Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GBZ41238-2022 English PDF

US$339.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ41238-2022: Energy internet system - Use case
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/Z 41238-2022339 Add to Cart 4 days Energy internet system - Use case Valid

Similar standards

GB/T 44638   GB/T 42322   GB/T 42320   GB/T 41236   

Basic data

Standard ID: GB/Z 41238-2022 (GB/Z41238-2022)
Description (Translated English): Energy internet system - Use case
Sector / Industry: National Standard
Classification of Chinese Standard: F10
Word Count Estimation: 17,143
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GBZ41238-2022: Energy internet system - Use case

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GB /Z 41238-2022 Energy internet system - Use case ICS 29.240.01 CCSF10 National Standardization Guiding Technical Document of the People's Republic of China Energy Internet System Use Cases Published on 2022-03-09 2022-10-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Use Case General Requirements 2 4.1 Overview 2 4.2 Typicality 2 4.3 Generality 2 4.4 Operability 2 5 What the use case describes 3 5.1 Overview 3 5.2 Use Case Name 3 5.3 Application area 3 5.4 Objective 3 5.5 Precondition 3 5.6 Participant 3 5.7 Business Requirements 3 5.8 Use Case Diagram 3 5.9 Energy flow and information flow 3 Version 5.10 Iteration 3 6 Use Case 4 6.1 Overview 4 6.2 Campus Energy Internet Use Case 4 6.3 Micro energy grid use case 5 6.4 Electric vehicle and grid synergy use case 6 6.5 Power Spot Trading Use Case 7 6.6 Operation and Maintenance Service Use Case 9 6.7 Virtual Power Plant Use Case 10 6.8 New energy asset trading use case 11 Reference 13

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed and managed by China Electricity Council. This document is drafted by. State Grid Corporation of China, Tsinghua University, State Grid Shanghai Energy Internet Research Institute Co., Ltd., China Electric Power Research Institute Research Institute Co., Ltd., State Grid Energy Research Institute Co., Ltd., Beijing Sifang Relay Automation Co., Ltd., Jicheng Energy Co., Ltd., State Grid Electronic Commerce Co., Ltd., Tianjin Kaifa Electric Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Shandong Electric Power Company, State Grid Jiangsu Electric Power Co., Ltd. and Beijing Dongtu Technology Co., Ltd. The main drafters of this document. Xin Baoan, Ma Junhua, Liu Haitao, Kang Chongqing, Liu Jinsong, Shan Baoguo, Lu Yiming, Lu Jun, Wang Lei, Yanxing, Lu Guangxian, Cheng Lin, Wang Bo, Wang Dong, Ren Yanming, Yuan Wenguang, Wang Chuanqi, Chen Lei, Wen Yan, Yuan Dong, Xue Baihua. Energy Internet System Use Cases

1 Scope

This document clarifies the basic use cases of the Energy Internet System, specifies the basic principles and representation methods of the use cases, and describes the basic use cases. The physical form and interaction relationship of the use case describe the energy flow, information flow and cash flow of the use case, and give the reference use case diagram. This document applies to the construction and operation of the Energy Internet.

2 Normative references

There are no normative references in this document.

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 energyinternet; EI Taking electric energy as the core, integrating heat, cooling, gas and other energy sources, comprehensively utilizing technologies such as the Internet, and deeply integrating energy systems and information and communication systems It coordinates the production, transmission, distribution, storage, conversion, consumption and transaction of multiple energy sources, and is an open energy system with high efficiency, cleanness, low carbon and safety features. source internet. It is divided into three development stages. domestic interconnection, intracontinental interconnection, and intercontinental interconnection. The regional comprehensive energy supply network formed by the coupling and interconnection of various energy sources, such as cooling, is one of the forms of the energy Internet, and plays the function of "connecting the previous and the next". integrated urban energy supply network. Note 4.The park energy internet (PEI) is a system that includes multiple types of renewable energy, combined cooling, heating and power systems, and electricity/cooling/heating energy storage systems. system, ground source heat pump system, etc. [Source. GB /Z 41237-2022, 3.1.1] 3.2 microenergygrid; MEG One of the forms of the energy Internet is the energy Internet built in a relatively small area with clear boundaries, which can operate independently. Yes, it can also be interconnected. [Source. GB /Z 41237-2022, 3.1.2] 3.3 Electric vehicle and grid synergy The electric vehicle interacts with the power grid in both directions, the grid supplements the electric energy for the electric vehicle, and the electric vehicle acts as an energy storage unit to realize peak shaving and valley filling.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ41238-2022_English be delivered?

Answer: Upon your order, we will start to translate GBZ41238-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ41238-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ41238-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.