Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 32038-2015 PDF English

US$90.00 · In stock · Download in 9 seconds
GB/T 32038-2015: Monitoring and Testing Method for Energy Saving of Illumination Engineering
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 32038-201590 Add to Cart Auto, 9 seconds. Monitoring and Testing Method for Energy Saving of Illumination Engineering Valid

Similar standards

GB 32030   GB 32031   GB 32029   GB 32028   

GB/T 32038-2015: Monitoring and Testing Method for Energy Saving of Illumination Engineering

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT32038-2015
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.010 F 01 Monitoring and Testing Method for Energy Saving of Illumination Engineering Issued on: SEPTEMBER 11, 2015 Implemented on: APRIL 1, 2016 Issued by. General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of PRC.

Table of Contents

Foreword ... 3 1 Scope ... 4 2 Normative References ... 4 3 Terms and Definitions ... 4 4 General Requirements ... 5 5 Monitoring and Testing Contents ... 5 6 Monitoring and Testing Conditions and Equipments ... 6 7 Monitoring and Testing Methods ... 7 8 Monitoring and Testing Report ... 10 Appendix A (Informative) Monitoring and Testing Report for Energy Saving of Illumination Engineering ... 12

Foreword

This Standard was drafted as per the rules specified in GB/T 1.1-2009. This Standard was proposed by the National Technical Committee for Standardization of Energy Fundamentals and Management. This Standard shall be under the jurisdiction of Reasonable Electricity Utilization Technical Subcommittee of National Technical Committee for Standardization of Energy Fundamentals and Management (SAC/TC 20/SC 4). Drafting organizations of this Standard. China Academy of Building Research, China National Institute of Standardization, Architecture Design Institute of the General Logistics Department of PLA, State Grid Energy Conservation Service Co., Ltd., China Municipal Engineering Association City Illumination Professional Committee, Philips (China) Investment Co., Ltd., Guangxi Institute of Building Research and Design, Xiamen Institute of Measurement and Testing, Zhejiang New Century Engineering Testing Co., Ltd., Zhejiang Qiushi Information & Electronics Co., Ltd., Tianxuhengyuan Energy Technology Co., Ltd., Beijing Solar-One Energy Technology Co., Ltd., Dongguan Kingsun Optoelectronic Co., Ltd., and Zhejiang Jast Energy Technology Co., Ltd. Chief drafting staffs of this Standard. Zhu Hong, Zhao Yuejin, Luo Tao, Bing Shukui, Xu Chen, Mao Yuansen, Wang Shuxiao, Yao Mengming, Pang Yaoguo, Kang Pinchun, Gu Jianying, Fang Xiaochun, Wang Weiguo, Liang Zongxing, Yin Ruolan, Zhang Yutao, Wang Chunlin, and Chen Jianxin. Monitoring and Testing Method for Energy Saving of Illumination Engineering

1 Scope

This Standard specifies the monitoring and testing contents, technical requirements, monitoring, testing and assessing methods of monitoring and testing for energy saving of illumination engineering. This Standard is applicable to monitoring and testing for energy saving of newly-constructed, expanded and renovated indoor lighting engineering, outdoor workplace lighting engineering, urban road lighting engineering, and urban nightscape lighting engineering. The existing monitoring and testing for energy saving of illumination engineering can be implemented as per this Standard.

2 Normative References

The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this document. GB/T 5700 Measurement Methods for Lighting GB 50034 Standard for Lighting Design of Buildings GB 50582 Standard for Lighting Design of Outdoor Workplaces CJJ 45 Standard for Lighting Design of Urban Road JGJ/T 163 Code for Lighting Design of Urban Nightscape JJG 211 Verification Regulation of Luminance Meter JJG 245 Verification Regulation of Illuminance Meter

3 Terms and Definitions

The following terms and definitions are applicable to this document. State. 5.1.2 Illumination electricity shall meet the requirements of a separate measurement. 5.1.3 Illumination scene setting and switch lamp schedule shall conform to the design use requirements. 5.1.4 The situation of illumination power supply circuit accessing to other types of electrical equipments. 5.1.5 Imbalance situation of three-phase illumination line load. 5.2 Testing items 5.2.1 Electrical parameters of monitoring and testing for energy saving of illumination engineering include voltage, current, electric flux, power factor, power, harmonic current and other indicators. 5.2.2 When monitoring and testing the electrical parameters, the illuminance, luminance, uniformity ratio of illuminance, uniformity ratio of luminance and other illumination indicators shall be tested at the same time. 5.2.3 The geometry and reflectance ratio on the illumination site shall be tested.

6 Monitoring and Testing Conditions and Equipments

6.1 Monitoring and testing conditions 6.1.1 The illumination system starts totally, and operates normally for more than 0.5h. 6.1.2 No interference from natural light and other external light sources. 6.1.3 No significant shielding in the testing area. 6.1.4 The voltage on illumination circuit shall be no greater than 105% rated voltage, and no less than 90% rated voltage. 6.1.5 The damage or failure ratio of the illumination device shall not exceed 2%. 6.1.6 If the illumination system is equipped with power-saving device, the working conditions of which shall be indicated in the measurement conditions. 6.2 Monitoring and testing equipments 6.2.1 Monitoring and testing instruments shall be verified by the relevant state 7.1.3 The monitoring and testing for energy saving of nightscape illumination engineering shall conform to the following requirements. a) Single building and structure shall be monitored and tested entirely; while the group buildings shall select typical area for monitoring and testing; b) Open space shall select typical area for monitoring and testing. 7.2 Measurement of illumination indicators The calculation for measurement of illuminance, luminance, uniformity ratio of illuminance, and uniformity ratio of luminance in tested room (area) shall conform to the relevant provisions of GB/T 5700. 7.3 Measurement of electrical parameters 7.3.1 The measurement of electrical parameters shall be carried out at the switch of power supply circuit. 7.3.2 The measurement of total illumination power or electric flux shall be carried out in the following methods. a) When the power supply circuit is mixed with other electrical equipment, t hey shall be disconnected during the testing period; when other electrical equipment can’t be disconnected, measure the power or electric flux when all equipments are started or only non-illumination equipments are started; the difference between the two measurements shall be regarded as the power or electric flux of illumination system in the tested room and site. b) When the power supply circuit supplies power to the illumination system of several rooms and sites, the power or electric flux of the illumination system of each room and site can be obtained through the ratio between the illumination installing power and total power of the line multiplied by the circuit power or electric flux. c) When the above measurement method can’t be achieved, adopt single-lamp method to measure the power of single or group of luminaire in the tested room or site one by one; then add up them to calculate the total power and electric flux of the illumination system in the tested room or site. 7.4 Calculation of lighting power density The lighting power density (LPD) in a site or area can be calculated as per Formula (1) and (2). ... (1) ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 32038-2015 be delivered?Answer: The full copy PDF of English version of GB/T 32038-2015 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 32038-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32038-2015_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 32038-2015 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB/T 32038-2015?

A step-by-step guide to download PDF of GB/T 32038-2015_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 32038-2015".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9