Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 42005.1-2022 English PDF

US$479.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 42005.1-2022: Railway applications - Onboard energy storage tram - Part 1: Capacitance-type energy storage cubicle
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 42005.1-2022479 Add to Cart 5 days Railway applications - Onboard energy storage tram - Part 1: Capacitance-type energy storage cubicle Valid

Similar standards

GB/T 36287   GB/T 34574   GB/T 25123.4   GB/T 45306   GB/T 34571   GB/T 42005.2   

Basic data

Standard ID: GB/T 42005.1-2022 (GB/T42005.1-2022)
Description (Translated English): Railway applications - Onboard energy storage tram - Part 1: Capacitance-type energy storage cubicle
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: S35
Classification of International Standard: 29.280
Word Count Estimation: 26,236
Date of Issue: 2022-10-14
Date of Implementation: 2023-05-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 42005.1-2022: Railway applications - Onboard energy storage tram - Part 1: Capacitance-type energy storage cubicle


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Railway applications -- Onboard energy storage tram -- Part 1.Capacity-type energy storage cubicle ICS 29.280 CCSS35 National Standards of People's Republic of China Rail Transit Energy Storage Tram Part 1.Capacitive energy storage power supplies Published on 2022-10-12 2023-05-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Environmental conditions 3 5 Technical Requirements 3 6 Inspection method 7 7 Inspection rules 18 8 signs 19 9 Packaging, transport, storage and recycling20

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document is Part 1 of GB/T 42005 "Energy Storage Trams for Rail Transit". GB/T 42005 has released the following 2 part. --- Part 1.Capacitive energy storage power supply; --- Part 2.Ground charging systems. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by the National Railway Administration. This document is under the jurisdiction of the National Standardization Technical Committee of Electrical Equipment and Systems for Rail Transit (SAC/TC278). This document is drafted by. CRRC Zhuzhou Electric Locomotive Co., Ltd., Ningbo CRRC New Energy Technology Co., Ltd., Guangzhou Tramway Co., Ltd. Responsible company, CRRC Zhuzhou Electric Locomotive Research Institute Co., Ltd., CRRC Qingdao Sifang Vehicle Research Institute Co., Ltd. The main drafters of this document. Zhang Weixian, Rao Guohua, Ruan Dianbo, Fan Xiaoyun, Chen Guangzan, Liu Luzhou, Li Yumei.

Introduction

Rail transit energy storage trams have been operated in large quantities in China, and relevant domestic units have mastered the energy storage power supply, charging system and other related issues. The core technology of key components, and through years of engineering application, has a certain technical accumulation and field application experience. By refining the key Energy indicators and inspection items, combined with years of production and application experience to formulate relevant standards, will help further promote the development of related industries. GB/T 42005 aims to specify the functional requirements, performance requirements, safety and Protection requirements, inspection methods, etc. GB/T 42005 "Rail Transportation Energy Storage Tram" is intended to be composed of two parts. --- Part 1.Capacitive energy storage power supply. The purpose is to stipulate that the energy storage power supply needs to have a fault detection function, a communication function and a voltage balance. related requirements such as balance function; clarify key performance indicators such as energy efficiency, voltage retention capability, energy retention capability, and temperature consistency Standard; specifies the safety performance requirements of capacitor monomer, module and energy storage power supply; Carry out test methods specific to energy storage power sources such as retention capability test, energy retention capability test, thermal runaway and temperature consistency. Regulation. --- Part 2.Ground charging systems. The purpose is to specify the system composition, use conditions, main Functions, inspection methods, inspection rules, and clarify each function such as charging function, communication function, data acquisition, event recording and storage display. Definition and requirements of display, hot standby function, control function, protection function, safety interlock function; clarify insulation performance, rated power, System Efficiency, Electromagnetic Compatibility, Power Factor, Temperature Rise, Noise, Thermal Standby Energy Consumption, DC Ripple, DC Voltage Accuracy, Voltage Current Balance requirements, grounding, fire protection and safety, structural requirements, performance index requirements for protection levels; system inspection points and references The standard specifies the requirements for each inspection item in the type test, factory test and field test. Rail Transit Energy Storage Tram Part 1.Capacitive energy storage power supplies

1 Scope

This document specifies the environmental conditions, technical requirements and inspection methods of capacitive energy storage power supply for energy storage trams (hereinafter referred to as "energy storage power supply"). laws, inspection rules, marking, packaging, transportation, storage and recycling. This document is applicable to the energy storage power supply of energy storage electric vehicles using electric double layer capacitors and hybrid capacitors as energy storage units.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB/T 2423.1 Environmental Testing of Electrical and Electronic Products Part 2.Test Methods Test A. Low Temperature GB/T 2423.2 Environmental Testing of Electrical and Electronic Products Part 2.Test Methods Test B. High Temperature GB/T 2423.4 Environmental testing of electrical and electronic products Part 2.Test method Test Db. Alternating damp heat (12h 12h cycle ring) GB/T 2423.17 Environmental Testing of Electrical and Electronic Products Part 2.Test Methods Test Ka. Salt Spray GB/T 4208 enclosure protection class (IP code) GB/T 4798.5-2007 Environmental Conditions for the Application of Electrical and Electronic Products Part 5.Ground Vehicle Use GB/T 9174 General technical conditions for general cargo transport packaging GB/T 21563-2018 Shock and vibration test of rolling stock equipment for rail transit GB/T 24338.4 Rail Transit Electromagnetic Compatibility Part 3-2.Rolling Stock Equipment GB/T 25121.3-2018 Power Electronic Capacitors for Rail Transit Rolling Stock Equipment Part 3.Electric Double Layer Capacitors GB/T 29481-2013 Electrical Safety Signs GB/T 32350.1 Rail Transit Insulation Coordination Part 1.Basic Requirements for Clearance and Creepage of Electrical and Electronic Equipment distance GB/T 34571 Rail Transit Locomotive and Rolling Stock Wiring Rules GB/T 34870.1-2017 Supercapacitor Part 1.General ISO 3095.2013 Acoustic Rail Transit Noise Measurements Emitted by Rail Vehicles (Acoustics-Railwayapplications-

3 Terms and Definitions

The terms and definitions defined in GB/T 34870.1-2017 and the following terms and definitions apply to this document. 3.1 With breaking and isolation equipment, it is composed of one or more capacitor modules through series and parallel combination with power management system and voltage equalization.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 42005.1-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 42005.1-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 42005.1-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 42005.1-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.