Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 50387-2017 English PDF

US$1319.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 50387-2017: Code for engineering installation acceptance of metallurgical machinery hydromatic, lubricating and pneumatic system equipment
Status: Valid

GB/T 50387: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 50387-20171319 Add to Cart 8 days Code for engineering installation acceptance of metallurgical machinery hydromatic, lubricating and pneumatic system equipment Valid
GB 50387-200685 Add to Cart Auto, < 3 mins Code for installation acceptance of metal mechanical hydromatic, lubricating and air-driven system equipment Obsolete

Similar standards

GB/T 50377   GB 50278   GB 50386   GB 50390   

Basic data

Standard ID: GB/T 50387-2017 (GB/T50387-2017)
Description (Translated English): Code for engineering installation acceptance of metallurgical machinery hydromatic, lubricating and pneumatic system equipment
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: P93
Word Count Estimation: 66,622
Date of Issue: 2017-08-31
Date of Implementation: 2018-05-01
Older Standard (superseded by this standard): GB 50387-2006
Regulation (derived from): The Ministry of Housing and Urban-Rural Development Announcement No.1664 of 2017
Issuing agency(ies): Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

GB 50387-2006: Code for installation acceptance of metal mechanical hydromatic, lubricating and air-driven system equipment


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GB UDC NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA P GB 50387-2006 Code for installation acceptance of metal mechanical hydromatic, lubricating and air-driven system equipment Issued on: SEPTEMBER 6, 2006 Implemented on: APRIL 1, 2007 Issued by. Ministry of Construction of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China. National Standard of the People's Republic of China Code for installation acceptance of metal mechanical hydromatic, lubricating and air-driven system equipment Main drafting organization. China Metallurgical Construction Association Approval organization. The Ministry of Construction of the People's Republic of China Implementation Date. April 1, 2007 China Planning Press 2007 Beijing

Foreword

According to the relevant requirements of Document JIANBIAO [2005] No.124 issued by the Ministry of Construction - “Notice on Printing and Distributing ‘the Development and Revision Plan (the second batch) of National Engineering Construction Standards and Codes in 2005’”, this code was formulated, in combination with the characteristics of metallurgical construction, by China First Metallurgical Construction Co., Ltd. jointly with the organizations concerned, under the organization of China Metallurgical Construction Association. In the process of formulating this code, the code drafting group learnt the relevant current national laws, regulations and standards, conducted investigations and studies, summarized the experience in the construction quality acceptance of hydromatic, lubricating and air-driven system equipment in metal mechanical equipment installation engineering over the years, discussed and revised the provisions in the code repeatedly, solicited the opinions from related organizations and experts, and finalized this code through review. This code consists of eight chapters, covering General Provisions; Basic Requirements; Equipment Foundation, Anchor Bolt and Bearing Plate; Equipment and Materials in Site; Equipment Installation; Fabrication and Installation of Pipeline; Pipeline Flushing, Purging and Pressure Test; and Commissioning and Test-run, as well as six appendixes. The unit project in installation of hydromatic, lubricating and air-driven system equipment totally comprises seven sub-section projects and corresponding sub-item projects. The provisions printed in bold type in this code are mandatory ones and must be implemented strictly. This code is under the jurisdiction of, and its mandatory provisions are interpreted by the Ministry of Construction. China First Metallurgical Construction Co., Ltd. is in charge of the explanation of specific technical specifications In order to improve the quality of this code, all relevant organizations are kindly invited to summarize and accumulate actual experiences when implementing this code. Relevant comments and recommendations, whenever necessary, should be fed back to China First Metallurgical Construction Co., Ltd. (Address. No.3, Gongye Avenue, Qingshan District, Wuhan City, 430081, China; E-mail. jisc@cfmcc.com or xiaolw@cfmcc.com) for amendment in future revision. The chief drafting organization, co-drafting organization and chief drafters of this code are. Chief Formulation Organization. China First Metallurgical Construction Co., Ltd. Co-formulation Organization. Shanghai Baoye Group Construction Co., Ltd. Chief Drafters. Zhuo Guangyu, Xu Zuwen, Li Mingzhu, Wang Shiqing, Wu Gangping, Liu Shiyin, Song Zhanjiang, Liu Zhiyuan, Liu Guangqiu, Luo Jin and Zou Yichang.

Table of Contents

1 General Provisions ... 7  2 Basic Requirements ... 8  3 Equipment Foundation, Anchor Bolt and Bearing Plate ... 12  3.1 General Requirements ... 12  3.2 Equipment Foundation ... 12  3.3 Anchor Bolt ... 12  3.4 Bearing Plate... 13  4 Equipment and Materials in Site ... 14  4.1 General Requirements ... 14  4.2 Equipment ... 14  4.3 Raw Materials ... 14  5 Installation of Equipment ... 15  5.1 General Requirements ... 15  5.2 Installation of Oil Tank ... 15  5.3 Installation of Cooler and Steam Heater ... 15  5.4 Installation of Filter ... 16  5.5 Installation of Energy Accumulator ... 16  5.6 Installation of Pump ... 16  5.7 Installation of Complete Set of Hydraulic (Lubrication) Station ... 17  5.8 Installation of Brackets for Hydraulic (Air) Valve and Control Valve ... 17  5.9 Installation of Oil Purifier ... 18  5.10 Installation of Oil Feeder and Distributor ... 18  5.11 Installation of Water-separating Gas Filter, Atomized (Oil Gas) Lubricator and Control Valve ... 18  6 Fabrication and Installation of Pipeline ... 19  6.1 General Requirements ... 19  6.2 Pipeline Welding ... 19  6.3 Pipeline Pickling ... 20  6.4 Pipeline Fabrication ... 20  6.5 Pipeline Installation ... 21  7 Pipeline Flushing, Purging and Pressure Test ... 24  7.1 General Requirements ... 24  7.2 Pipeline Flushing ... 24  7.3 Pipeline Purging ... 25  7.4 Pressure Test for Hydromatic and Lubricant Pipeline Systems ... 25  7.5 Pressure Test for Grease Pipeline System ... 25  7.6 Pressure Test for Air-driven Pipeline System ... 26  8.1 General Requirements ... 27  8.2 Commissioning and Test-run of Hydromatic Equipment ... 27  8.3 Commissioning and Test-run of Lubricant Equipment ... 28  8.4 Commissioning and Test-run of Grease Equipment ... 29  8.5 Commissioning and Test-run of Oil Fog Lubricating Equipment ... 29  8.6 Commissioning and Test-run of Technological Lubricating Equipment ... 30  8.7 Commissioning and Test-run of Air-driven System Equipment ... 31  Appendix A Quality Acceptance Records of Sub-item Projects in Installation of Metal Mechanical Hydromatic, Lubricating and Air-driven System Equipment ... 32  Appendix B Quality Acceptance Records of Sub-section Projects in Installation of Metal Mechanical Hydromatic, Lubricating and Air-driven System Equipment ... 33  Appendix C Quality Acceptance Records of Unit Projects in Installation of Metal Mechanical Hydromatic, Lubricating and Air-driven System Equipment ... 34  Appendix D Commissioning and Test-run Records for Metal Mechanical Hydromatic, Lubricating and Air-driven System Equipment ... 37  Appendix E No-load Linkage Test-run Records for Metal Mechanical Hydromatic, Lubricating and Air-driven System Equipment ... 38  Appendix F Coding of hydramatic transmission, oil solid particle contamination level (Excerpted from National Standard GB/T 14039-2002) ...
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 50387-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 50387-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 50387-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 50387-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 50387-2017?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 50387-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.