Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 39984-2021 English PDF

US$834.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 39984-2021: Pump system energy assessment
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 39984-2021834 Add to Cart 7 days Pump system energy assessment Valid

Similar standards

JB/T 6879   GB/T 7782   JB/T 13977   GB/T 45819   GB/T 39986   

Basic data

Standard ID: GB/T 39984-2021 (GB/T39984-2021)
Description (Translated English): Pump system energy assessment
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: J71
Word Count Estimation: 44,452
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 39984-2021: Pump system energy assessment

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Pump system energy assessment ICS 23.080 J71 National Standards of People's Republic of China Pump system energy consumption assessment (ISO /ASME14414.2019, IDT) Released on 2021-04-30 2021-11-01 implementation State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee

Table of contents

Foreword Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Authority and functions of the assessment team 2 4.1 Determination of the responsibilities of the assessment team 2 4.2 Organizational structure, leadership settings and capabilities of the assessment team 2 4.3 Facility support 3 4.4 Communication 3 4.5 Access to and acquisition of facilities, personnel and information 3 4.6 Evaluation objectives, scope and boundaries 3 4.7 Action Plan 3 4.8 Collection and evaluation of raw data 4 4.9 Goal check 5 5 Implementation evaluation 5 5.1 Evaluation level 5 5.2 On-site preliminary investigation 7 5.3 Analysis of system function requirements 8 5.4 Determine system boundaries and system energy consumption requirements 8 5.5 Information needed to assess pump system efficiency 8 5.6 Data collection 11 5.7 Cross validation 12 5.8 Summary meeting, preliminary findings and recommendation report 12 6 Reports and documents 12 6.1 Final Evaluation Report 12 6.2 Data for third-party review 12 6.3 Review of the final report by members of the evaluation team 12 Appendix A (Normative Appendix) Report Content 13 Appendix B (informative appendix) Suggested examples of system efficient operation and energy saving 16 Appendix C (informative appendix) Professional knowledge, experience and ability 29 Appendix D (informative appendix) Analysis Software Reference Guide 31 Appendix E (informative appendix) Example of pre-screening worksheet 32 Appendix F (informative appendix) Specific energy consumption 33 Appendix G (informative appendix) Parasitic power of pump system 36 Appendix H (informative appendix) Examples of pump system efficiency indicators 38 Reference 40 Pump system energy consumption assessment

1 Scope

This standard specifies the requirements for the implementation of pump system energy consumption assessment (hereinafter referred to as "assessment") and the formation of result reports. The system here includes The whole process of energy input to complete work output from this energy. The evaluation goal of pumping system energy consumption is to determine the current energy consumption of the existing system and find ways to improve the efficiency of the system. These requirements include. ---Organize and implement evaluation; ---Analyze and evaluate the data; ---Report and archive the evaluation results. This standard applies to open and closed circuit pumps commonly used in industries, public institutions, commercial and municipal facilities that need to be evaluated. This standard applies to the evaluation of electric drive pump systems that are dominant in most industrial facilities, but it also applies to other drive types such as steam. Turbines and engines, etc. But this standard. a) Does not specify how to design the pump system; b) It does not specify the qualifications and professional knowledge that the standard user should have (Appendix C only specifies the professional knowledge and expertise that the evaluator should have Experience and competency requirements); c) does not involve the training or qualification of personnel; d) Does not stipulate the implementation requirements of the recommendations made in the evaluation process, but stipulates the requirements for the preparation of an action plan; e) Does not specify the measurement and confirmation requirements for energy saving due to the implementation of the evaluation recommendations; f) Does not specify the measurement requirements in the evaluation process and the calibration requirements of the measuring equipment used; g) Does not specify the implementation cost estimate or financial analysis of the recommendations made in the evaluation process; h) It does not specify the specific steps required for the safe operation of the equipment during the assessment process. Responsible for the facility during the data collection stage of the assessment process Normal operation personnel should ensure the safety of equipment operation; i) No intellectual property rights, security, confidentiality and safety are involved.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document. ISO 17769-1 General terms, definitions, quantities, characters and units for liquid pumps and their devices. Part 1.Liquid pumps (Liquid pumpsandintalation-Generalterms,definations,quantities,lettersymbolsandunits-Part 1. Liquidpumps) ISO 17769-2 General terms, definitions, quantities, characters and units for liquid pumps and their devices-Part 2.Pump system (Liquid pumpsandintalation-Generalterms,definations,quantities,lettersymbolsandunits-Part 2.Pum- pingsystem)

3 Terms and definitions

The following terms and definitions defined by ISO 17769-1 and ISO 17769-2 apply to this document. The assessment agency should appoint the assessment team leader. In addition to the assessment agency, the assessment team leader can be a person from the facility or an external assessment team. As an auditor. When the evaluation team is not large, the team leader can be a competent internal reviewer. 4.3 Facility support The facility should understand and support the evaluation activities. Within the scope of necessary assessment, the facility side shall allow its own personnel to participate in the assessment. The evaluation team shall obtain the following written support from the facility management before implementing the evaluation. --- Commit the necessary funds, personnel and other resources to support the evaluation activities; ---Commit to communicate with facility management personnel and inform the importance of evaluation. 4.4 Communication The communication channels needed for the evaluation should be established. The evaluation team should provide clear guidelines for communication among evaluation team members so that all necessary information and data can be exchanged in a timely manner. This information and data should include management data, logistics information, and operation and maintenance data. 4.5 Access to and acquisition of facilities, personnel and information The evaluation team should have access to. ---Assess the involved facility area and pump system; ---Facilities related personnel (engineering and technical personnel, operators, maintenance personnel, etc.), equipment suppliers, contractors and other personnel to collect Useful information for evaluation activities and data analysis, used to prepare reports; ---Other information resources, such as drawings, manuals, data sheets, maintenance records, test reports, historical cost information, computer monitoring and control Control data, electrical equipment panels and calibration records. All these raw data, which are initially determined to be essential for the evaluation activities, should be passed through contact with experienced and knowledgeable personnel from the facility. Obtained after discussion. 4.6 Evaluation objectives, scope and boundaries The overall objective and scope of the evaluation, including some of the facilities and system boundaries to be evaluated, should be discussed and reached by the evaluation team at the beginning stage Unanimous. The assessment team should prepare a list of site-specific targets for each pump system, such as performance improvement targets. 4.7 Action plan 4.7.1 General In order to facilitate the evaluation and make all members of the evaluation team know how to conduct the evaluation, the evaluation team should prepare a preliminary action plan and discuss it with the system industry. The Lord agreed. The action plan should be flexible enough to adapt to the various results that appear during the evaluation process. These include. a) Establish evaluation goals, in particular. 1) Determine the system boundary (see 5.4); 2) Check the information collected before the start of the evaluation; 3) Determine the degree of understanding of the system and the general information that must be obtained; 4) The level 1 assessment starts (see 5.1.2). b) Information objectives of the evaluation (see 5.1). 1) Determine the boundaries of the evaluation; 2) Determine the system to be evaluated; 3) Determine the specific information available and the information that must be collected; 4) Determine the information that can be obtained from paper records (such as logbooks) or computer systems in the facility and the systems that should be measured parameter; 5) Identify the personnel involved in and responsible for the necessary data collection. c) Establish measurement requirements (see 5.6), in particular. 1) Determine whether the operating conditions at only a certain moment are sufficient for evaluation (level 2, see Table 1), or whether it is necessary to collect in Information within a certain period of time (level 3, see Table 2); 2) Determine whether the permanently installed measuring equipment is available and reliable. d) Determine the target of additional information, especially the actual process requirements (see 5.4). e) Determine the methods needed to achieve the objective of the evaluation information. 1) Refer to Appendix B to determine the data analysis method; 2) Determine the tools/software programs to be used. f) Determine the content and responsibilities of the report. 4.7.2 Evaluation schedule Before the evaluation begins, the evaluation date, as well as the date and time of important meetings, should be clarified. The evaluation meeting should include. ---The kick-off meeting should be held just before the start of the evaluation. The purpose of the meeting is to review the data collected from the initial collection and evaluation Information (see 4.8) and establish a work schedule. During the meeting, the assessment team should discuss security protocols, tools, methods, measurements, and requirements. The metering and diagnostic equipment, etc. are discussed. ---On-site assessment schedule. ---According to the opinions reached by the assessment team, it is advisable to report to the facility management in the form of task reports on a regular basis. ---Conduct a summary meeting after the on-site activity is over. Its purpose is to outline the evaluation survey and give preliminary recommendations (see 5.8). The evaluation team shall determine corrective measures for abnormal situations that may or have occurred during the evaluation period (such as computer recording system failures). 4.8 Collection and evaluation of raw data 4.8.1 General Before the evaluation begins, raw data should be collected [see 4.7.1a) and b)]. To speed up the data collection process, relevant data can be collected in advance. Note. This information will be used in all evaluation stages. 4.8.2 Initial communication with facility experts The assessment team shall collect equipment operation information and any operation that has an impact on equipment energy consumption through communication with facility personnel and experts factor. The assessment team should also contact the relevant personnel of the facility, who understand that changes in the pump system will affect the associated system. 4.8.3 Implementation history of energy saving projects The evaluation team should collect and review the energy-saving projects, evaluations, audits, benchmarks, and energy consumption levels of the same industry that have been implemented for the pump system to be evaluated. 4.8.4 Energy costs The review team should collect cost data, including the cost of electricity per kilowatt hour, or other similar items, taking into account all costs, such as demand fees Usage, peak rate, daily rate for each time period and other fees charged according to actual usage. If necessary, consider generating on-site power generation These costs can be used for subsequent analysis, such as on-site power generation, there should be exempted costs or potential energy sales costs. The evaluation team shall agree on the effective period of cost incurred. i) The functional requirements of the pump system change over time, but the pump does not change accordingly; j) Pump impellers, guide vanes, vanes, seal rings or pump bodies are worn, corroded, deformed or damaged (if the facility has relevant information, it can be Provided by the provider); k) Blockage of pipes or pumps (usually found through historical data); l) The system has a lower pump system efficiency index (see Appendix H); m) The valve is stuck or the recirculation valve is leaking; n) Sealing systems, especially high-temperature sealing systems that require cooling (see B.4.3); o) In a suitable location, the inlet lacks a screen. 5.3 Analysis of system function requirements The evaluation team should clarify the normal operating conditions of the system, as well as extreme and abnormal operating conditions, and understand the design and operation of the system. Limits, and how operating conditions are distributed over time. If there is no accurate operation record and the facility operator cannot provide the required information, the assessment team should perform a review of the system during certain time periods Perform continuous monitoring to establish the demand information of the system. 5.4 Determine system boundaries and system energy consumption requirements The evaluation team shall determine the system boundary and system energy consumption requirements of each pump system that undergoes level 2 and level 3 assessments. Note. If the subsystem is a part of a large facility system, the system boundary is very complicated, so before any measurement and calculation of this type of system, all We must first clarify the system boundary. 5.5 Information needed to evaluate the efficiency of the pump system 5.5.1 General After clarifying which pump systems need to be further evaluated, the information listed in 5.5.2~5.5.6 should be collected. The evaluation team shall determine the data required for each system to be evaluated. The evaluation team shall ensure that the design and implementation of the measurement plan are consistent, repeatable and reproducible. The measurement plan should follow the principles of safety, openness and reliability. The measurement plan should include measurement data used to calculate the annual energy consumption baseline of the pump system. The typical approach is to measure instantaneous flow, pressure, Electrical parameters, and determine the operating time of the system under different working conditions. In order to ensure the accuracy of the data, the data should be cross-checked. 5.5.2 Motor/drive information The original information data of the motor/drive device collected from the nameplate (if any) or the manufacturer's data manual should include. a) Power frequency; b) Specification (rated power); c) Rated speed; d) Rated voltage; e) Full load current (FLA) --- motor current under rated power; f) Motor power rating information; g) Nominal efficiency or efficiency class (if given); h) Type and characteristics; i) Drive type (e.g. variable frequency drive, belt drive, gear drive, direct connection); j) Historical records (such as original motors, re-wound motors, and replaced motors). 5.5.3 Pump information 5.5.3.1 Rotary power pump The nameplate information (if any) of the pump and all records in the file should be obtained. If the data obtained from the pump nameplate and the record file is inconsistent, it should be marked and mentioned in the subsequent system evaluation process. Required pump The information (if any) should include. a) The type and model of the pump; b) Manufacturer's name; c) serial number; d) Customer tag number; e) The number of pump stages; f) Drive type; g) Rated speed in revolutions per minute (r/min); h) Design point (flow and head); i) Impeller diameter (installation diameter and maximum diameter); j) Pump performance curve, including rated head, flow, power, efficiency and required NPSH (NPSHR) (if any); k) Maintenance records; l) Description of pump cavitation or backflow problems; m) Sealing system data. 5.5.3.2 Volume (PD) pump The nameplate information (if any) of the pump and all records in the file should be obtained. If the data obtained from the pump nameplate and the record file is inconsistent, it should be marked and mentioned in the subsequent system evaluation process. Required pump The information (if any) should include. a) The type and model of the pump. b) The name of the manufacturer. c) Serial number. d) Customer tag number. e) Pump description/model number. f) Rated parameters of the pump. 1) Rotation speed, the unit is revolutions per minute (r/min); 2) Pressure in bar (bar); Note. 1bar=0.1MPa. 3) Temperature in degrees Celsius (℃); 4) Power, in kilowatts (kW). g) System data (operating conditions). h) Pressure relief valve setting. i) Pump performance curve. j) Maintenance records. k) Description of pump cavitation, backflow or other operating problems. l) Sealing system. 5.5.4 Transport liquid characteristic information The liquid information should include. a) Liquid name; b) Dynamic viscosity; c) temperature; d) density; e) solid particles and their characteristics; f) The steam pressure under the operating pressure and temperature of the system; g) Percentage of free gas; h) danger; i) Flammability. 5.5.5 Detailed system data System data information should include. a) System layout. b) Abnormal operation status. c) Pipeline and instrument flow chart (PID chart). d) Pump control method. 1) Variable speed drive (VSD); 2) Throttle valve (valve opening, if any); 3) Bypass/return; 4) Start/stop; 5) Multiple pumps are connected in series or parallel, or work separately; 6) No control (the pump starts directly). For rotary power pumps, the following additional information should be collected. ---Static head and system curve; ---The effective NPSH (NPSHA); ---Load distribution. Through discussions with operators, the estimated operating time of the year, quarter, week, and day under different flow rates can be obtained. For volumetric (PD) pumps, the following additional information should be collected. ---Outlet pressure; ---Inlet pressure; --- Effective net positive suction pressure (NPIPA). When necessary, additional information such as the effective cavitation margin of the rotary power pump and the effective net positive suction pressure of the positive displacement pump should be collected. 5.5.6 Measurement data 5.5.6.1 Electrical data The required electrical data should include one of the following. ---Power (kW); ---The actual voltage, current and power factor used to calculate the power. 5.5.6.2 System operating data In order to determine where the energy consumption increases in the system, sufficient operating data should be collected during the assessment, which should include. ---The flo......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 39984-2021_English be delivered?

Answer: Upon your order, we will start to translate GB/T 39984-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 39984-2021_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 39984-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.