GB/T 38436-2019 English PDFUS$1559.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38436-2019: Engineering data handover specification for power transmission and transformation Status: Valid
Basic dataStandard ID: GB/T 38436-2019 (GB/T38436-2019)Description (Translated English): Engineering data handover specification for power transmission and transformation Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F29 Classification of International Standard: 29.240.20 Word Count Estimation: 78,778 Date of Issue: 2019-12-31 Date of Implementation: 2020-07-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 38436-2019: Engineering data handover specification for power transmission and transformation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. (Data transfer specifications for transmission and transformation engineering) ICS 29.240.20 F29 National Standards of People's Republic of China Data transfer specifications for transmission and transformation engineering 2019-12-31 release 2020-07-01 implementation State Administration of Market Supervision Published by the National Standardization Administration ContentsForeword I Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Data transfer 3 4.1 Overview 3 4.2 Handover Strategy 4 4.3 Transfer Requirements 4 4.4 Transition Plan 5 4.5 Implementation of the transfer plan 9 Appendix A (Normative Appendix) Data Transfer Contents and Requirements10 Appendix B (informative) Classification and reference model for data transfer content 65 Appendix C (Informative) Rules for Classification and Coding of Lists of Transferred Data 67 References 75ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some elements of this document may involve patents. The issuer of this document is not responsible for identifying these patents. This standard is proposed and managed by the China Electricity Enterprise Federation. This standard was drafted. State Grid Economic and Technological Research Institute Co., Ltd., CLP Power Development Research Institute Co., Ltd., Shenzhen Pengrui Information Technology Co., Ltd., China Southern Power Grid Co., Ltd., China Power Engineering Consulting Group Northeast Electric Power Design Institute Co., Ltd., Germany Xindongyuan Intelligent Technology (Beijing) Co., Ltd., State Grid Xinjiang Electric Power Co., Ltd. Economic and Technical Research Institute, State Grid Hunan Electric Power Co., Ltd., China Energy Construction Group Zhejiang Electric Power Design Institute Co., Ltd., China Energy Construction Group Anhui Electric Power Design Institute Co., Ltd., Beijing Zheng Energy Space Information Technology Co., Ltd., China Energy Construction Group Hunan Electric Power Design Institute Co., Ltd., China Energy Construction Group Jiangsu Provincial Power Power Design Institute Co., Ltd., China Power Engineering Consulting Group North China Electric Power Design Institute Co., Ltd., State Grid Hunan Electric Power Co., Ltd. Institute of Technology, Nanjing Institute of Technology, Southwest Jiaotong University. The main drafters of this standard. Yuan Zhaoxiang, Han Wenjun, Qi Lizhong, Zhu Yuhang, Mu Weiguang, Zhang Weiqun, Liang Bo, Wang Jungang, Zhong Weihua, Zhang Yaping, Song Lijun, Xu Liang, Yang Lina, Hu Junhui, Luo Zhongda, Lu Fei, Sun Xiaohu, Zhang Su, Zhang Jiyong, Guan Lan, Song Zhen, Xu Zhiqiang, Cheng Jin, Li Aosen, Yu Chunsheng, Chen Jianhua, Kuang Jiaoting, Wan Guoping, Xie Bin, Xu Zhihong, Xu Bangxin, Wang Zhiyi, Yu Miao, Wang Yanpeng, Wang Hongtao, Zhang Hanning, Liu Wanying, Zheng Yifei, Tao Ruiyu, Zhang Ruiyong, Yue Song, Wang Rui, Xu Liang, Zhao Dong.IntroductionIn recent years, with the popularization and application of information technology and the continuous enrichment of design methods, more and more companies are aware of information assets and entities Assets are equally important. Without effective engineering information assets, not only can the information system fail to make full use of the benefits, but the company cannot form effective knowledge. Knowledge accumulation and daily production activities have been greatly affected and restricted. Internationally, the International Organization for Standardization and industry organizations have developed some relevant standards and guidelines for data transfer, and have been To a wide range of applications. Domestic power grid companies attach great importance to digital design research and practical work, and have carried out a number of special research and engineering pilot work. Losing Innovated in the application and presentation of substation engineering data, compared with traditional transmission and transformation projects, There are breakthroughs in organic connection of stations, massive data support, three-dimensional design, and investment and cost savings. Data transfer is an important part of the owner's investment in transmission and transformation projects. The best way to achieve this is to establish a data "cooperation" environment as early as possible. According to the established data rules, the computer-processable and operation-maintenance data generated during the construction of the project and when it is completed and put into production are used. The data related to the operation of the power grid is transferred to the owner in a way that facilitates the implementation of the information system to achieve the data transfer. In order for the transmission and transformation project to reach a consensus during the data transfer process, standardize the data transfer method, and ensure that the project participants The plan implements data collection, storage, processing and transfer, and this standard is specially formulated. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38436-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 38436-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 38436-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38436-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |