GB/T 40874-2021 English PDFUS$179.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40874-2021: Crude petroleum and petroleum products - Bulk cargo transfer - Guidelines for achieving the fullness of pipelines Status: Valid
Basic dataStandard ID: GB/T 40874-2021 (GB/T40874-2021)Description (Translated English): Crude petroleum and petroleum products - Bulk cargo transfer - Guidelines for achieving the fullness of pipelines Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: E30 Word Count Estimation: 9,988 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 40874-2021: Crude petroleum and petroleum products - Bulk cargo transfer - Guidelines for achieving the fullness of pipelines---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Crude petroleum and petroleum products - Bulk cargo transfer - Guidelines for achieving the fullness of pipelines ICS 75.180.30 CCSE30 National Standards of People's Republic of China Bulk cargo transfer of crude oil and petroleum products Pipeline filling guide (ISO 11563.2003,MOD) Released on 2021-10-11 2022-05-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. This document uses the redrafting law to amend and adopt ISO 11563.2003 "Crude Oil and Petroleum Products Bulk Cargo Transfer Pipeline Filling Guidelines" South". Compared with ISO 11563.2003, this document has many adjustments in structure. Appendix A gives this document and ISO 11563.2003 The chapter number comparison table. The technical differences between this document and ISO 11563.2003 and the reasons are as follows. a) Deleted "International Oil Tanker and Oil Terminal Safety Guide (ISGOTT)" (see Chapter 4), which should not be placed in the main text; b) The relevant content of laws and regulations has been deleted (see Chapter 4), and the drafting documents should not contain documents that require compliance with laws and regulations or policies. Terms; c) The content of obtaining the reference volume of the designated pipeline of the oil tanker (see 6.3.6) has been added to determine the replacement amount relatively accurately; d) Modify the "volume required for pipeline replacement" to "approximate amount" (see 6.3.11), so that the contents of the file echo the beginning and the end. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed and managed by the National Petroleum Products and Lubricants Standardization Committee (SAC/TC280). This document was drafted by. China Petroleum & Chemical Corporation Research Institute of Petrochemical Technology, China Certification & Inspection Group Shandong Co., Ltd. Company, State Pipe Network Group Eastern Crude Oil Storage and Transportation Co., Ltd., State Pipe Network Group Northern Pipeline Co., Ltd., China Petroleum and Chemical Corporation Co., Ltd. Zhenhai Refining and Chemical Company, Sinopec Qingdao Refining and Chemical Co., Ltd., Sinopec Jinling Petrochemical Co., Ltd. Company, Zhejiang Petroleum Branch of Sinopec Sales Co., Ltd., Xinjiang Petroleum Branch of Sinopec Sales Co., Ltd., Sinopec Chemical Fuel Oil Sales Co., Ltd. The main drafters of this document. Sun Yan, Wei Jinxiang, Liu Chongwei, Zhang Guang, Wang Zhixue, Xiao Guocan, Lin Ligen, Yu Zhou, Cao Lei, Han Cunhui, Guo Hongyu, Xu Min.IntroductionWhen crude oil and petroleum products are being transferred, the accurate measurement of the transfer volume is affected by the fullness of the cargo in the transfer pipeline and the pipeline. if The transfer pipeline contains air or steam, or the cargo to be transferred and the cargo in the pipeline have different physical properties. The line is filled with liquid compatible with the cargo to be transferred. Bulk cargo transfer of crude oil and petroleum products Pipeline filling guide1 ScopeThis document provides guidance for achieving full pipeline. This document is applicable to the loading and unloading of crude oil and petroleum products that are liquid under normal pressure, and the transfer between storage tanks in some areas. This document does not apply to long-distance pipelines.2 Normative referencesThere are no normative references in this document.3 Terms and definitionsThere are no terms and definitions that need to be defined in this document.4 Safety adviceAll safety recommendations should comply with the terms and conditions specified by the tanker and loading dock. Note. The International Safety Guide for Oil Tankers and Oil Terminals (ISGOTT) provides guidelines for the safe transportation and loading and unloading of oil and petroleum products by oil tankers and loading and unloading terminals. suggestion.5 Responsibility5.1 Loading dock 5.1.1 The loading and unloading terminal should designate a pipeline system with flowmeter (if used) and storage tank (if used), and give the designated pipeline Reference volume. 5.1.2 If the high-position exhaust valve/view mirror method (see 6.5) is selected to determine whether the designated pipeline is full, the loading dock should provide an exhaust valve or The position of the sight glass. 5.2 Oil tanker 5.2.1 The oil tanker should provide the reference volume of the designated pipeline on board used for pipeline replacement operations, and give the empty or full status of the designated pipeline. 5.2.2 The fullness of designated pipelines on ships has a direct impact on the accuracy of pipeline replacement operations between the tanker and the shore. Oil tanker Provide assistance as much as possible to accurately determine the fullness of designated pipelines on ships.6 methods6.1 Overview This document gives the following methods to fill the pipeline. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40874-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40874-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 40874-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40874-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |