Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 30469-2013 English PDF

US$149.00 ยท In stock
Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 30469-2013: Technical specifications for operation of seedbed irrigation and sowing
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 30469-2013149 Add to Cart 2 days Technical specifications for operation of seedbed irrigation and sowing Valid

Similar standards

GB/T 24674   GB/T 33006   GB/T 25409   GB/T 45789   GB/T 30467   GB/T 30466   

Basic data

Standard ID: GB/T 30469-2013 (GB/T30469-2013)
Description (Translated English): Technical specifications for operation of seedbed irrigation and sowing
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: B91
Classification of International Standard: 65.060.30
Word Count Estimation: 5,568
Quoted Standard: GB 5084-2005; GB/T 25404; NY/T 1143-2006
Regulation (derived from): National Standards Bulletin 2013 No. 27
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the operating conditions applied water seeding machinery, job preparation, job and safety requirements. This standard applies to Walking applying water saving irrigation machine planting operations.

GB/T 30469-2013: Technical specifications for operation of seedbed irrigation and sowing

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specifications for operation of seedbed irrigation and sowing ICS 65.060.30 B91 National Standards of People's Republic of China Watering Seed Drill job specification Issued on. 2013-12-31 2014-10-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China Machinery Industry Federation. This standard by the National Standardization Technical Committee (SAC/TC201) Agricultural machinery centralized. This standard was drafted. China Agricultural University. The main drafters of this standard. Pang Changle, Zhang Shumin. Watering Seed Drill job specification

1 Scope

This standard specifies the operating conditions applied to water sowing machines, job preparation, work and safety requirements. This standard applies to walking - type irrigation water applied seeding machine.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 5084-2005 irrigation water quality standards GB/T 25404 propelled water-saving irrigation machine NY/T 1143-2006 planter quality evaluation of technical specifications

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Watering Planter seedbedirrigationandsowingmachine Tractors and other powered, configure the onboard water tank, a complete trenching, double work tools applied water, planting, soil and other functions. 3.2 Of water supply seedbedirrigationyield Basis of the amount of water into the soil.

4 operating conditions

4.1 Job Lot soil moisture should be less than 12%, the slope should be less than 5%. Job Lot 4.2 should be subject to land preparation, tillage depth should meet the agronomic requirements of mechanical seeding. 4.3 selected in line with the requirements of local agronomic seed, seed treatment necessary to impurities, mixed seed coating agent or the like. Quality 4.4 Watering planting should meet the requirements of 3.1 in GB 5084-2005, should land near water operations. 4.5 Watering Planter should be consistent with GB T 25404 NY/T requirements and/1143-2006 Chapter 3. 4.6 should be equipped with water carts, water should meet Watering Planter continuous operation water requirements. 4.7 workers should be subject to regular operation, maintenance and technical training. Tractor driver should have a tractor driver's license.

5 job preparation

5.1 planter should conduct a comprehensive inspection, adjustment and maintenance, to ensure compliance with the technical state of the job requirements. 5.2 tractor should be adjusted, to maintain the normal operation condition. Airborne tanks, water pipes should be cleaned. 5.3 pairs planter and tractor mounted debug should ensure connections are secure, and reliable.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 30469-2013_English be delivered?

Answer: Upon your order, we will start to translate GB/T 30469-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 30469-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 30469-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.