GB/T 9151-2023 English PDFGB/T 9151: Historical versions
Basic dataStandard ID: GB/T 9151-2023 (GB/T9151-2023)Description (Translated English): Terms of drilling engineering Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: D10 Classification of International Standard: 01.040.73 Word Count Estimation: 114,166 Date of Issue: 2023-09-07 Date of Implementation: 2024-01-01 Older Standard (superseded by this standard): GB/T 9151-1988 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 9151-2023: Terms of drilling engineering---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.ICS 01.040.73 CCSD10 National Standards of People's Republic of China Replace GB/T 9151-1988 Drilling Engineering Terminology Published on 2023-09-07 2024-01-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee Table of contentsPrefaceⅠ 1 Scope 1 2 Normative reference documents 1 3 Basic terminology 1 4 Rock Drilling Characteristics 4 5 Drilling methods 7 6 drill bit 11 7 drilling tools 18 8 Drilling equipment25 9 Drilling technology 30 10 Directional drilling 35 11 Bore hole flushing 42 12 Wall protection and leak plugging 50 13 Accidents in the hole 55 14 Hydraulic ring geological drilling 57 15 Drilling Project Management 65 16 Ancient Chinese Drilling 69 Reference 73 Index 74ForewordThis document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. This document replaces GB/T 9151-1988 "Drilling Engineering Terminology". Compared with GB/T 9151-1988, except for structural adjustment and compilation In addition to editorial changes, the main technical changes are as follows. a) "Basic terminology" (see Chapter 3, Chapter 2 of the 1988 edition) has been changed, and "Drilling Methods" (see Chapter 3 of the 1988 edition), Incorporation of relevant terms for “drilling and drilling” (see Chapter 5 of the 1988 edition); b) Changed the terms related to "rock drilling characteristics" (see Chapter 4, Chapter 4 of the 1988 edition); c) The terms related to drilling technology and drilling parameters have been changed (see Chapter 10 of the 1988 edition), and the terms related to drilling technology have been included in the "drilling technology" "Drilling Method" (see Chapter 5), and incorporate terms related to drilling parameters into "Drilling Technology" (see Chapter 9); d) Changed the terminology related to "drill bit" (see Chapter 6, Chapter 8 of the 1988 edition); e) Changes in terms related to "drilling equipment" (see Chapter 8, Chapter 6 of the 1988 edition); f) "Sampling methods and tools" (see Chapter 13 of the 1988 edition) were changed, and terms related to sampling methods were included in "drilling technology" (see Chapter 13 of the 1988 edition) Chapter 9), incorporating terms related to sampling tools into “drilling tools” (see Chapter 7); g) "Borehole deflection and measurement" (see Chapter 14 of the 1988 edition) and "Directional Drilling" (see Chapter 10 of the 1988 edition) have been changed. Chapter 15) related terms; h) Changed the relevant terminology of "borehole flushing" (see Chapter 11, Chapter 11 of the 1988 edition); i) Combine "well formation technology" (see Chapter 17 of the 1988 edition), "engineering geological drilling" (see Chapter 18 of the 1988 edition) and "engineering construction". "Hydraulic drilling" (see Chapter 19 of the 1988 edition) was changed to "Hydraulic ring geological drilling" (see Chapter 14); j) Replace "management" (see Chapter 21 of the 1988 edition), "technical and economic indicators" (see Chapter 22 of the 1988 edition), "operational technology" (See Chapter 23 of the 1988 edition) changed to "Drilling Engineering Management" (see Chapter 15); k) Added terms related to "ancient Chinese drilling" (see Chapter 16). Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents. This document is proposed by the Ministry of Natural Resources of the People's Republic of China. This document is under the jurisdiction of the National Natural Resources and Land Spatial Planning Standardization Technical Committee (SAC/TC93). This document was drafted by. Institute of Exploration Technology, Chinese Academy of Geological Sciences, China University of Geosciences (Wuhan), China University of Geosciences (Beijing), Beijing Institute of Exploration Engineering, China Geological Survey Hydrogeological and Environmental Geological Survey Center, China Geological Equipment Group Co., Ltd. The main drafters of this document. Liu Xiumei, Jiang Guosheng, Liu Baolin, Li Yi, Tao Shixian, Zheng Jitian, Jia Jun, Wu Xiang, Zhu Jianglong, Zhang Wei, Zhang Yongqin, Wang Yu, Gao Fuli, Li Guomin, Sun Jianhua. The previous versions of this document and the documents it replaces are as follows. ---First published as GB/T 9151-1988 in 1988; ---This is the first revision. Drilling Engineering Terminology1 ScopeThis document defines terms commonly used in drilling engineering. This document is applicable to other areas of geological drilling engineering and natural resource exploration.2 Normative reference documentsThis document has no normative references.3 Basic terminology3.1 borehole;drilhole;hole A cylindrical hole drilled in the formation to explore underground resources and geological conditions or to meet other engineering needs. 3.1.1 elementsofborehole Factors characterizing borehole structure, size and morphology. 3.1.1.1 boreholeaxis boreholeaxis The centerline of the drilled hole. 3.1.1.2 boreholetrajectory The path the drill hole extends. 3.1.1.3 orifice boreholehead The open end of the drilled hole. 3.1.1.4 boreholebottom Drill the end of the hole. 3.1.1.5 boreholediameter The diameter of the borehole cross-section. 3.1.1.6 hole depth boreholelength The length of the drilling axis. 3.1.1.7 hole wall boreholewal The side surface of the drilled hole. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 9151-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 9151-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 9151-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 9151-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 9151-2023?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 9151-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |