GB/T 34229-2017 English PDFUS$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34229-2017: Coalbed methane well test method -- Drill stem testing method Status: Valid
Basic dataStandard ID: GB/T 34229-2017 (GB/T34229-2017)Description (Translated English): Coalbed methane well test method -- Drill stem testing method Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: D20 Classification of International Standard: 73.040 Word Count Estimation: 14,189 Date of Issue: 2017-09-07 Date of Implementation: 2018-04-01 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 34229-2017: Coalbed methane well test method -- Drill stem testing method---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Coalbed methane well test method - Drill stem testing method ICS 73.040 D20 National Standards of People's Republic of China Well test method for CBB well drilling rod formation test method 2017-09-07 Posted 2018-04-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Method Summary 2 5 equipment and meters 2 6 well test design 3 7 test program 5 8 data recording and collection 5 9 test data interpretation 6 10 Outcome Report 6 Appendix A (informative) Drilling process pressure gradient calculation table 8 Appendix B (Normative) Downhole test string records table 9 Appendix C (normative) field test data record table 10 ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by China Coal Industry Association. This standard by the National Coal Standardization Technical Committee (SAC/TC42) centralized. This standard drafting unit. China Coal Science and Technology Group Xi'an Research Institute Co., Ltd., Xi'an Petroleum University. The main drafters of this standard.Wang Yanlong, Yang Xinhui, Lin Jianeng, Liu Changyi, Li Yanjun. Well test method for CBB well drilling rod formation test method1 ScopeThis standard specifies the terms and definitions CBM wellbore formation test methods, methods, equipment and instruments, well test design, test procedures Sequence, data recording and collection, test data interpretation, results report. This standard applies to CBM exploration and development of well test.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 31537 CBM (coal mine gas) terms3 Terms and definitionsGB/T 31537 defined and the following terms and definitions apply to this document. For ease of use, the following list is repeated GB/T 31537 some of the terms and definitions. 3.1 Drill pipe formation test drilstemtest During drilling, drill pipe is used as a conduit for formation fluids to flow to the surface to test formation parameters. [GB/T 31537-2015, Definition 4.4.4] 3.2 Test the pressure difference between thetestpressuredifference ΔP Testing the initial flow pressure differential determines the ease of formation fluid flow. 3.3 Liquid cushion liquidcushion In order to avoid excessive pressure test, a certain height of fluid (water or drilling fluid) needs to be filled in the test string to balance the pressure drop. Liquid pre-filled in the column is called a liquid cushion. 3.4 Open well openwel Open the test valve to allow formation fluids to flow to the wellbore. 3.5 Open well time openweltime Open the test valve to allow formation fluids to flow to the wellbore for a sustained period of time. 3.6 Shut-in shut-in Close the test valve to allow formation pressure to recover. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34229-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34229-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 34229-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34229-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |