Standard ID: GB/Z 29328-2012 (GB/Z29328-2012)
Description (Translated English): Specific configuration of power supply and self-emergency power supply for important power users
Sector / Industry: National Standard
Classification of Chinese Standard: F25
Classification of International Standard: 29.020
Word Count Estimation: 26,260
Quoted Standard: GB 50052
Regulation (derived from): National Standards Bulletin No. 41 of 2012
Issuing agency(ies): Ministry of Health of the People's Republic of China
Summary: This standard specifies the definition of major power users and grading, power supply and emergency power supplied configuration principles and key technical conditions. The technical guidance document applies to major electricity users bring their own po

GBZ29328-2012: Specific configuration of power supply and self-emergency power supply for important power users


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specific configuration of power supply and self-emergency power supply for important power users ICS 29.020 F25 People's Republic of China national standardization of technical guidance documents Important power users and their own power supply emergency power Configure the technical specifications Posted on.2012-12-31 2013-06-01 Implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General 2 5 Definition and classification of important power users 2 5.1 Important Power User Definition 2 5.2 Important power user rating 2 6 power supply configuration of important power users 3 6.1 Important Power User Power Supply Configuration Principles 3 6.2 important power user power supply configuration technical requirements 3 7, the main power user-owned emergency power supply configuration 3 7.1 Own emergency power supply type 3 7.2 self-prepared emergency power supply configuration principle 4 7.3 self-prepared emergency power supply configuration technical requirements 4 7.4 own emergency power supply operation 5 Appendix A (informative) Important power user classification 6 Appendix B (informative) The scope of important power users 7 Appendix C (Informative) Power Supply Configuration Typical Mode 9 Appendix D (informative) self-prepared emergency power supply configuration typical mode 13 References 22

Foreword

This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009. This Guidance Document is proposed by the State Electricity Regulatory Commission. This Guidance Document is governed by the National Electricity Regulatory Standardization Technical Committee (SAC/TC296). The main drafting of this technical guidance document. State Grid Corporation. The guidance of technical documents to participate in the drafting unit.China Electric Power Research Institute, Chongqing Electric Power Company, Beijing Electric Power Company, Henan Electric Power the company. The main drafters of this Guidance Document are Hou Yiming, Li Rui, Wang Zi Long, Fu Zhen Gang, Hu Jun Yi, Li Ligang, Su Jian, Liao Xuezhong, Xu A Yuan, Fang Yao Ming, Wang Peng. Important power users and their own power supply emergency power Configure the technical specifications

1 Scope

This Guidance Document defines the definition and classification of important power users, the principles for the configuration of power supply and self-provided emergency power supply, To technical conditions. This Guidance Document is applicable to the configuration of the power supply of the main electric power users and the own emergency power supply. Other power users and their own power supply emergency power supply configuration can refer to the implementation.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB 50052 for power distribution system design specifications

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Security load protectiveload Electricity load required to protect the safety of people and property in electric places. It is generally believed that one of the following consequences will result from a power failure Security load. a) a direct cause of personal injury; b) Spilling poisonous and harmful substances and causing large-scale pollution of the environment; c) will cause an explosion or fire; d) will cause confusion in a larger social order or have a serious political impact; e) will cause major production equipment damage or cause significant direct economic losses. 3.2 The main power primepowersupply Under normal circumstances, can normally and effectively provide power for all the load power. 3.3 Standby power standbypowersupply According to the user in the safety, business and production of the actual demand for power supply reliability, the main power supply failure or power failure, effective And continuously for all loads or security load power supply. 3.4 Self-emergency power supply self-emergencypowersupply Provided by the user, in the case of normal power supply all interrupt occurs, for the user security load reliable power supply independence power supply. 3.5 Double circuit doublecircuit For the same user load two power supply lines.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ29328-2012_English be delivered?

Answer: Upon your order, we will start to translate GBZ29328-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ29328-2012_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ29328-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.