtain certificates for products within the scope of this rule Line of initial certification application, Production enterprises. can adopt the mode to implement certification; Category, category, and category manufacturing enterprises. should adopt a model to implement certification. For production enterprises that have obtained certificates for products within the scope of this rule Re-certification application, and the factory definition code is different from the certified factory definition code, and cannot be Covered by a certified factory definition code, Category and category manufacturing enterprises. can adopt the mode to implement certification; Category and category manufacturing enterprises. They should adopt a model for certification. For production enterprises that have obtained certificates for products within the scope of this rule Re-certification application, and the factory definition code is the same as the certified factory definition code, or Covered by certified factory definition codes, Class, class, class, and class production enterprises. The model can be used for certification. Adopt design certification Only class and class manufacturers can use the model when applying for certification Or model implementation certification, and the producer and manufacturer should have the corresponding design capabilities and Benchmark data for design qualification. Design Capability Evaluation Evaluate producers' production enterprises through document review and/or on-site review Whether the industry has the corresponding design capabilities and benchmark data for design qualification. On-site review can In conjunction with the enterprise quality assurance capability check. If the design capability evaluation meets the requirements, certification can be implemented by using a model or a model; If the design capability evaluation does not meet the requirements, the certification shall be implemented using a model or models. For production enterprises without obtaining certificates for products within the scope of these rules Application for initial certification, Production enterprises. can adopt the mode to implement certification; Production enterprises. should adopt the model for certification. In principle, for integrated power capacitor compensation devices, the compensation capacity can cover the minimum voltage. Container capacity The division of the distribution cabinet (box) with compensation is based on the table, In principle, the lower limit of its compensation capacity coverage is the minimum branch capacitor capacity. Coverage principles for products within the same certification unit Standard series products can have multiple rated voltage levels in the same unit. Under the same rated short-time withstand current, the same insulation voltage, and the same structure, the high amount Constant voltage products can cover low rated voltage products. Under the condition of the same rated current and the same structure, products with high protection level can be covered. Covering products with low protection level; the same certification unit can also have different housing protection levels. When applying for certification, the certificate client shall describe the products with different protection levels and shall evaluate them. Corresponding temperature rise limit and necessity of protection level verification. The principle of moderately relaxing the division of units according to the classification management of production enterprises In principle, under the premise of ensuring that the certification results are valid and the management is controlled, The application of the certificate client is moderately combined with the classification management and certification risk control principles of the manufacturing enterprise. Wide cell division. Planning of certification units for different certification clients, different producers, and different production enterprises Implementation, Sub-principle Different certification clients, different producers (manufacturers), different production enterprises (production Factory) products should be used as different application units. The same product produced by the same producer (manufacturer) and different production enterprises (production plants) When the production enterprise is a class, the type test design identification can be performed in only one unit. Products produced by other types of manufacturing enterprises must provide product conformity declarations, product descriptions And other materials are checked by the laboratory; for products of the manufacturing enterprises of the same type, each unit requires Carry out type test design qualification. The same product produced by different producers and the same production enterprise, and the product design side is the same, Then the type test design identification can be performed on only one sample of the unit. Sample data shall be provided for consistency check, and if necessary, it may be verified through tests. Certification process and time frame requirements Application for and acceptance of certification The certification client submits an application for certification via the Internet (). Shen When requested, you should fill in the company information and product information, and if necessary, provide the business registration certificate, Organization code, industrial policy compliance certificate, product description, agreement, etc. Review the application in accordance with relevant requirements and send it for acceptance or rejection within one working day Notification of acceptance, or requesting the certification client to re-apply for certification after rectification. After accepting the certification application, determine the application site according to the classification management requirements of the manufacturing enterprise. Applicable certification models and divisions, formulate certification schemes and notify certification clients. The authentication client can propose the authentication mode and Unit division requirements, providing the necessary information, will be based on the classification management results of production enterprises and The client negotiates and determines the applicable authentication mode and unit division. Consensus accepted Please also formulate an authentication scheme; if the negotiation is inconsistent, the client may use other applicable authentication models Application for modification of formula and unit. Certification scheme The certification center shall formulate a certification scheme within one working day after acceptance and notify it of certification Client. Certification schemes usually include the following. () The authentication mode and unit division used; () List of application materials to be submitted; () Laboratory information; () The required certification process and time limit; () Estimated certification costs; () Contact information of the staff of the certification center; () Responsibility arrangements of certification parties in all aspects of certification implementation; () Other matters that need to be explained. Application Information Review After the application is accepted, the accreditation client shall submit to Provide relevant application materials and technical materials. And or the laboratory shall, within one working day, update the relevant information provided by the certification client Audit, and send notification of the results of the data review to the certification client. If the data does not meet the requirements, The certification client shall make corrections as required. 5.4 The certification client shall be responsible for the authenticity of the information provided. And laboratory commissioned for certification The authentication information provided by a person shall be managed and stored, and shall bear the obligation of confidentiality. Type test For certification applications that require type testing, and the application data is qualified, Formulate a type test plan within one working day and notify the certification client. Type test party The plan includes sample requirements and quantities, testing standards and items, and laboratory information. Usually, the certification client prepares the samples according to the requirements of the type test plan and sends them to Designated laboratories; if necessary, for type and type manufacturing enterprises, type tests The requirements of the plan are to obtain samples by way of on-site sampling and sealing and send them to the client Scheduled laboratory. After receiving the samples, the laboratory shall check the samples according to the relevant regulations within the working day. Review the authenticity and notify the results of the review Test results, issue test notices or take appropriate action The laboratory arranges sample testing after receiving the test notification, and the test time generally does not exceed Working days (calculated from the date of issuing the test task, excluding the Time required for rectification and retesting), and type test time may be appropriate when there are environmental test items When extended to working days When there are unqualified items in the test, the certification client is allowed to make rectifications; It is completed within the prescribed time limit. If the time limit is exceeded, the client shall be deemed to have abandoned the application; The trustee may also voluntarily terminate the application. After the type test is completed, the laboratory shall issue a type test report in the prescribed format, and The relevant provisions of the prototype verification shall dispose of the test samples and related materials. Design qualification For certification applications that use design certification for certification, the certification client must provide The design appraisal report and related materials completed by the producer shall be sent to the laboratory within one working day Notice of design qualification review. Design identification provided by the laboratory within one working day after receiving the relevant information Report and related information for review, issue audit report (including audit results, Step test recommendations, etc.). After receiving the audit report, formulate a type test plan within working days and notify Certification client. The requirements of other processes and time frames are the same as those of "type test". Within a working day
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of CQC-C0301-2014_English be delivered?

Answer: Upon your order, we will start to translate CQC-C0301-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of CQC-C0301-2014_English with my colleagues?

Answer: Yes. The purchased PDF of CQC-C0301-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.