CJ/T 233-2016 English PDFUS$1219.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. CJ/T 233-2016: (Building area drainage plastic inspection wells) Status: Valid CJ/T 233: Historical versions
Basic dataStandard ID: CJ/T 233-2016 (CJ/T233-2016)Description (Translated English): (Building area drainage plastic inspection wells) Sector / Industry: Urban Construction Industry Standard (Recommended) Classification of Chinese Standard: P41 Classification of International Standard: 91.140.80 Word Count Estimation: 53,594 Date of Issue: 2016-08-08 Date of Implementation: 2017-02-01 Older Standard (superseded by this standard): CJ/T 233-2006 Regulation (derived from): Ministry of Housing and Urban - Rural Development Notice No.1233 of 2016 Issuing agency(ies): Ministry of Housing and Urban-Rural Development of the People's Republic of China CJ/T 233-2016: (Building area drainage plastic inspection wells)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.(Building area drainage plastic inspection wells) ICS 91.140.80 P41 People's Republic of China urban construction industry standards Replacing CJ/T 233-2006 Building drainage plastic inspection wells 2016-08-08 released 2017-02-01 Implementation Ministry of Housing and Urban-Rural Development, People's Republic of China released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and Definitions, Abbreviations 1 4 Structure, classification and marking 3 5 material 4 6 Requirements 5 7 Test methods 10 8 Inspection rules 14 9 logo, packaging, transportation and storage 15 Appendix A (Informative) Plastic Inspection Well Block Specifications 17 Appendix B (informative) inspection well accessories 37 Appendix C (informative) plastic inspection manhole cover 42 ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard instead of CJ/T 233-2006 "plastic drainage wells for construction inspection wells" This standard is CJ/T 233-2006 "building drainage drainage plastic inspection wells" revision, compared with the CJ/T 233-2006 main Technical changes are as follows. --- Modify the scope of inspection wells (see Chapter 1); --- Added borehole ID code connected with ID pipe (see 4.3); --- Modify wellhead axial load performance requirements (see 6.1.6); --- Increase the inspection well system performance requirements (see 6.5); --- Increasing the size of the wells of different specifications diameter Sediment chamber size requirements (see 6.1); --- Increasing wellhead and wellbore connection socket should have 360 ° steps, the bottom of the well should be set to support the requirements of a stable structure (see 6.1); --- Increase the borehole and ID logo buried pipeline connection socket size requirements for the diameter (see 6.1); --- Remove the inspection wells and wellbore adhesive connection socket (see.2006 version 7.4); --- Adjust the connection between wellbore and pipe joints without socket elastic seal the minimum length of the socket (see 6.1); --- Increased pavement rain outlet positive, lateral socket structure (see Appendix B); --- Increasing the inspection wells connected buried pipe socket and pipe clearance requirements (see 6.1); --- Increasing the diameter of the plastic cover seat hole center hole diameter requirements and the same borehole, modified some of the plastic cover size parameters, at the same time Increase the requirements of the corresponding bearing mark on the manhole cover (see Appendix C); --- Added anti-man fall device requirements (see Chapter 4); --- Increased square covers and size requirements (see Appendix C); --- Transition joint product map made the corresponding changes (see Appendix B); --- Added another Minggou gutter product map (see Appendix B). This standard reference EN13598.2..2009 "non-pressure buried underground rainwater drainage and drainage of plastic pipe system - PVC (U PVC) Polypropylene (PP) and polyethylene (PE) - Part 2. Specifications for wellbore and manhole wells in traffic areas and manholes ". This standard proposed by the Ministry of Housing and Urban Standard and Design Institute. This standard by the Ministry of Housing and Urban Water Supply and Drainage Standardization Technical Committee building centralized. This standard is drafted by. Jiangsu Hippo Well Co., Ltd. Ministry of Housing and Urban Science and Technology Development Promotion Center, Shanghai Hyundai Architectural Design (Group) Co., Ltd. Technical Center. Participated in the drafting of this standard. Fujian Yatong New Materials Technology Co., Ltd., Chengdu Mei Wo Electrical Technology Co., Ltd., Zhejiang double Central Plastic Valve Co., Ltd., Jiangsu hippo sponge City Engineering Co., Ltd., Fujian Jin Dongcheng Construction Engineering Co., Ltd. Wang Yu Jian Limited company. Drafters of this standard. Zhou Minwei, Gao Lixin, Zhang Miao, Zhou Minhong, Zhou Bai Xing, Liu Mingdong, Wan Shui, Chen Que, Xu Shenguang, Zhang Yingzhong, Ye Houfu. This standard replaces the standards previously issued as follows. --- CJ/T 233-2006. Building drainage plastic inspection wells1 ScopeThis standard specifies the construction area drainage plastic inspection well structure, classification and marking, materials, requirements, test methods, inspection rules, standard Log, packaging, transportation and storage. This standard applies to the construction area (residential area, public building area, factory area, etc.), the bottom depth of the well is not more than 6m, the buried diameter is not more than 800mm drainage plastic inspection wells.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 2828.1 Sampling procedures for sampling - Part 1. Batch-by-lot inspection sampling plan retrieved by acceptance quality limit (AQL) (ISO 2859-1..1999, IDT) GB/T 2918 plastic sample conditioning and testing of the standard environment GB/T 5836.2 building drainage with rigid polyvinyl chloride (PVC-U) fittings GB/T 8801 rigid polyvinyl chloride (PVC-U) pipe fall test methods GB/T 8802 Thermoplastics pipes and fittings - Determination of vicat softening temperature Plastics piping systems - Determination of dimensions of plastic parts Test method for resistance to external shock of thermoplastic pipe GB/T 14152 GB/T 18173.3 Polymer waterproofing materials - Part 3. Water swelling rubber GB/T 18477.3 Buried drainage of rigid polyethylene (PVC-U) structural wall piping system Part 3. Double axial hollow wall pipe GB/T 19472.1 Polyethylene (PE) wall piping systems for underground use - Part 1. Polyethylene double wall corrugated pipe GB/T 19472.2 Polyethylene (PE) wall pipe systems for underground use Part 2. Polyethylene winding wall pipe materials GB/T 20221 buried underground without drainage, drainage with a rigid polyvinyl chloride (PVC-U) pipe GB/T 21873 rubber seal to the drain pipe and sewer pipe interface seal material specifications GB/T 23858-2009 inspection covers CJ/T 212 polymer-based composite hydrating CJ/T 3012 cast iron inspection manhole cover EN1852-1 Buried unpressurized drainage and sewer plastic piping systems - Polypropylene (PP) - Part 1. Specifications for pipes, fittings and systems EN13476-2 Plastic pipe system for drainage and sewerage without pressure underground - PVC-U, PP and PE (PE) - Part 2. Type A, specification for pipe fittings with flat inner and outer surfaces EN13476-3 Plastic pipe system for drainage and sewerage without pressure underground - PVC-U, PP and PE (PE) - Part 3. Type B, specification for pipe fittings with flat inner and profiled outer surfaces EN13598.2-2009 Plastic piping systems for rainwater and sewer water without underpressure - Unplasticized polyvinyl chloride (PVC-U), polypropylene Ethylene (PP) and polyethylene (PE) - Part 2. Specifications for wellbore and manhole wells in traffic areas EN14830-2006 Thermoplastic Inspection Manholes and Manhole Wellheads - Method for Determining the Instability of Buckling Resistance 3 Terms and Definitions, Abbreviations The following terms and definitions, abbreviations apply to this document. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of CJ/T 233-2016_English be delivered?Answer: Upon your order, we will start to translate CJ/T 233-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of CJ/T 233-2016_English with my colleagues?Answer: Yes. The purchased PDF of CJ/T 233-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version CJ/T 233-2016?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version CJ/T 233-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |