Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 30423-2013 English PDF

US$1354.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 30423-2013: System tests for high-voltage direct current (HVDC) installations
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 30423-20131354 Add to Cart 5 days System tests for high-voltage direct current (HVDC) installations Valid

Similar standards

GB/T 19212.5   GB/T 10228   GB/T 25095   GB/T 16896.3   GB/T 31104   GB/T 16896.1   

Basic data

Standard ID: GB/T 30423-2013 (GB/T30423-2013)
Description (Translated English): System tests for high-voltage direct current (HVDC) installations
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K40
Classification of International Standard: 29.240.01
Word Count Estimation: 68,642
Quoted Standard: GB/T 13498; IEC/TR 60919-1; IEC 61000-4-3; IEC/TR 60919-2-2008
Adopted Standard: IEC 61975-2010, IDT
Regulation (derived from): National Standards Bulletin 2013 No. 27
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard applies to high-voltage direct current transmission side by side and were connected with the AC system (HVDC) system test facilities. For back to back systems, testing requirements and acceptance criteria shall be agreed, and multiport syste

GB/T 30423-2013: System tests for high-voltage direct current (HVDC) installations

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
System tests for high-voltage direct current (HVDC) installations ICS 29.240.01 K40 National Standards of People's Republic of China HVDC system test facility Systemtestsforhigh-voltagedirectcurrent (HVDC) instalations (IEC 61975.2010, High-voltagedirectcurrent (HVDC) instalations- Systemtests, IDT) Issued on. 2013-12-31 2014-07-13 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 3.1 Test Category 1 3.2 operating status 2 4 Overview 2 4.1 Objective 2 3 Structure 4.2 HVDC system Structure 4.3 Control and Protection System 4 4.4 System Test logical step 4 5 Structure 4.5 System Test 4.6 field test preparation 5 5 Converter Station Test 7 5.1 Overview 7 5.2 inverter unit test 8 5.3 Reactive charging unit 9 5.4 Wiring DC converter 10 5.5 Electromagnetic Compatibility 11 5.6 Trip Test 12 5.7 Open Test 13 5.8 14 back to back test 5.9 short circuit (zero power) Test 15 6 Transmission Test 16 6.1 Low Power Transmission Test 16 6.2 Operator Control mode switching 22 6.3 Wiring DC converter 27 6.4 the main circuit switching device 30 6.5 Dynamic Performance Test 33 6.6 AC and DC systems segmentation fault 41 6.7 communications, auxiliary equipment missing or redundant 44 6.8 High Power Transmission Test 47 6.9 Acceptance Test 51 7 Commissioning 56 7.1 Overview 56 7.2 Test object 56 7.3 Test conditions before 56 7.4 Test Procedure 57 7.5 test acceptance criteria 57 8 system test plans and documents 57 8.1 Overview 57 8.2 Plant documentation and operating manuals 57 8.3 System studies and technical specifications 57 8.4 Inspection and testing plan 58 8.5 System Test Procedure 58 8.6 Test procedure of the trial 58 8.7 System test result file 59 8.8 deviation report 59

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard uses the translation method identical with IEC 61975.2010 "HVDC system test facilities." Correspondence between the consistency of the standards of international documents and normative references of the following documents. --- GB/T 17626.3-2006 Electromagnetic compatibility - Testing and measurement techniques RFEMS test (IEC 61000-4-3.2002, IDT) --- GB /Z20996.1-2007 HVDC transmission system performance - Part 1. Steady State (IEC /T R60919-1. 1988, IDT) --- GB /Z20996.2-2007 HVDC transmission system performance - Part 2. Faults and switching (IEC /T R60919-2. 1991, IDT) The standard proposed by China Electrical Equipment Industrial Association. This standard by the National Standardization Technical Committee on Electronic electrodynamic (SAC/TC60) centralized. This standard was drafted. Xi'an High Voltage Apparatus Research Institute Co., Ltd., China Southern Power Grid Co., Ltd. Research Institute, China Electric Force Research Institute, Beijing Network of DC Engineering Ltd., XJ FACTS Corporation, China Southern Power Grid Co., Ltd. EHV transmission company, Nanjing NARI-RELAYS Electric Co., Ltd., Xi'an Electric Power Systems Ltd., Xi'an Institute of Power Electronics, State Grid Electric Power Research Institute, TBEA Co., Ltd., Kunming Electric Institute of Science. The main drafters of this standard. Gou Ruifeng Yang Yu, Ma Weimin, around, Xiao-Hui Yang, Chen Wo, Tian Enwen, Cao Jifeng Chen Huan, Zhou Ye, Ge Liang, Wei red, Kang Wenbin, Wang Jian, Wang Haijun, Huoli Hai, Zhou Qiongfang, Zhaoyong Tao. HVDC system test facility

1 Scope

This standard specifies the test is based on the sending end and the receiving end are connected to the AC system consisting of two-way and bipolar high voltage direct current (HVDC) system. This standard applies to high-voltage direct current transmission side and the receiving end are connected to the AC system (HVDC) system test facilities. For back to back System, test requirements and acceptance criteria should be agreed and multi-terminal systems and the voltage source converter is not included in this standard. For unipolar high voltage Direct current (HVDC) systems, in addition to the bipolar test, this standard applies. This standard does not include specific project proposed for the pilot project to verify additional special functions or features, according to technical specifications increase. This standard is only as a guide HVDC system test facility, to guide the user how to develop the commissioning program. The test described in this standard Not necessarily apply to all projects, but should be considered as a test range. Therefore, the proposed construction of each party priorities established in accordance with this standard test program, but clearly ahead of the participating units (such as. user, Tasks supplier, manufacturer, operating personnel and the purchaser, etc.) between/liability trials.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 13498 HVDC term (GB/T 13498-2007, IEC 60633.1998, IDT) IEC /T R60919-1 performance has line-commutated HVDC converter systems - Part 1. Steady State (Performanceof high-voltagedirectcurrent (HVDC) systemswithlinecommutatedconverters-Part 1. Steady-state conditions) IEC /T R60919-2.2008 with a performance of line-commutated HVDC converter systems - Part 2. Faults and switching (Performanceofhigh-voltagedirectcurrent (HVDC) systemswithlinecommutatedconverters- Part 2. Faultsandswitching) IEC 61000-4-3 Electromagnetic compatibility (EMC) Part 4-3. Testing and measurement techniques RFEMS test (Electromagneticcompatibility (EMC) -Part 4-3. Testingandmeasurementtechniques-Radiated, radio-frequency, electromagneticfieldimmunitytest)

3 Terms and Definitions

GB/T 13498 and defined by the following terms and definitions apply to this document. 3.1 Test Category 3.1.1 Station test stationtest Inverter system test, and validation tests have been charged in the converter station status of each device features. 3.1.2 System Test systemtest Verify HVDC (HVDC) systems and test AC system connected thereto interaction functions and features.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 30423-2013_English be delivered?

Answer: Upon your order, we will start to translate GB/T 30423-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 30423-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 30423-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.