GB/T 41340.1-2022: Technical specifications for productivity calculation of ocean energy power station - Part 1: Tidal current energy
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 41340.1-2022219 Add to Cart 3 days Technical specifications for productivity calculation of ocean energy power station - Part 1: Tidal current energy Valid

Similar standards

GB/T 41087   GB/T 51063   NB/T 32012   GB/T 41341.1   GB/T 41341.2   GB/T 41340.2   

Basic data

Standard ID: GB/T 41340.1-2022 (GB/T41340.1-2022)
Description (Translated English): Technical specifications for productivity calculation of ocean energy power station - Part 1: Tidal current energy
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F14
Word Count Estimation: 11,194
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 41340.1-2022: Technical specifications for productivity calculation of ocean energy power station - Part 1: Tidal current energy


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specifications for productivity calculation of ocean energy power station - Part 1.Tidal current energy ICS 07.060;27.180 CCSF14 National Standards of People's Republic of China Technical Specifications for Calculation of Power Generation of Ocean Power Stations Part 1.Trend Energy station-Part 1.Tidalcurrentenergy 2022-10-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface I Introduction II 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Workflow 1 5 Hierarchical division of array size 2 6 Data collection 2 7 Field Observations 2 7.1 Fixed-point power flow observation 2 7.2 Navigation current observation 2 7.3 Tidal level observation 3 7.4 Instrument Verification/Calibration 3 8 Numerical Simulation 3 9 Micro Site Selection 3 9.1 Type selection of tidal power units 3 9.2 Array layout optimization of tidal power units 4 9.3 Tidal flow field recalculation 4 10 Calculation method of power generation 4 10.1 Power generation calculation parameters 4 10.2 Annual cumulative frequency of flow velocity at all levels 4 10.3 Theoretical annual power generation 5 10.4 years of on-grid electricity5 11 Technical Report 5 Appendix A (Informative) Engineering Parameters and Array Layout Example 6 Reference 7

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document is part 1 of GB/T 41340 "Technical Specifications for Calculation of Power Generation in Ocean Power Stations". GB/T 41340 has been released The following parts. --- Part 1.Trend energy; --- Part 2.Wave energy. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by the Ministry of Natural Resources of the People's Republic of China. This document is under the jurisdiction of the National Marine Standardization Technical Committee (SAC/TC283). This document is drafted by. National Marine Technology Center, Hohai University, Harbin Engineering University. The main drafters of this document. Wu He, Jiang Bo, Fang Shuzhou, Wang Xiaoyong, Zhang Jisheng, Zhou Qingwei, Bai Yang, Zhang Rong, Zhang Liang, Wu Yanan, Sheng Qihu.

Introduction

Under the strategic goal of "carbon peaking and carbon neutrality", the development of clean and low-carbon energy such as ocean energy can greatly reduce the level of CO2 emissions and help the Efforts to implement the national dual-carbon target strategy. In this regard, my country has established a standard system to support the investigation, evaluation, development and utilization of ocean energy. exist In this standard system, GB/T 41340 "Technical Specifications for Calculation of Power Generation of Ocean Energy Power Stations" is the basis for guiding the calculation of power generation of marine power stations in my country. basic standard. GB/T 41340 aims to establish the process, micro-site selection and calculation method of power generation of ocean energy power stations, which consists of two Partial composition. --- Part 1.Trend energy. The purpose is to establish the power generation calculation work suitable for the tidal current power station. --- Part 2.Wave energy. The purpose is to establish the calculation work of power generation suitable for wave power plants. The development of technical specifications for the calculation of power generation of ocean energy power stations and the standardization of calculation methods for ocean energy power stations are the key to large-scale development and utilization of ocean energy resources. important technical support. Technical Specifications for Calculation of Power Generation of Ocean Power Stations Part 1.Trend Energy

1 Scope

This document specifies the work flow of the power generation calculation of the tidal current power station, the classification of the array scale, data collection, on-site observation, numerical value Compilation of simulation, micro-site selection, calculation method of power generation and technical report. This document is applicable to the calculation of the power generation of tidal power plants.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB/T 12763.2 Oceanographic Survey Specifications Part 2.Marine Hydrological Observations GB/T 12763.10 Oceanographic Survey Specifications Part 10.Submarine Topography Survey GB/T 14914.2 Ocean Observation Specification Part 2.Coastal Observation GB/T 33543.1 Ocean Energy Terminology Part 1.General GB/T 33543.2 Ocean Energy Terminology Part 2.Investigation and Evaluation GB/T 33543.3 Ocean Energy Terminology Part 3.Power Station GB/T 34910.4 Guidelines for the Survey and Evaluation of Marine Renewable Energy Resources Part 4.Ocean Current Energy JTS/T 231-4 Technical Regulations for Water Transport Engineering Simulation Test

3 Terms and Definitions

Terms and definitions defined in GB/T 33543.1, GB/T 33543.2, and GB/T 33543.3 apply to this document.

4 Workflow

The workflow for generating electricity calculation should include. a) The division of the array scale grade, according to the number of generator sets in the tidal current power station, according to the provisions of Chapter 5 to determine the array scale grade; b) Data collection, determine the target sea area according to the tidal current power station site, and collect the basis of the sea area for the past 5 years according to the provisions of Chapter 6 information; c) Tidal current and tide level observation, carry out fixed-point tidal current observation, navigational current observation and tide level observation, data quality control, according to the regulations in Chapter 7 to execute; d) numerical simulation of power flow, carry out numerical simulation of power flow according to the provisions of Chapter 8; e) Micro-site selection, carry out micro-site selection according to the provisions of Chapter 9; f) calculation method of power generation, calculate the power generation by tidal current energy according to the provisions of Chapter 10; g) Preparation of technical report, according to the requirements of Chapter 11, prepare a technical report on the calculation of power generation of tidal current power station.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 41340.1-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 41340.1-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 41340.1-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 41340.1-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.