Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 31052.5-2015 English PDF

US$489.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31052.5-2015: Lifting appliances -- Code of inspection and maintenance -- Part 5: Bridge and gantry cranes
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 31052.5-2015489 Add to Cart 4 days Lifting appliances -- Code of inspection and maintenance -- Part 5: Bridge and gantry cranes Valid

Similar standards

GB/T 35975   GB/T 24818.4   GB/T 33082   GB/T 31052.4   GB/T 31052.12   GB/T 31052.2   

Basic data

Standard ID: GB/T 31052.5-2015 (GB/T31052.5-2015)
Description (Translated English): Lifting appliances -- Code of inspection and maintenance -- Part 5: Bridge and gantry cranes
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: J80
Classification of International Standard: 53.020.20
Word Count Estimation: 23,280
Date of Issue: 2015-12-10
Date of Implementation: 2016-07-01
Regulation (derived from): National Standard Announcement 2015 No.38
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 31052.5-2015: Lifting appliances -- Code of inspection and maintenance -- Part 5: Bridge and gantry cranes


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Lifting appliances - Code of inspection and maintenance - Part 5. Bridge and gantry cranes ICS 53.020.20 J80 National Standards of People's Republic of China Crane inspection and maintenance procedures Part 5. Bridge and gantry cranes Part 5. Bridgeandgantrycranes Issued on. 2015-12-10 2016-07-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 1 General requirements 5 Check 1 6 Maintenance 2 Safety Precautions 7 Inspection and Maintenance 3 Appendix A (normative) daily and periodic inspection programs, methods, content and requirements 4 Appendix B (normative) special inspection items, methods, content and requirements 13 Annex C (informative) Inspection Report 15 Annex D (informative) Maintenance Record 16 References 17

Foreword

GB/T 31052 "crane inspection and maintenance procedures" is divided into 12 sections. --- Part 1. General; --- Part 2. Mobile cranes; --- Part 3. Tower cranes; --- Part 4. jib cranes; --- Part 5. Bridge and gantry crane; --- Part 6. cable cranes; --- Part 7. Mast Crane; --- Part 8. Railway Crane; --- Part 9. Lifts; --- Part 10. small light lifting equipment; --- Part 11. Mechanical parking equipment; --- Part 12. floating crane. This section GB/T Part of 531,052. This section drafted in accordance with GB/T 1.1-2009 given rules. This part is proposed by China Machinery Industry Federation. This part of the National Standardization Technical Committee crane (SAC/TC227) centralized. This section is responsible for drafting unit. Shanghai Diprospan Heavy Machinery Engineering (Group) Co., Ltd., Beijing Institute of lifting the transport machinery design, country House lifting the transport machinery for Quality Supervision and Inspection Center. Participated in the drafting of this section. Shanghai Zhenhua Heavy Industry (Group) Co., Ltd., Dalian Huarui Heavy Industry Group Co., Ltd., De Grid crane (Shanghai) Co., Ltd, Konecranes (Shanghai) Co., Ltd., Ningbo City convex Heavy Industries Co., Ltd., Dalian Heavy Bory Engineering Co., Weihua Group Co., Ltd., Wuhan Bridge Heavy Industries Group Co., Ltd., Zhengzhou generous new Heavy Industries Ltd., Nanjing Hoisting Machinery Factory Co., Ltd., Tianjin Lifting Equipment Co., Ltd., Beijing million bridge Industrial Machinery Co., Ltd. Qingdao Port International Port Machine Branch, Xinxiang City, lifting equipment factory limited liability company Hoisting Machinery Plant in Jiangxi Province, Wuxi Huadong Heavy Machinery Co., Ltd., Jiangsu Huacheng Heavy Industry Co., Ltd., Jiangsu three horse Lifting Machinery Manufacturing Co., Ltd. Heilongjiang Fujin Fu Crane. The main drafters of this section. Taohua Jiang, Chen Fuquan, Chenrui Ming, Lin Fukui, new Zhu Ao, Lv Xinmin shall be mine, Xie Wei, Feng Shihai, Zhao Xueming, Liuyuan Li, Sun Mingyao, Xie Jun, Chen Hao, Wang Lee, A Critical Review, Yuan Fu Chun, even Wang, Liu Chuan He, Liu Xiaosheng, Zhang Lun, Wang Zhigang, Xu Zhihong, Zhang Xuefeng. Crane inspection and maintenance procedures Part 5. Bridge and gantry cranes

1 Scope

GB/T 31052 provisions of this part of the basic bridge and gantry cranes should be carried out in the course of inspection and maintenance of the Claim. This section applies to GB/T 31052.1-2014 specified in Annex A bridge and gantry cranes (hereinafter referred to as "Crane").

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 5972 crane wire rope maintenance, maintenance, installation, examination and discard GB 6067.1-2010 crane safety regulations - Part 1. General GB/T 10051.2 lifting hook - Part 2. Forged hook technical conditions GB/T 10051.3 lifting hooks - Part 3. Forged hook in check GB/T 10051.13 crampons - Part 13. Laminated hook technical conditions GB/T 10051.14 crampons - Part 14. Laminated hook in check GB 26469-2011 erecting machine safety regulations GB/T 31052.1-2014 crane inspection and maintenance procedures - Part 1. General

3 Terms and Definitions

GB/T 31052.1-2014 defined terms and definitions apply to this document.

4 General requirements

General requirements for inspection and maintenance should be consistent with the provisions of GB/T 31052.1-2014 in Chapter 4.

5 Check

5.1 Daily Inspection Shall determine the daily inspection items and inspection requirements according to the specific characteristics of each crane and should not be less than the specified in Appendix A of. 5.2 Periodic inspection According to the characteristics of the crane used to determine the periodic inspection period weekly inspection, monthly inspection, quarterly inspection and annual inspection. According to the working level of each crane, the working environment and the use of periodic checks to determine the status of the project, inspection requirements and inspection cycle, not Appendix A should be lower than the specified. For crane lifting the molten metal and other dangerous goods, should be appropriate to shorten the examination period.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31052.5-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31052.5-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31052.5-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31052.5-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.