Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 41996-2022 English PDF

US$699.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 41996-2022: Guide of operation management model for the digital workshop of switchgear
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 41996-2022699 Add to Cart 5 days Guide of operation management model for the digital workshop of switchgear Valid

Similar standards

GB/T 11022   GB/T 38328   GB/T 30092   GB/T 45932   GB/Z 15166.8   

Basic data

Standard ID: GB/T 41996-2022 (GB/T41996-2022)
Description (Translated English): Guide of operation management model for the digital workshop of switchgear
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K43
Classification of International Standard: 29.130.10
Word Count Estimation: 38,360
Date of Issue: 2022-10-14
Date of Implementation: 2023-05-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 41996-2022: Guide of operation management model for the digital workshop of switchgear

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide of operation management model for the digital workshop of switchgear ICS 29.130.10 CCSK43 National Standards of People's Republic of China A guide to the operation management model of switchgear digital workshops ofswitchgear Published on 2022-10-12 2023-05-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 2 5 Construction basis of operation management model of switchgear digital workshop 2 5.1 Analysis of operation management model of switchgear digital workshop 2 5.2 Basic requirements of the operation management model 3 6 Production Planning Scheduling Model 3 6.1 Running Model 3 6.2 Drive data 6 6.3 Running the process 8 6.4 Running result output 9 7 Production line running model 10 7.1 Running the model 10 7.2 Drive data 11 7.3 Running the process 12 7.4 Running result output 14 8 Material distribution model 14 8.1 Running the model 14 8.2 Drive data 15 8.3 Running the process 15 8.4 Running result output 17 9 Device Management Model 17 9.1 Running the model 17 9.2 Drive data 18 9.3 Running the process 19 9.4 Running result output 20 10 Quality Inspection Model 21 10.1 Running the model 21 10.2 Drive data 21 10.3 Running the process 22 10.4 Running result output 24 11 Product Model 24 11.1 Running the Model 24 11.2 Drive data 24 11.3 Running the process 25 11.4 Running result output 25 12 Process Model 26 12.1 Running the Model 26 12.2 Drive data 26 12.3 Running the process 26 12.4 Running result output 27 13 Security Model 27 13.1 Running the Model 27 13.2 Drive data 28 13.3 Running the process 28 13.4 Running Results Output 29 Reference 30

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by China Electrical Equipment Industry Association. This document is under the jurisdiction of the National Standardization Technical Committee for High Voltage Switchgear (SAC/TC65). This document is drafted by. Xi'an Xidian Electric Research Institute Co., Ltd., Xi'an High Voltage Electric Appliance Research Institute Co., Ltd., Huazhong Science and Technology Co., Ltd. Technical University, Huagong Manufacturing Equipment Digitalization National Engineering Center Co., Ltd., Northwestern Polytechnical University, Xi'an University of Electronic Science and Technology, Machinery Industry Instrument Instrument Comprehensive Technical and Economic Research Institute, China Electronics Technology Standardization Institute, Beijing Institute of Electrical Technology and Economics of Machinery Industry, Xi'an Xidian Switch Electric Co., Ltd., Xi'an Xidian High Voltage Switch Actuator Co., Ltd., Xidian Baoji Electric Co., Ltd., Henan Senyuan Electric Co., Ltd., Tianshui Great Wall Switch Factory Co., Ltd. The main drafters of this document. Chen Rongwei, Yan Liping, Shi Yabin, Hu Jinshou, Su Xiaoyi, Zhang Mei, Yan Xinglang, Zhao Yong, Wang Sha, Wang Dong, Liu Qian, Jiang Zongmin, Liu Jingbo, Wu Shengbin, Wang Haibin, Liu Zhuang, Zhang Shi, Zhu Haiping, Yu Zhimin, Geng Junhao, Chang Jiantao, Xiong Wenze, Zhao Xiangyang, Deng Wei, Guo Qinghong, Tian Tian, Jiang Xiaogang, Cao Hong, Prime Minister Gu, Gao Guofang. A guide to the operation management model of switchgear digital workshops

1 Scope

This document provides the basis for the construction of the digital workshop operation management model of switchgear, the production planning and scheduling model, the production line operation model, the material Guides such as material distribution model, equipment management model, quality inspection model, product manufacturing model, process model and safety model. This document is applicable to guide 72.5kV and above gas-insulated metal-enclosed switchgear and 3.6kV~40.5kV metal-enclosed switchgear The operation management model of the digital assembly workshop of equipment and control equipment is built, and other switchgear can be implemented by reference.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB/T 3906-2020 3.6kV~40.5kV AC metal-enclosed switchgear and control equipment GB/T 7674-2020 Gas-insulated metal-enclosed switchgear with rated voltage of 72.5kV and above GB/T 18725-2008 Manufacturing Information Technology Terminology

3 Terms and Definitions

The terms and definitions defined in GB/T 18725-2008 and the following terms and definitions apply to this document. 3.1 gas-insulated metal-enclosed switchgear gas-insulated metal-enclosed switchgear Metal-enclosed switchgear and control switches employing at least part of the gas above atmospheric pressure as the insulating medium. [Source. GB/T 7674-2020, 3.2] 3.2 Switchgear and controlgear that are fully assembled and enclosed in a grounded metal enclosure, except for external connections. [Source. GB/T 3906-2020, 3.102, with modifications] 3.3 digitalization Representing (or representing) data in numerical form that is not otherwise discrete data. Specifically, it is to convert images or sounds into digital code so that the information can be processed and stored by the computer system. In the information age, digitization has become an indicator of the degree of informatization. an important indicator. [Source. GB/T 18725-2008, 3.83] 3.4 digital workshop digitalworkshop Based on the physical workshop and using information technology as a method, data is used to connect different units of the production and operation process to plan and manage production. management, diagnosis and optimization to achieve high efficiency, low cost and high quality of product manufacturing.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 41996-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 41996-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 41996-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 41996-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.