GB/T 35730-2017 English PDFUS$1239.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 35730-2017: General design requirements of pressurized water reactor nuclear power plants with passive safety systems Status: Valid
Basic dataStandard ID: GB/T 35730-2017 (GB/T35730-2017)Description (Translated English): General design requirements of pressurized water reactor nuclear power plants with passive safety systems Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F65 Classification of International Standard: 27.120.20 Word Count Estimation: 62,662 Date of Issue: 2017-12-29 Date of Implementation: 2018-07-01 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 35730-2017: General design requirements of pressurized water reactor nuclear power plants with passive safety systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. General design requirements of pressurized water reactor nuclear power plants with passive safety systems ICS 27.120.20 F65 National Standards of People's Republic of China General Design Requirements for PWR Nuclear Power Plants in Passive Safety Systems Published on.2017-12-29 2018-07-01 Implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration released Directory Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 4 5 Design goals and design principles 4 6 Overall Design Guidelines 10 7 Professional Design Guidelines 22 Appendix A (Informative Appendix) List of typical incidents/accidents under the design basis of a passive nuclear power plant 49 Appendix B (Informative Appendix) List of Typical Transient Conditions of a Non-active Nuclear Power Plant 52 Reference 55 ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by China National Nuclear Corporation. This standard is under the jurisdiction of the National Nuclear Energy Standardization Technical Committee (SAC/TC58). This standard was drafted by. Shanghai Nuclear Engineering Research and Design Institute Co., Ltd. The main drafters of this standard. Chen Song, Zhang Huaiyuan, Cao Yenan, Liu Xin, Lin Shaoqi, Shi Wei, Zhang Shuhui, Xing Xiaofeng, Luo Lanying. General Design Requirements for PWR Nuclear Power Plants in Passive Safety Systems1 ScopeThis standard specifies the design that should be satisfied in the design process of pressurized water reactor nuclear power plants (hereinafter referred to as “passive nuclear power plants”) for passive safety systems. Objectives, as well as design principles, overall design guidelines, and professional design guidelines to follow in order to achieve design goals. This standard applies to the design of passive nuclear power plants.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB 6249 Nuclear Power Plant Environmental Radiation Protection Regulations GB 11806 Safety Regulations for Radioactive Material Transportation GB/T 13286 Nuclear Power Plant Safety-Class Electrical Equipment and Circuit Independence Guidelines GB/T 13976 Radioactive source items under PWR nuclear power plant operating conditions GB 18871 Standard for ionizing radiation protection and radiation source safety GB 50009 Building structural load specification GB 50010 Design Specification for Concrete Structures GB 50011 Code for Seismic Design of Buildings GB 50017 Steel Design Specification GB 50267 Code for Seismic Design of Nuclear Power Plants EJ/T 1029 PWR Nuclear Fuel System Design Limits Emergency preparation and emergency response of HAD002/01 nuclear power operating organization HAD101/04 external man-made events for the selection of nuclear power plant site Determination of Design Flood of HAD101/08 Site of Binhe Nuclear Power Plant Determination of Design Baseline Flood of HAD101/09 Site of Coastal Nuclear Power Plant HAD102/05 External Man-made Events Related to Nuclear Power Plant Design HAD102/11 Nuclear Power Plant Fire Prevention Radiation Protection Design for HAD102/12 Nuclear Power Plant NB/T.20057.3 Reactor system design reactor core for pressurized water reactor nuclear power plant Part 3. Fuel assembly NB/T.20099 Analysis of reactor coolant loss accidents in PWR nuclear power plants NB/T 20251 Design Guidelines for Normal Air Purification Installations of Pressurized Water Reactor Nuclear Power Plants NB/T 20350 Quality Assurance Grading and Management Requirements for Design and Construction Stages of Non-active Nuclear Power Plants3 Terms and DefinitionsThe following terms and definitions apply to this document. 3.1 Passive system passivesystem Systems that rely on natural forces (such as gravity or natural circulation) or energy storage (such as batteries or compressed fluids) to perform functions. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 35730-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 35730-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 35730-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 35730-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |