GB/T 7251.4-2017 English PDFUS$519.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 7251.4-2017: Low-voltage switchgear and controlgear assemblies -- Part 4: Particular requirements for assemblies for construction sites (ACS) Status: Valid GB/T 7251.4: Historical versions
Basic dataStandard ID: GB/T 7251.4-2017 (GB/T7251.4-2017)Description (Translated English): Low-voltage switchgear and controlgear assemblies -- Part 4: Particular requirements for assemblies for construction sites (ACS) Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K31 Classification of International Standard: 29.130.20 Word Count Estimation: 26,251 Date of Issue: 2017-11-01 Date of Implementation: 2018-05-01 Older Standard (superseded by this standard): GB/T 7251.4-2006 Regulation (derived from): National Standard Announcement 2017 No. 29 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 7251.4-2017: Low-voltage switchgear and controlgear assemblies -- Part 4: Particular requirements for assemblies for construction sites (ACS)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Low-voltage switchgear and controlgear assemblies-Part 4. Particular requirements for assemblies for construction sites (ACS) ICS 29.130.20 K31 National Standards of People's Republic of China Replace GB/T 7251.4-2006 Low-voltage switchgear and control equipment Part 4. Complete sets of equipment for construction sites Special requirements of (ACS) Part 4. Particularrequirementsforassembliesforconstructionsites(ACS) (IEC 61439-4.2012, IDT) Released.2017-11-01 2018-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration issued ContentForeword I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 symbols and abbreviations 3 5 interface characteristics 4 6 information 4 7 Conditions of use 5 8 Structural requirements 6 9 Performance requirements 8 10 Design Verification 8 11 routine inspection 11 101 ACS Features 11 Appendix 13 Appendix C (informative) User Information Template 14 Appendix D (informative) Design Verification 15 Appendix O (informative) Temperature-up verification guide 16 Appendix P (Normative) Verification of the short-circuit withstand strength of the busbar structure by comparison with the tested baseline design 17 Appendix AA (informative) Notes relating to some countries18 Appendix BB (vacancy) 19 Appendix CC (informative) Agreement between manufacturer and user of complete equipment 20 Reference 23 Figure 101 Crash test 10 using impact elements Table 101 Calculated load value 12 Table D.1 Design verification list to be completed 15 Table AA.1 Notes relating to some countries 18 Table CC.1 Agreement between manufacturer and user of the complete set of equipment 20ForewordGB/T 7251 "Low-voltage switchgear and control equipment" is planned to release the following parts. --- Part 1. General; --- Part 3. Switchboards (DBO) operated by general personnel; --- Part 4. Special requirements for complete sets of equipment for construction sites (ACS); --- Part 5. Electrical power distribution equipment for public utilities; --- Part 6. Busbar trunking system (busbar trunking); --- Part 7. Complete sets of equipment for specific applications---such as docks, campsites, market squares, electric vehicle charging stations; --- Part 8. General technical requirements for intelligent complete sets of equipment; --- Part 10. Guidelines for specifying complete sets of equipment; --- Part 12. Complete sets of power switches and control equipment. This part is the fourth part of GB/T 7251. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part replaces GB/T 7251.4-2006 "Low-voltage switchgear and control equipment - Part 4. Complete sets for construction sites The special requirements of the preparation (ACS), compared with GB/T 7251.4-2006, the main technical changes are as follows. --- The contents of the structure and technology are adjusted according to GB/T 7251.1-2013; --- Allow comparison with ACS that has been tested. This section is used in conjunction with GB/T 7251.1-2013. The general provisions of GB/T 7251.1-2013 are only applicable to this section. The scope of the reference. If chapters and bars, tables, figures and appendices of the application are applied, they are indicated by reference to GB/T 7251.1-2013, for example, 1.2.3 of GB/T 7251.1-2013, Table 4 of GB/T 7251.1-2013, or Appendix A of GB/T 7251.1-2013. Articles with numbers 101, 102, 103, etc. are additional terms of the same clause in GB/T 7251.1-2013. The new tables and diagrams in this section are counted starting from 101. The new appendices in this section are named after the letters AA, BB, etc. This part uses the translation method equivalent to IEC 61439-4.2012 "Low-voltage switchgear and control equipment Part 4. For construction Special Requirements for Site Equipment (ACS). The documents of our country that have a consistent correspondence with the international documents referenced in this part are as follows. --- GB/T 19212.24-2005 Safety of power transformers, power supply units and similar products - Part 24. Construction site Special requirements for transformers (IEC 61558-2-23.2000, MOD) This part was proposed by China Electrical Equipment Industry Association. This part is under the jurisdiction of the National Low Voltage Switchgear and Control Equipment Standardization Technical Committee (SAC/TC266). This section drafted by. Tianjin Electric Science Research Institute Co., Ltd., National Electric Control and Distribution Equipment Quality Supervision and Inspection Center (Tianjin Tianchuan Electronic Control Equipment Testing Co., Ltd.), Chengdu Product Quality Supervision and Inspection Institute, Tianjin Tianchuan Electric Control Distribution Co., Ltd., Hangzhou Jiuchuan Electric Co., Ltd. Company, Tianjin Jiu'an Group Co., Ltd., Hunan Electric Apparatus Research Institute, Borui Electric Co., Ltd., Cixi Qiguo Electric Co., Ltd., Ningxia Licheng Electric Group Co., Ltd. The main drafters of this section. Zhang Lei, Li Jingze, Cao Dongming, Wang Sha, Liu Xiaolin, Shan Fuhe, Li Bin, Zhu Wentang, Jiang Guoqing, Niu Guangjun. The previous versions of the standards replaced by this section are. ---GB 7251.4-1998, GB/T 7251.4-2006. Low-voltage switchgear and control equipment Part 4. Complete sets of equipment for construction sites Special requirements of (ACS)1 ScopeNote. In this section, the acronym ACS (Complete Equipment for Construction Sites, see 3.1.101) refers to the low voltage switch intended for use on buildings and similar sites. Equipment and control equipment. This part of GB/T 7251 defines the special requirements of ACS. --- Complete set of equipment with rated voltage AC not exceeding 1000V or DC not exceeding 1500V; --- The nominal primary voltage and nominal secondary voltage of the transformer in the ACS are within the limits specified above; --- Planned for construction sites, indoors and outdoors, such as temporary workplaces and construction, installation, repairs that the public generally does not enter Demolition or alteration of property, property (buildings), civil engineering (public buildings), excavation or any similar workplace; --- Transportable (semi-fixed) or mobile enclosures. Manufacturing and/or assembly may be performed by manufacturers other than the original manufacturer. This section does not apply to individual devices and self-contained components that conform to their respective product standards, such as motor starters, fuse switches, electronic components. Prepare. This section does not apply to administrative centers (offices, changing rooms, complete equipment rooms, canteens, restaurants, dormitories, toilets, etc.) on construction sites. Complete equipment used. The electrical protection requirements provided by the equipment manufactured in accordance with this section are given in GB/T 16895.7.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. Chapter 2 of GB/T 7251.1-2013 is applicable except as follows. increase. GB/T 2423.19-2013 Environmental testing - Part 2. Test methods Tests Kc. sulphur dioxide test for contact points and joints Inspection (IEC 60068-2-42.2003, IDT) GB/T 7251.1-2013 Low-voltage switchgear and control equipment - Part 1. General (IEC 61439-1.2011, IDT) GB/T 16895.7-2009 Low-voltage electrical installations - Part 7-704. Requirements for special installations or locations Electrical installation (IEC 60364-7-704.2005, IDT) GB/T 17045-2008 General part of electric shock protection devices and equipment (IEC 61140.2001, IDT) IEC 60068-2-27.2008 Environmental testing - Part 2-27. Test test Ea and guide. Impact (Environmentaltes- ting-Part 2-27. Test-TestEaandguidance. Shock) IEC 61558-2-23 Safety of power transformers, power supply units and similar products - Part 2-23 Special requirements (Safetyoftransformers, reactors, powersupplyunitsandcombinationsthereof-Part 2-23. Particularrequirementsandtestsfortransformersandpowersupplyunitsforconstructionsites)3 Terms and definitionsChapter 3 of GB/T 7251.1-2013 is applicable except as follows. Increase the terminology. 3.1 General terms 3.1.101 Low-voltage switchgear and control equipment (ACS) for construction sites low-voltageswitchgearandcontrolgearassembly Forconstructionsites(ACS) A combination of devices designed and built for use in all construction sites indoors and outdoors. The device consists of one or several transformers or switches The components are combined with control, measurement, signal, protection and regulation and all electrical, mechanical connections and structural parts inside. 3.2 Structural unit of the complete set of equipment 3.2.101 Metering unit A functional unit equipped with a power measuring device. 3.2.102 Transformer unit transformerunit A functional unit consisting mainly of one or several transformers. modify. 3.3 External design of the complete set of equipment 3.3.1 Open type equipment open-typeASSEMBLY The terminology of GB/T 7251.1-2013 does not apply. 3.3.2 Fixed panel type equipment dead-frontASSEMBLY The terminology of GB/T 7251.1-2013 does not apply. instead. 3.3.3 Closed ACS enclosedACS In addition to the mounting surface that provides a specific level of protection, the ACS is closed on all sides. 3.3.7 Box ACS box-typeACS The closed ACS is used to. ---Installed on a vertical surface; ---either supported by a tripod or bracket (hinge or non-hinge) or by means of a fixture that is not an integral part of the ACS Placed on a horizontal plane (see 3.4.2 of GB/T 7251.1-2013). modify. 3.5 Installation conditions of complete sets of equipment 3.5.1 ASSEMBLYforindoorinstalation The terminology of this clause of GB/T 7251.1-2013 does not apply (see 3.1.101). 3.5.2 Outdoor installation equipment ASSEMBLYforoutdoorinstalation The terminology of this clause of GB/T 7251.1-2013 does not apply (see 3.1.101). 3.5.3 Stationary equipment stationaryASSEMBLY The terminology of GB/T 7251.1-2013 does not apply. 3.5.4 Mobile equipment movableASSEMBLY The terminology of GB/T 7251.1-2013 does not apply. Increase the terminology. 3.5.101 Transportable ACS transportableACS Semi-fixed ACS semi-fixedACS For non-permanently fixed locations, ACS whose location may change during work in the same site. When you want to move the device to another When you are in a position, first disconnect the power. 3.5.102 Mobile ACS movableACS The ACS that moves on the job site as the work advances without disconnecting the power supply. Increase the terminology. 3.101 ACS features 3.101.1 Incoming power supply function incomingsupplyfunction Suitable for connection of ACS to power supply networks or substations or site generators. 3.101.2 Metering function meteringfunction Suitable for measurement of electrical energy consumption on the construction site. 3.101.3 Distribution function distributionfunction It is suitable for providing power distribution and power protection for construction sites through terminal connections or sockets. 3.101.4 Transformer function transformerer function It is suitable for providing a method of changing the voltage or providing electrical protection measures. Note. Detailed requirements are given in 101.1.4 symbols and abbreviationsChapter 4 of GB/T 7251.1-2013 is applicable.5 interface characteristicsChapter 5 of GB/T 7251.1-2013 is applicable except as follows. 5.3.1 Rated current of the complete set of equipment (InA) Instead of the title and content. 5.3.1 ACS rated current (InA) The rated current of the ACS is the rated current of its incoming circuit. The temperature rise of each part of the ACS when carrying this current shall not exceed the limit specified in 9.2 of GB/T 7251.1-2013. 5.4 Rated dispersion coefficient (RDF) increase. The calculated load or outgoing circuit group of the ACS outgoing circuit shall be declared by the complete equipment manufacturer or the value in Table 101. basis. The values in Table 101 apply when the manufacturer does not declare any RDF. 5.6 Other features instead. The following characteristics should be declared. a) the function specified by the manufacturer (see 3.101); b) shape design (see 3.3); c) mobility (see 3.5.101 and 3.5.102); d) degree of protection (see 8.2); e) installation methods, such as fixed or movable parts (see 8.5.1 and 8.5.2); f) protection against electric shock (see 8.4); g) corrosion protection (see 10.2.2.101); h) special conditions of use, if applicable (see 7.2); i) Electromagnetic compatibility (EMC) rating (see Appendix J of GB/T 7251.1-2013).6 informationChapter 6 of GB/T 7251.1-2013 is applicable except as follows. 6.1 Complete equipment designation identification Instead of the title and content. 6.1 ACS Designated Logo The complete equipment manufacturer shall provide one or several nameplates for each ACS. The nameplate shall be durable and its position shall be installed and cast in the ACS. A place that is easy to see when running. According to the test of 10.2.7 and by visual inspection. The ACS should provide the following information on the nameplate. a) the manufacturer's name or trademark (see 3.10.2); b) the model number or marking number, or any other marking, from which the relevant information can be obtained from the manufacturer of the equipment; c) the manner in which the date of manufacture is identified; d) GB/T 7251.4; e) current type (and frequency in the case of AC); f) rated voltage (Un) (ACS) (see 5.2.1); g) rated current of the ACS (InA) (see 5.3.1); h) degree of protection (see 8.2); i) Quality, if more than 30kg. If the manufacturer's name or trademark is easily identifiable on the ACS, it does not need to be given on the nameplate. 6.2.1 Complete equipment related information Instead of the title and content. 6.2.1 ACS related information The following additional information, if applicable, should be provided with the ACS documentation in the kit manufacturer's technical documentation. a) rated operating voltage (Ue) (of a circuit) (see 5.2.2); b) rated impulse withstand voltage (Uimp) (see 5.2.4); c) rated insulation voltage (Ui) (see 5.2.3); d) rated current (Inc) of each circuit (see 5.3.2); e) rated peak withstand current (Ipk) (see 5.3.4); f) rated short-time withstand current (Icw) and duration (see 5.3.4); g) rated short-circuit current (Icc) (see 5.3.5); h) rated frequency (fn) (see 5.5); i) rated dispersion factor (RDF) (see 5.4); j) function (see 3.101); k) all necessary information relating to other classifications and characteristics of the declaration (see 5.6); l) short-circuit withstand strength and characteristics of short-circuit protection appliances (see 9.3.2); m) Dimensions (including protruding parts such as handles, covers, doors). 6.2.2 Instructions for handling, installation, operation and maintenance increase. The ACS manufacturer shall specify in its technical documentation other types of equipment supplied with the ACS, which may be It is connected. This information should indicate whether compatibility is based on the type of system ground used and/or based on electrical protection coordination in a complete installation. Need. In order to maintain the coordination of protective measures and protective equipment in a complete installation, the manufacturer shall assemble the appropriate documentation.7 Conditions of useChapter 7 of GB/T 7251.1-2013 is applicable except as follows. modify. 7.1.1 Ambient air temperature 7.1.1 of GB/T 7251.1-2013 does not apply. Instead of the title and content. 7.1.1 Ambient air temperature for ACS installation The ambient air temperature does not exceed 40 ° C and its average temperature of 24 h does not exceed 35 ° C. The lower limit of the ambient air temperature is -25 °C. 7.1.2 Humidity conditions 7.1.2 of GB/T 7251.1-2013 does not apply. Instead of the title and content. 7.1.2 Humidity conditions for ACS installation At a maximum temperature of 25 ° C, the relative humidity is as short as 100%. 7.1.3 Pollution level Instead of the last paragraph. Only pollution level 3 and pollution level 4 apply. If the enclosure has a degree of protection of at least IP5X and care is taken to avoid condensation, the microenvironment can be reduced to pollution level 2. 7.2 Special conditions of use Add the following new column items. m) Heavy pollution of the environment.8 structural requirementsExcept for the following, Chapter 8 of GB/T 7251.1-2013 is applicable. 8.1.1 General increase. Suppose they are tolerant of the conditions of use of Chapter 7 and the requirements of 8.1.6 and 8.1.2, except for the exceptions mentioned in 8.101, all equipment It should be placed in an enclosure that is equipped with a removable panel, cover or door for connection or maintenance needs. 8.1.2 Corrosion protection instead. Taking into account normal use conditions (see 7.1) and/or special conditions of use (see 7.2), corrosion protection of exposed surfaces should be through the use of suitable materials Material or ensured by a protective layer. The test of this requirement is carried out in accordance with the test of 10.2.2. 8.1.4 UV radiation resistance instead. For exterior parts made of outer casing and insulating material, UV radiation resistance shall be verified in accordance with 10.2.4. This is not required for external components (such as sockets, switch handles, buttons, etc.) made of insulating materials for other IEC standards. test. 8.1.5 Mechanical strength increase. The structure of the ACS should be able to withstand the mechanical vibration of a half sine wave with an acceleration of 500 m/s2 and a duration of 11 ms (with normal The equipment for long-distance transportation on the road or railway is quite). Verification according to the test of 10.2.6. 8.1.6 Lifting device instead. The lifting ring and/or handle (or any other equivalent system) shall be provided by the ACS and secured to the outer casing or support frame. Verification according to the test of 10.2.5. 8.2.1 Protection against mechanical collisions Increase the paragraph. The ACS should also withstand a 6 Joule energy collision generated by collisions between the construction machinery handling equipment on the site (see IEC 60068-2-27. 2008). See 10.2.6 for protection against mechanical impact. 8.2.2 Prevent access to live parts and the entry of external solids and water instead. The degree of protection provided by the ACS to prevent access to live parts and the entry of foreign solids and water is specified in the IP code table in GB/T 4208. Show and verify according to 10.3. The ACS should have a degree of protection of at least IP44, all doors closed, and all removable panels and covers are fixed. Ventilation and drain holes should not reduce this level of protection. Assuming that the door can be closed under all conditions of use, the degree of protection of the working face inside the door should not be lower than ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 7251.4-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 7251.4-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 7251.4-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 7251.4-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 7251.4-2017?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 7251.4-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |