Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 35707-2017 English PDF

US$1239.00 ยท In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 35707-2017: Guide for hydropower plant identification system
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 35707-20171239 Add to Cart 8 days Guide for hydropower plant identification system Valid

Similar standards

GB 36893   GB 35971   GB/T 35073   GB/T 45573   GB/T 45483   

Basic data

Standard ID: GB/T 35707-2017 (GB/T35707-2017)
Description (Translated English): Guide for hydropower plant identification system
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F04
Classification of International Standard: 27.140
Word Count Estimation: 62,655
Date of Issue: 2017-12-29
Date of Implementation: 2018-07-01
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 35707-2017: Guide for hydropower plant identification system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide for hydropower plant identification system ICS 27.140 F04 National Standards of People's Republic of China Hydroelectric power plant identification system coding guidelines Published on.2017-12-29 2018-07-01 Implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration released Directory Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Basic requirements 2 5 Process related identification 2 5.1 Identification Structure 2 5.2 Coding Character Type 3 5.3 Prefix 3 5.4 Factory code 3 5.5 System Code 3 5.6 Device Code 3 5.7 Part Number 4 5.8 Identification of each system and major equipment 4 6 Mounting Point Identification 4 6.1 Identification Structure 4 6.2 Coding Character Type 5 6.3 Prefix 5 6.4 Factory code 5 6.5 Installation Unit Number 5 6.6 Separator 5 6.7 Installation Space Code 5 7 Location ID 5 7.1 Identification Structure 5 7.2 Coding Character Type 6 7.3 Prefix 6 7.4 Factory code 6 7.5 Building (structure) building code 6 7.6 Room (District) Code 7 8 Labeling regulations 7 8.1 Label Format 7 8.2 Drawing Dimensions 7 8.3 On-site annotation 7 Appendix A (Normative) System Index 8 Appendix B (Normative Appendix) Equipment Index 15 Appendix C (Normative) Component Index 19 Appendix D (Normative Appendix) Identification of various systems and major equipment of hydropower plants 22 Appendix E (Normative Appendix) Building Index 51 Appendix F (Informative) Signal Status Indicators 53

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing agency of this document does not assume responsibility for identifying these patents. This standard is proposed and managed by the China Electricity Council. This standard was drafted by. Wuling Power Co., Ltd., State Power Investment Corporation, China Three Gorges Corporation, Hubei Qingjiang Water Electric Development Co., Ltd., China Yangtze Power Co., Ltd., Guangzhou Jianxin Science and Technology Co., Ltd., Tianshengqiao First-class Hydropower Development Limited liability company hydropower plant, Sichuan Meigu River Hydropower Development Co., Ltd., Guangdong Yuedian Fengshu Dam Power Generation Co., Ltd. The main drafters of this standard. Deng Zhihua, Yao Xiaoyan, Sun Zhijun, Yuan Rui, Tan Wensheng, Yuan Bing, Liu Qiang, Zeng Jianjun, Zhang Junjun, Zhang Zhenhua, Zhao Xunxin, Xiao Qizhi, Yu Chunze, Xu Jun, Liu Yong, Xu Lixia, Gao Shangzheng, Sun Gang, Cheng Zebin, Wang Guoliang, Deng Pengcheng, Xiao Fengming, Jiang Yongfu, Liu Guoquan, Zhu Zhenjun, Liu Taihong, Zhang Baoqing, Bo Hao, Sang Xingxu, Luo Bin, Sun Wei, Zhang Xueli, Wang Yuting, Cao Huafeng, Li Zhiwen, and Wei Senxiong. Hydroelectric power plant identification system coding guidelines

1 Scope

This standard specifies the basic requirements for the coding of conventional hydropower plant identification systems, and the format of process-related identification, installation identification, and location identification. And value requirements, labeling requirements, and identification of various systems and major equipment in hydropower plants. This standard applies to conventional hydropower plant engineering design, construction, operation and maintenance.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 50549 power plant identification system coding standard DL/T 5202 Electrical Energy Metering System Design Specification

3 Terms and Definitions

The following terms and definitions, as defined in ISO /IEC 14001, apply to this document. For ease of use, the following is a repeated list of GB/T 50549 Some of the terms and definitions. 3.1 Identification identification Unique identifiers are assigned to physical objects to distinguish them from other physical objects. [GB/T 50549-2010, definition 2.0.1] 3.2 Notation The process of recording the identification symbol or code on the media. [GB/T 50549-2010, definition 2.0.2] 3.3 Process-related identification According to the functions in the mechanical, electrical, civil engineering and other specialties, the code of the process-related systems and equipment is identified. 3.4 Installation point identification pointofinstalationidentification Identifies the code of the installation point of the electrical equipment in the installation unit (such as cabinet, tray, console). 3.5 Location identification locationidentification Identify the code for the layout of the rooms, plant grids or fire zones on each floor of the building under construction. 3.6 Unit unit The entire set of devices in a power plant that serves as the basic unit of electricity production. [GB/T 50549-2010, definition 2.0.6]
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 35707-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 35707-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 35707-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 35707-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.