Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 31455.6-2015 English PDF

US$699.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31455.6-2015: Intelligent system of bus rapid transit -- Part 6: Interface specifications between dispatch center and depot/platform control system
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 31455.6-2015699 Add to Cart 6 days Intelligent system of bus rapid transit -- Part 6: Interface specifications between dispatch center and depot/platform control system Valid

Similar standards

GB/T 31024.3   GB/T 31024.4   GB/T 31024.1   GB/T 31455.3   GB/T 31455.4   GB/T 31455.2   

Basic data

Standard ID: GB/T 31455.6-2015 (GB/T31455.6-2015)
Description (Translated English): Intelligent system of bus rapid transit -- Part 6: Interface specifications between dispatch center and depot/platform control system
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: L79
Classification of International Standard: 35.100.70; 35.240.60
Word Count Estimation: 33,346
Date of Issue: 2015-05-15
Date of Implementation: 2015-08-01
Quoted Standard: GB/T 31455.1-2015; GB/T 31455.2-2015; GB/T 31455.4-2015
Regulation (derived from): National Standard Announcement 2015 No. 15
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This Standard specifies the field between the dispatch center and the station platform control system architecture, interface specifications and inspection rules for data communications. This section applies to data communications between the dispatch center and the station platform control system.

GB/T 31455.6-2015: Intelligent system of bus rapid transit -- Part 6: Interface specifications between dispatch center and depot/platform control system


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Intelligent system of bus rapid transi Part 6. Interface specifications between dispatch center and depot/platform control system ICS 35.100.70; 35.240.60 L79 National Standards of People's Republic of China Bus Rapid Transit (BRT) Intelligent Systems Part 6. dispatch control center and the station platform Data communication system interface specification Part 6. Interfacespecificationsbetweendispatchcenter Issued on. 2015-05-15 2015-08-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Abbreviations 1 5 semantics and syntax 1 6 frame 1 7 message frame 5 8 Session 12 9 inspection rules 17 Appendix A (normative) the dispatch center with the station platform control system interface 19 data elements Index 29

Foreword

GB/T 31455 "Bus Rapid Transit (BRT) intelligent system" is divided into seven parts. --- Part 1. General technical requirements; --- Part 2. dispatch center system technical requirements; --- Part 3. vehicle information terminal and automotive peripherals technical requirements; --- Part 4. Field station platform control systems and peripheral equipment technical requirements; --- Part 5. dispatch center and vehicle information terminal data communications interface specification; --- Part 6. dispatch center and the station platform control system data communication interface specification; --- Part 7. bus priority traffic signal controller equipment and data communications interface specification. This section GB/T Part of 631,455. This section drafted in accordance with GB/T 1.1-2009 given rules. This part of the National Intelligent Transportation System Standardization Technical Committee (SAC/TC268) and focal points. Drafting this Part. Research Institute of Highway Ministry of Transport, Qingdao Hisense Network Technology Co., Ltd. Beijing in the cross-country wisdom Energy transport systems Technology Co., Ltd. Urumqi Municipal Public Security Bureau Traffic Police Detachment, integrated transport project research center of Urumqi city, Urumqi Public Transport Group. The main drafters of this section. Top Liu, Li Wei, Wu Feng Yan, Liu Fangdong, Wang Baoshan, Zhang Xiaoliang, three steel Mou, Wang Xinlei, Wan Jianlin, Janus pool, Liu, Zhang steady, Dujun Wei, Wan Si Jun, Wang Xiaokun, Zhou Zhongyuan, Yang Xiping, Cho Chang, Shaoxi Guo, He Hui, Zhang, Hong Xiaolong, Pan Yong. Bus Rapid Transit (BRT) Intelligent Systems Part 6. dispatch control center and the station platform Data communication system interface specification

1 Scope

This section GB/T 31455 specifies the dispatch center between the station platform and control system architecture data communications interface specification Fan and inspection rules. This section applies to data communication between the control center and the station platform control system.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 31455.1-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 1. General Technical Requirements GB/T 31455.2-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 2. Technical requirements dispatch center system GB/T 31455.4-2015 Bus Rapid Transit (BRT) Intelligent systems - Part 4. Field station platform control systems and peripheral equipment technology Claim

3 Terms and Definitions

GB/T 31455.1-2015 defined terms and definitions apply to this document.

4 Abbreviations

GB/T 31455.1-2015 defined abbreviations applicable to this document.

5 semantics and syntax

Semantics and syntax should be consistent with GB/T 31455.2-2015 7.1 requirements.

6 frames

6.1 System identification Identifier. DSTSystemIden Explanation. The system used to define the station platform, see Table 1.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31455.6-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31455.6-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31455.6-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31455.6-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.