GB/T 42286.1-2022 English PDFUS$519.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 42286.1-2022: Electronic railway equipment - On board driving data recording - Part 1: Technical specification Status: Valid
Basic dataStandard ID: GB/T 42286.1-2022 (GB/T42286.1-2022)Description (Translated English): Electronic railway equipment - On board driving data recording - Part 1: Technical specification Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: S04 Classification of International Standard: 45.060 Word Count Estimation: 25,264 Date of Issue: 2022-12-30 Date of Implementation: 2023-07-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 42286.1-2022: Electronic railway equipment - On board driving data recording - Part 1: Technical specification---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 45.060 CCSS04 National Standards of People's Republic of China On-board driving data recording of rail transit electronic equipment Part 1.Technical Specifications recording system-Part 1.System specification, MOD) Posted on 2022-12-30 2023-07-01 Implementation State Administration for Market Regulation Released by the National Standardization Management Committee table of contentsPreface III Introduction V 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Abbreviations and Conventions 2 4.1 Abbreviations 2 4.2 Convention 3 5 requirements 3 5.1 Overview 3 5.2 Functional requirements 3 5.3 System Requirements 5 6 Declaration of Conformity11 Appendix A (Informative) Functional Breakdown Structure Overall 12 Appendix B (Informative) Monitoring Record Data Checklist 15 Reference 18forewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules for Standardization Documents" drafting. This document is the first part of GB/T 42286 "In-vehicle Driving Data Recording of Rail Transit Electronic Equipment". GB/T 42286 has The following parts were released. --- Part 1.Technical specifications; --- Part 2.Conformance testing. This document is modified to adopt IEC 62625-1.2013 "Rail Transit Electronic Equipment Vehicle Driving Data Recording System Part 1.System specification". Compared with IEC 62625-1.2013, this document has made the following structural adjustments. ---4.1 corresponds to 3.2 of IEC 62625-1.2013; ---4.2 corresponds to 3.3.1 of IEC 62625-1.2013; --- Chapter 5 corresponds to Chapter 4 of IEC 62625-1.2013; --- Chapter 6 corresponds to Chapter 5 of IEC 62625-1.2013. The technical differences between this document and IEC 62625-1.2013 and their reasons are as follows. --- Added the term "monitoring data" (see 3.4); --- Replaced ISO /IEC 8824 (all parts) with normatively referenced GB/T 16262 (all parts) (see 4.2, 3.3.2 of IEC 62625-1.2013), the degree of consistency between the two documents is equivalent, in order to adapt to my country's technical conditions, improve high operability; --- Replaced IEC 60571 with normatively quoted GB/T 25119 (see 5.3.1.7, 5.3.1.8, IEC 62625-1.2013 4.3.1.7, 4.3.1.8), the degree of consistency between the two documents is modified to adapt to my country's technical conditions and improve operability; --- Replace IEC 62498-1 with the normative reference GB/T 32347.1 (see 5.3.1.3, 4.3.1.3 of IEC 62625-1.2013), two The degree of consistency between the two documents is modified to adapt to my country's technical conditions and increase operability; --- Replaced IEC 61375 (all parts) with normatively referenced GB/T 28029 (all parts) (see 5.2.5.3, 5.3.1.9.3, 4.2.5.3, 4.3.1.9.3 of IEC 62625-1.2013), the degree of consistency between the two documents is modified to adapt to the technical standards of our country Technical conditions, increase operability; --- Changed the general requirements for on-board driving data recording systems (see 5.3.1.1, 4.3.1.1 of IEC 62625-1.2013), no need to Now "a train formation, ODDRS should include at least one on-board driving data recording unit"; --- Changed the requirements for environmental conditions (see 5.3.1.3, 4.3.1.3 of IEC 62625-1.2013), only need to meet GB/T 32347.1 environment upon request; --- Changed the requirements for ODDR unit identification and software upgrades (see 5.3.1.8.6, 4.3.1.8.6 of IEC 62625-1.2013), no Need to reflect the results of negotiations between the customer and the manufacturer; --- The normative reference document GB/T 42286.2 (see Chapter 6) has been added to adapt to the technical conditions of our country. The following editorial changes were made to this document. ---Change the standard name to "Rail Transit Electronic Equipment Vehicle Driving Data Recording Part 1.Technical Specifications" (see standard name name, the standard name of IEC 62625-1.2013); --- Deleted Note 1 of the term "marshalling" in IEC 62625-1.2013 (see 3.1 of IEC 62625-1.2013); ---Changed the full English names of the abbreviations "ATO" and "ATP" (see 4.1, 3.2 of IEC 62625-1.2013); --- Changed the abbreviation "GPS" to "GNSS" (see 4.1, 3.2 of IEC 62625-1.2013); --- Added the note of the abbreviation "ODDRS" (see 4.1); ---Deleted the abbreviations "ATS" "DIS" "EBA" "EMU" "ERTMS" "ETCS" "I/O" in IEC 62625-1.2013 "IT" "JRU" "LKJ" "LSB" "LZB" "PZB" "RAL" "SCMT" "TSI" and "VDV" (of IEC 62625-1.2016 3.2); ---Change the RAL color card to RGB (see 5.2.5.2, 4.2.5.2 of IEC 62625-1.2013); ---Deleted the description of unpublished standards and the responsibility for the application of standards in Chapter 1 of IEC 62625-1.2013; ---Deleted the content irrelevant to the situation in my country in the note of IEC 62625-1.2013 Table 1; --- Deleted 3.3.2, 4.4 and informative appendix A, appendix B, appendix C and appendix D of IEC 62625-1.2013. Please note that some contents of this document may refer to patents. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by the State Railway Administration. This document is under the jurisdiction of the National Rail Transit Electrical Equipment and System Standardization Technical Committee (SAC/TC278). This document is drafted by. Hunan CRRC Times Communication Signal Co., Ltd., Guangzhou Metro Group Co., Ltd., China State Railway Group Co., Ltd. Co., Ltd. Railway Safety Research Center, Tsinghua University, China Railway Beijing Bureau Group Co., Ltd., China Academy of Railway Sciences Group Co., Ltd. Institute of Standards and Metrology. The main drafters of this document. Wang Qi, Luo Yongsheng, Fu Xuefei, Chen Gang, Huang Kang, Wang Kaibo, Xiao Bangquan, Chen Haikang.IntroductionIn the rail transit market over the past ten years, the demand for on-board event recorders in trains, subways, and trams has continued to increase. transport The recorders required by businesses are becoming more and more complex, and are no longer satisfied with simple recording of speed, distance and running time. Currently, it is necessary Develop a common specification to unify such requirements, optimize vehicle design, and reduce costs. The objective of this document is to check the operation of the train according to the driving rules by recording the events during the operation of the train. This record can It can be used for inquiries after accidents or events, and can also be used for regular monitoring of the ability and qualifications of drivers to operate trains. This document is used to guide the direction of technology development, and does not restrict the implementation of on-board driving data recording, and does not restrict the implementation of rail transit train control vehicles. The existing independent recording unit of the loading device is constrained. GB/T 42286 is proposed to consist of three parts. --- Part 1.Technical specifications. The purpose is to standardize the general functions and system requirements for in-vehicle driving data recording. --- Part 2.Conformance testing. The purpose is to propose a consistency test method to verify whether the realization of on-board driving data recording is meet the requirements specified in this document. --- Part 3.Audio and video recording specifications. The purpose is to standardize audio and video technical requirements for in-vehicle driving data recording. On-board driving data recording of rail transit electronic equipment Part 1.Technical Specifications1 ScopeThis document specifies the functional and performance requirements for on-board driving data recording of rail transit vehicles. These train operation record data reflect the The behavior of the machine and the state of the on-board system are used to support the safety monitoring and recording of the system. The data is recorded in such a way as to facilitate the identification of causes and possible consequences for the following purposes. a) may be used for investigations in the event of incidents and accidents; b) Document the appropriateness of the driver's actions. This document specifies the general requirements for recording systems, applicable to all types of rail vehicles. Manage and save the data extracted from the recording device to ensure its integrity. This document does not include management and storage corresponding requirements and responsibility.2 Normative referencesThe contents of the following documents constitute the essential provisions of this document through normative references in the text. Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document. GB/T 16262 (all parts) Information Technology Abstract Syntax Notation One (ASN.1) [ISO /IEC 8824 (all parts)] Note 1.GB/T 16262.1-2006 Information Technology Abstract Syntax Notation One (ASN.1) Part 1.Basic Notation Specification (ISO /IEC 8824-1. 2002, IDT); GB/T 16262.2-2006 Information Technology Abstract Syntax Notation One (ASN.1) Part 2.Information Object Specification (ISO /IEC 8824-2. 2002, IDT); GB/T 16262.3-2006 Information Technology Abstract Syntax Notation One (ASN.1) Part 3.Constraint Specification (ISO /IEC 8824-3.2002, IDT); GB/T 16262.4-2006 Information Technology Abstract Syntax Notation 1 (ASN.1) Part 4.Parameterization of ASN.1 Specification (ISO /IEC 8824-4.2002, IDT). GB/T 25119 Rail Transit Rolling Stock Electronic Devices (GB/T 25119-2021, IEC 60571.2012, MOD) GB/T 28029 (all parts) Rail Transit Electronic Equipment Train Communication Network (TCN) [IEC 61375 (all parts)] Note 2.GB/T 28029.1-2020 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 1.Basic Structure (IEC 61375-1.2012, MOD); GB/T 28029.2-2020 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 2-1.Wounded Train Bus (WTB) (IEC 61375-2-1.2012, MOD); GB/T 28029.3-2020 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 2-2.Wounded Train Bus (WTB) 1 Conformity test (IEC 61375-2-2.2012, MOD); GB/T 28029.4-2020 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 2-3.TCN Communication Protocol (IEC 61375- 2-3.2012,MOD); GB/T 28029.5-2020 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 2-4.TCN Application Protocol (IEC 61375- 2-4.2018,MOD); GB/T 28029.6-2020 Rail Transit Electronic Equipment Train Communication Network (TCN) Part 2-5.Ethernet Train Backbone Network (ETB) (IEC 61375-2-5.2014, MOD); ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 42286.1-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 42286.1-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 42286.1-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 42286.1-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |