GB/T 9364.11-2016 English PDFUS$139.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 9364.11-2016: Miniature fuses -- Part 11: Fuse-links for LED lamps Status: Valid
Basic dataStandard ID: GB/T 9364.11-2016 (GB/T9364.11-2016)Description (Translated English): Miniature fuses -- Part 11: Fuse-links for LED lamps Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K31 Classification of International Standard: 29.120.50 Word Count Estimation: 7,747 Date of Issue: 2016-08-29 Date of Implementation: 2017-03-01 Regulation (derived from): National Standard Notice No. 14 of 2016 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 9364.11-2016: Miniature fuses -- Part 11: Fuse-links for LED lamps---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Miniature fuses - Part 11. Fuse-links for LED lamps ICS 29.120.50 K31 National Standards of People's Republic of China Small fuses Part 11. fuse for LED lights 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released ForewordGB/T 9364 "Small Fuse" is divided into the following parts. Part 1. Definition of small fuses and general requirements for small fuse - links; - Part 2. Tubular fuse links; - Part 3. Subminiature fuse links; - Part 4. Universal module fuse - links (UMF) perforated and surface mount type; - Part 5. Guidelines for the quality assessment of small fuse - links; - Part 6. Fuse support for small tubular fuse links; - Part 7. Miniature fuse links for special applications; - Part 10. User Guide; Part 11. fuse for LED lights. This part is part 11 of GB/T 9364. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part is made by China Electrical Equipment Industry Association. This part is headed by the National Standardization Technical Committee for Fuses (SAC/TC340). This part of the drafting unit. China Electrical Appliances Research Institute Co., Ltd., Nanjing Sutter Technology Development Co., Ltd., Xiamen Yabao Electronics limited Company, Dongguan Huade Electric Co., Ltd., Hailei (China) Electronic Technology Co., Ltd., Shanghai Songshan Electronics Co., Ltd., Wei Kai test Technology Co., Ltd., force special Fuse Co., Ltd., Dongguan City Bate Electronic Technology Co., Ltd., AEM Technology (Suzhou) Co., Ltd. (Shenzhen) Co., Ltd., Shenzhen Liangsheng Electronics Co., Ltd., Shenzhen Del Electronics Co., Ltd., Dongguan City, Jinhua Electronics Co., Ltd., Cooper Electronic Technology (Shanghai) Co., Ltd. This part of the main drafters. Cai Jun, South West Wing, Zhang Zhixing, Shi Mingmu, Yan Qiongzhang, Lin Wenyuan, Chen Mingqin, Zou Jianjiang, Zhang Junyan, Yan Wenhua, Zheng Xuping, Huang Qibo, Luo Xinxu, Yang Guang, Zheng Jiangbiao, Zhao Junxia, Lai Wenhui, Li Fenqin. Small fuses Part 11. fuse for LED lights1 ScopeThis part of GB/T 9364 specifies the terminology and definition of small fuse links for LED lamps, general requirements, standard ratings, marking, test Inspection, size and structure, electrical performance and other technical requirements. This part applies to the protection of small use of LED lights fuse. Note. action over voltage, withstand surge protection of two electrical performance requirements are still being considered.2 normative reference documentsThe following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. GB/T 9364.1-2015 Miniature fuses - Part 1. Definition of small fuses and general requirements for small fuse links (IEC 60127-1..2006, MOD) GB/T 9364.4-2016 Miniature fuses - Part 4. Universal module fuses (UMF) perforated and surface mount (IEC 60127-4..2012, MOD)3 terms and definitionsThe following definitions and definitions as defined in GB/T 9364.1-2015 apply to this document. 3.1 LED lights with fuse fuse-linksforLEDlamps Used to protect the small fuse used in LED lamps.4 General requirementsThe general requirements of the fuse for LED lamps shall meet the requirements of Chapter 4 of GB/T 9364.1-2015.5 standard ratingRated voltage, rated current, rated breaking capacity by the manufacturer.6 logo6.1 The marking of the fuse for LED lights shall meet the requirements of Chapter 6 of GB/T 9364.4-2016. 6.2 LED lights with the fuse on the body or the smallest package should be with the application of LED lights symbol. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 9364.11-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 9364.11-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 9364.11-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 9364.11-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |