GB/T 41999-2022 English PDFUS$269.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41999-2022: Terminology of shore-to-ship power supply facilities Status: Valid
Basic dataStandard ID: GB/T 41999-2022 (GB/T41999-2022)Description (Translated English): Terminology of shore-to-ship power supply facilities Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K04 Classification of International Standard: 29.020 Word Count Estimation: 14,153 Date of Issue: 2022-10-14 Date of Implementation: 2023-05-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 41999-2022: Terminology of shore-to-ship power supply facilities---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Terminology of shore-to-ship power supply facilities ICS 29.020 CCSK04 National Standards of People's Republic of China Port Shore Power Facility Terminology Published on 2022-10-12 2023-05-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III 1 Scope 1 2 Normative references 1 3 Basic terms 1 4 Port Power System 2 5 Shore-based power supply system 2 6 Ship to shore connection system 3 7 Ship power receiving system 4 8 Construction and operation 5 Reference 6 Index 7 forewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed and managed by China Electricity Council. This document is drafted by. State Grid Corporation of China, NARI Group Co., Ltd., Ministry of Transport Water Transport Research Institute, China Electrical Appliances Division Research Institute Co., Ltd., China Shipbuilding Industry Corporation No. 704 Research Institute, State Grid Chongqing Electric Power Company Electric Power Research Institute Institute, State Grid Hunan Electric Power Co., Ltd. Electric Power Research Institute, Institute of Electrical Engineering, Chinese Academy of Sciences, Xiamen Free Trade Zone Port Electric Power Co., Ltd. Division, Hunan University. The main drafters of this document. Zhu Jinda, Tang Chenghong, Deng Renren, Zhang Xinghua, Zhuang Ying, Yang Rui, Li Jia, Cai Jun, Huang Kun, Wen Dianguo, Lai Yanhong, Xie Yeyuan, Wu Gaoxiang, Wang Haining, Xu Xianyong, Yin Lijun, Wu Yuming, He Shengli, Tian Dawei, Chi Fuhai, Wang Pan, Wang Bingwen, Wang Xin, Lin Dachun, Huang Yibin, Wang Fang, Chen Yandong, Gao Yipan, Li Zhe, Zhu Xiaoqiang, Chen Yonghua, Zhang Rutong, Dong Cheng, Zheng Guangbo, Fang Lu, Dai Haoreng, Chao Yafeng. Port Shore Power Facility Terminology1 ScopeThis document defines terms and definitions related to port shore power facilities. This document applies to the port shore power facilities that provide electrical energy to the ship during the berthing (berthing) period of the ship.2 Normative referencesThere are no normative references in this document.3 Basic terms3.1 During the ship's berthing (berthing), all the related power supply and auxiliary facilities for providing electrical energy to the ship. 3.2 A system that provides electrical energy to the ship from the shore power facilities of the port during the ship's berthing (berthing). Note. Including port power system, shore-based power supply system, ship-shore connection system, ship power receiving system. 3.3 emergencyshutdown emergency stop When emergencies such as threats to the power facilities or personal safety of the shore power system of the port are involved, the shore-based power supply system and the ship's power supply are urgently cut off. Measures for electrical connection between systems. 3.4 An electrical connection that makes the potentials substantially equal between the conductive parts of the port shore power system. 3.5 power-onswitching In the state of uninterrupted power supply to the ship's load, the switch between shore power and ship power is completed. [Source. GB/T 36028.2-2018, 3.2] 3.6 power-offswitching When the power supply of the ship's load is interrupted, the switch between shore power and ship power is completed. [Source. GB/T 36028.2-2018, 3.2] 3.7 It is a kind of protection to avoid the reverse power transfer from the ship generator to the shore-based power supply system when the uninterruptible power supply switching mode is adopted. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41999-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41999-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 41999-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41999-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |