GB/T 37400.7-2019 English PDFUS$228.00 ยท In stock
Delivery: <= 1 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37400.7-2019: Heavy mechanical general technical specification -- Part 7: Repair welding for steel castings Status: Valid
Basic dataStandard ID: GB/T 37400.7-2019 (GB/T37400.7-2019)Description (Translated English): Heavy mechanical general technical specification -- Part 7: Repair welding for steel castings Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: J31 Classification of International Standard: 77.140.80 Word Count Estimation: 14,166 Date of Issue: 2019-08-30 Date of Implementation: 2020-03-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 37400.7-2019: Heavy mechanical general technical specification -- Part 7: Repair welding for steel castings---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Heavy mechanical general technical specification - Part 7. Repair welding for steel castings ICS 77.140.80 J31 National Standards of People's Republic of China General technical conditions for heavy machinery Part 7. Repair welding of steel castings Part 7. Repairweldingforsteelcastings Published on.2019-08-30 2020-03-01 implementation State market supervision and administration China National Standardization Administration issued ContentForeword III 1 Scope 1 2 Normative references 1 3 repair welding defect range 1 4 Pre-weld preparation technical requirements 1 5 repair welding technical requirements 6 6 Post-weld stress relief annealing treatment 6 7 test 7 Appendix A (Normative Appendix) Supplementary Provision 8 Appendix B (Normative Appendix) Assessment of welds 9ForewordGB/T 37400 "General Technical Conditions for Heavy Machinery" is divided into 16 parts. --- Part 1. Product inspection; --- Part 2. Flame cutting parts; ---Part 3. Welded parts; ---Part 4. Cast iron parts; ---Part 5. Non-ferrous metal castings; ---Part 6. Steel castings; ---Part 7. Repair welding of steel castings; ---Part 8. Forgings; ---Part 9. Machining parts; --- Part 10. Assembly; --- Part 11. piping; --- Part 12. Painting; --- Part 13. Packaging; ---Part 14. Non-destructive testing of steel castings; ---Part 15. Non-destructive testing of forged steel parts; --- Part 16. Hydraulic system. This part is part 7 of GB/T 37400. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part was proposed by the China Machinery Industry Federation. This part is under the jurisdiction of the National Large-scale Casting and Forging Standardization Technical Committee (SAC/TC506) and the National Metallurgical Equipment Standardization Technical Committee. Will (SAC/TC409) deputy. This section drafted by. Shenyang Casting and Forging Industry Co., Ltd., Erzhong (Deyang) Heavy Equipment Co., Ltd., Taiyuan Heavy Machinery Group Engineering Technology Development Co., Ltd., Changzhou Baoling Heavy Industry Machinery Co., Ltd., Qinhuangdao Qinye Heavy Industry Co., Ltd., China Yizhong Group Co., Ltd., Heavy Group Dalian Engineering Technology Co., Ltd., China Heavy Machinery Research Institute Co., Ltd. The main drafters of this section. Yao Dayong, Yang Shuwen, Liu Hongsheng, Kang Wen, He Yang, Xie Junhu, Liang Yanbin, Kong Nianrong, Chen Xiaoguang, E Yongbo, Li Xuemin, Su Jing, Yan Ying, Zhu Guomin, Huang Jiarui, Wu Dongjun, Liu Zhen. General technical conditions for heavy machinery Part 7. Repair welding of steel castings1 ScopeThis part of GB/T 37400 stipulates the defect range of repair welding of steel castings, technical requirements for pre-weld preparation, technical requirements for repair welding, and after welding. Stress annealing treatment and inspection. This section applies to the repair welding of carbon steel, low alloy steel and high manganese steel casting steel parts before finishing.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 984 surfacing electrode GB/T 5117 non-alloy steel and fine-grain steel electrode GB/T 5118 heat-strength steel electrode GB/T 5680 austenitic manganese steel casting GB/T 6417.1 metal fusion welding head defect classification and description GB/T 8110 carbon steel, low alloy steel welding wire for gas shielded arc welding GB/T 10045 non-alloy steel and fine grain steel flux cored wire GB/T 15169 steel fusion welding welder skill assessment GB/T 17493 heat-strength steel flux cored wire GB/T 37400.6 General technical requirements for heavy machinery - Part 6. Steel castings JB/T 3223 Welding Material Quality Management Procedures JB/T 6404 large high manganese steel casting technical conditions NB/T 47014 Pressure welding equipment welding process evaluation3 repair welding defect range3.1 The scope of defects refers to defects that exceed the dimensional tolerances of the design drawings, exceed the allowable dimensions of the defects, and are not permitted. 3.2 Repairs that meet the following conditions shall not be repaired. a) sand holes, slag inclusions and looseness that cannot be removed; b) by machining, it can meet the technical requirements or allowable defects of the pattern; c) defects found in the process of processing that cannot meet the requirements of the product after repair welding; d) Defects other than repair welding are allowed after processing and the user does not agree with the defects of repair welding. 4 Pre-weld preparation technical requirements 4.1 Defect cleaning and groove form 4.1.1 The defects shall be thoroughly removed before repair welding, and the groove surface shall be smooth and smooth, and no sharp corners shall be present. 4.1.2 According to the defects of steel castings, the defects in the repair welding area can be shovel, grinding, carbon arc gouging, gas cutting or machining. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37400.7-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37400.7-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically in 24 hours. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 37400.7-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37400.7-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |