Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GBZ35733-2017 English PDF

US$679.00 ยท In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ35733-2017: Guidelines for electromagnetic compatibility requirements of equipment constituting and access to smart grid
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/Z 35733-2017679 Add to Cart 6 days Guidelines for electromagnetic compatibility requirements of equipment constituting and access to smart grid Valid

Similar standards

GB/T 37283   GB/T 37284   GB/T 38336   GB/Z 17624.8   GB/T 18655   

Basic data

Standard ID: GB/Z 35733-2017 (GB/Z35733-2017)
Description (Translated English): Guidelines for electromagnetic compatibility requirements of equipment constituting and access to smart grid
Sector / Industry: National Standard
Classification of Chinese Standard: L06
Classification of International Standard: 33.100
Word Count Estimation: 34,386
Date of Issue: 2017-12-29
Date of Implementation: 2017-07-01
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GBZ35733-2017: Guidelines for electromagnetic compatibility requirements of equipment constituting and access to smart grid


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guidelines for electromagnetic compatibility requirements of equipments constituting and access to smart grid ICS 33.100 L06 National Standardization Guidance Technical Document of the People's Republic of China For the construction and access to smart grid equipment Electromagnetic compatibility requirements Released on.2017-12-29 2017-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and definitions and abbreviations 3 3.1 Terms and Definitions 3 3.2 Abbreviations 5 4 Smart Grid Electromagnetic Environment Overview 5 5 Secondary equipment for power plants and substations 6 5.1 Electromagnetic disturbance requirements 6 5.2 Electromagnetic immunity requirements 6 5.2.1 Overview 6 5.2.2 Immunity Other requirements 11 6 client device 11 6.1 Electromagnetic disturbance requirements 11 6.1.1 Overview 11 6.1.2 Harmonic emissions 11 6.1.3 Voltage fluctuations 11 6.1.4 9kHz~150kHz conducted disturbance 12 6.1.5 Conducted disturbances from 150 kHz to 30 MHz 12 6.1.6 9kHz~30MHz radiation disturbance 13 6.1.7 1GHz~6GHz radiation emission 14 6.2 Electromagnetic immunity requirements 15 6.2.1 Overview 15 6.2.2 15Hz~150kHz low frequency conducted immunity 15 6.2.3 Performance Criteria Supplementary Description 16 7 Test conditions 16 8 Measurement uncertainty 16 9 Test results and test report 16 Appendix A (informative appendix) General requirements for the construction and access of smart grid equipment EMC test 18 Reference 28

Foreword

This guidance technical document was drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document is proposed and managed by the National Radio Interference Standardization Technical Committee (SAC/TC79). This guiding technical document is drafted by. Shanghai Electric Apparatus Research Institute. This guiding technical document was drafted by. China Electric Power Research Institute, Weikai Testing Technology Co., Ltd., China Household Appliance Research Research Institute. The main drafters of this guiding technical document. Chen Wei, Ye Qiongyu, Zhao Mingmin, Zeng Bo, Zhang Yanyan, Zheng Junqi, Zhang Jiangong, Xing Lin. For the construction and access to smart grid equipment Electromagnetic compatibility requirements

1 Scope

This guidance document specifies electromagnetic compatibility (EMC) requirements, test conditions, etc. for the components of the smart grid equipment. For smart grid customer premises equipment and secondary equipment for power plants and substations. This guidance document applies to equipment that forms and accesses the smart grid (see the dotted line box in Figure 1), primarily including smart grid users. End equipment, power plants and substation secondary equipment. Among them, the smart grid user terminal includes but is not limited to. ---The equipment used by the smart grid client; ---Smart grid measurement, protection or control module equipment (such as smart meters or auxiliary equipment installed on the user side); --- Regional power generation or energy storage devices (such as smart grid power conversion devices). Note. This guide focuses on the dotted line in the figure. Figure 1 Conceptual model of the smart grid domain This guidance document does not apply to primary equipment and equipment with rated voltages above 1000V in power plants and substations.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ35733-2017_English be delivered?

Answer: Upon your order, we will start to translate GBZ35733-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ35733-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ35733-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.