GB/T 753-2012 English PDFUS$259.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 753-2012: Steam condition series for utility boilers Status: Valid GB/T 753: Historical versions
Basic dataStandard ID: GB/T 753-2012 (GB/T753-2012)Description (Translated English): Steam condition series for utility boilers Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: J98 Classification of International Standard: 27.060 Word Count Estimation: 11,161 Quoted Standard: GB/T 321; GB/T 754; GB/T 2900.48; GB/T 5578; GB 50660; DL/T 5054; DL/T 5072 Regulation (derived from): National Standards Bulletin 2012 No. 42 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the boiler steam parameters serialization requirements. This standard applies to burning fossil fuels, biomass boilers and waste incineration as well as direct-fired boiler waste heat protection, non- direct-fired heat recovery boi GB/T 753-2012: Steam condition series for utility boilers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Steam condition series for utility boilers ICS 27.060 J98 National Standards of People's Republic of China Power plant boiler steam parameters series Issued on. 2012-12-31 2013-07-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordThis standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard by the National Standardization Technical Committee of the boiler pressure vessel (SAC/TC262) and focal points. This standard by the Shanghai Power Equipment Research Institute is responsible for drafting, Shanghai Boiler Works, Ltd., Dongfang Boiler Co., Harbin Boiler Factory Co., Ltd., Beijing Babcock & Wilcox Co., Nantong Wanda Boiler Co., Ltd. and other units Involved in the drafting. The main drafters of this standard. Lu Xiang, Chen Xiubin, Chen Yongqi, PF Yiu Rong, Xu Yujun, Luo sound, Di Xu Ping, Xie Xianhua, Jiang Xiuhua.IntroductionWhen GB/T 753-1965 release parameters of steam boiler by the state regulations. Since the 1980s, China's electricity With only boiler station on the parameter and large capacity development, the manufacturer also added steam parameters can be modified to meet the needs of different users need. Follow the revision of this standard when the following three principles. --- Adapt to specific requirements of power plant boiler, steam turbine and supporting capacity and parameters to match; --- To meet the needs of the market transition period of development, users and manufacturers have more choice; --- Implementation of national energy conservation policies. Power plant boiler steam parameters series1 ScopeThis standard specifies the requirements for serialization boiler steam parameters. This standard applies to the burning of fossil fuels, waste incineration boilers and boiler fuels and biomass direct-fired heat recovery boilers, non-direct fired Waste heat boiler, when required, the steam parameters can refer to this standard. NOTE. The standard refers to the boiler and condensing steam turbine for power generation or cogeneration steam turbine power station boilers.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 321 priority number and priority number system GB/T 754 steam turbine for power generation parameters series GB/T 2900.48 Electrotechnical terminology boiler GB/T 5578 stationary power generation steam turbine specification GB 50660 and medium-sized thermal power plant design procedures DL/T 5054 thermal power plant steam piping design technical regulations DL/T 5072 thermal power plant paint design requirements3 Terms and DefinitionsGB/T 2900.48 and GB/T 5578 defining the terms and definitions (see Appendix A) and the following terms and definitions apply to this document. 3.1 Unit rated power ratedpoweroftheunit Steam turbine rated power as a unit rated power. 3.2 Units steam parameters steamconditionsoftheunit The new steam turbine with a rated pressure and temperature rating as a unit steam parameters. Reheat steam parameters unit also includes re-rated Hot temperature. Note. The new steam known as the main steam, the main steam valve steam inlet, see GB/T 5578. 3.3 Basic series basicseries Precedence series. 3.4 Supplement Series complementaryseries The basic series of complementary parts.4 unit rated power seriesUnit rated power is the main basis for determining the capacity of the boiler and steam parameters. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 753-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 753-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 753-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 753-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 753-2012?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 753-2012 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |