GB/T 29789-2013 English PDFUS$714.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29789-2013: Radiation protection instrumentation -- Equipment for sampling and monitoring radioactive noble gases Status: Valid
Basic dataStandard ID: GB/T 29789-2013 (GB/T29789-2013)Description (Translated English): Radiation protection instrumentation -- Equipment for sampling and monitoring radioactive noble gases Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F84 Classification of International Standard: 13.280 Word Count Estimation: 36,374 Quoted Standard: GB/T 2900.81-2008; GB/T 7165.1-2005; GB/T 7165.3-2008; GB/T 16511-1996; GB 17799.4-2012; IEC 60068-1; IEC 60068-2-1; IEC 60068-2-2; IEC 60068-2-5; IEC 60068-2-6; IEC 60068-2-10; IEC 60068-2-14; IEC 60068-2-20; IEC 60068-2-21; IEC 60068-2-27; IEC 60068-2-3 Adopted Standard: IEC 62302-2007; IDT Regulation (derived from): National Standards Bulletin No. 21 of 2013 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard applies to: the workplace, emissions into the environment gaseous effluents and the environment itself radioactive noble gas sampling and continuous measurement equipment. Regulations is a continuous and real-time monitoring measurement proc GB/T 29789-2013: Radiation protection instrumentation -- Equipment for sampling and monitoring radioactive noble gases---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Radiation protection instrumentation. Equipment for sampling and monitoring radioactive noble gases ICS 13.280 F84 National Standards of People's Republic of China Radiation protection instrumentation radioactive noble gas sampling and Monitoring equipment (IEC 62302.2007, IDT) Issued on. 2013-10-10 2014-02-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 2 Category 4 noble gas monitoring equipment 5 4.1 General Design Elements 6 The ability to run tests 6 4.2 4.3 Adjustment and maintenance tools 6 4.4 means the noise level 6 4.5 Electromagnetic Interference 7 4.6 Mechanical Shock 7 4.7 Measurement Features 7 5 7 Equipment Parts 5.1 Overview 7 5.2 sampling device 7 5.3 detection means 9 5.4 the control device 9 5.5 indication means 9 5.6 alarm device 10 5.7 Check the source and the end of the work source 10 5.8 Environment The bottom shield or compensation means 10 10 5.9 Battery 6 11 test conditions 11 6.1 General test methods Test under standard test conditions of 6.2 (for normal operating conditions) 11 11 6.3 Test with the impact of changes in the amount of 6.4 emergency working conditions tests carried out 11 11 6.5 Source Category Metrology accreditation system during the test 12 6.6 7 12 radiation detection performance test 7.1 Reference Response 12 13 7.2 Linear Response 7.3 pairs of inert gases other than radioactive gas 13 7.4 Response Time 13 7.5 pairs in response to environmental γ radiation 14 7.6 pairs of neutron radiation response of 14 7.7 overload test 15 7.8 statistical fluctuation 15 15 7.9 zero stability 7.10 response reproducibility 16 8 electrical, electronic and mechanical tests 16 8.1 alarm threshold range 16 17 8.2 Alarm Threshold stability Equipment failure alarm system 8.3 17 8.4 Warm-up time - detection and measurement devices 18 18 8.5 Power Changes 8.6 Battery Test 18 19 8.7 Effect of power supply transients 9 air performance test circuit 19 9.1 Overview 19 Sensitivity 9.2 gas hold 19 Accuracy 9.3 volume and flow measurement 20 9.4 20 flow stability 9.5 Filter Pressure Drop 20 9.6 Effect of the supply voltage of 21 traffic 9.7 Effect of power frequency traffic 21 10 21 Environmental Performance Test 10.1 Ambient temperature 21 Temperature 10.2 portable and mobile devices Shock 22 10.3 Relative humidity 22 10.4 atmospheric pressure 22 10.5 seal 23 10.6 Mechanical Shock 23 10.7 external electromagnetic and electrostatic discharge immunity 23 10.8 Electromagnetic emission 24 11 type test reports and certificates 24 12 Operation and Maintenance Manual 24 Preparation of Appendix A (normative) radioactive gas reference source 28ForewordThis standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard uses the translation method identical with IEC 62302.2007 "Radiation protection instrumentation radioactive noble gas sampling and monitoring equipment." Consistency correspondence with international standards in this standard references of the following documents. --- GB/T 2423 (all parts), Environmental testing [IEC 60068 (all parts)]. ● GB/T 2423.5-1995 Environmental testing for electric and electronic products Part 2. Test methods Test Ea and guidance. red Hit (IEC 60068-2-27. 1987, IDT); ● GB/T 2423.34-2005 Environmental testing for electric and electronic products Part 2. Test methods - Test Z/AD. Wen Degrees/humidity cyclic test (IEC 60068-2-38. 1974, IDT). --- GB/T 17626 (all parts), electromagnetic compatibility test and measurement technology [61000-4 (all parts) IEC ] ● GB/T 17626.2-2006 Electromagnetic compatibility - Testing and measurement techniques - Electrostatic discharge immunity test (IEC 61000- 4-2.2001, IDT); ● GB/T 17626.3-2006 Electromagnetic compatibility - Testing and measurement techniques RFEMS test (IEC 61000-4-3.2002, IDT); ● GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test (IEC 61000-4-4.2004, IDT); ● GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test (IEC 61000-4-5.2005, IDT); ● GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations Immunity test (IEC 61000-4-11.2004, IDT); ● GB/T 17626.12-1998 electromagnetic compatibility test and measurement techniques - Oscillatory waves immunity test (IEC 61000-4- 12.1995, IDT). --- GB 17799.4-2001 Electromagnetic compatibility - Generic standards Emission standard for industrial environments (IEC 61000-6-4.1997, IDT). The standard IEC 62302.2007 made the following editorial changes. --- Will be in "2 Normative references" existing national standards and industry standards relevant international standards to our criteria, taking To the practical application of the standard to IEC 61000-4 (all parts) and IEC 61000-6-4 instead of IEC 61000 (all parts); --- 3.18 "Maintenance Test" by definition should be "periodic tests"; --- 4.7 in the first paragraph delete "is also used by other units in the United States"; --- 8.6,9.7, Tables 3 and 4 AC power frequency range to retain only the contents of the current use of 47Hz ~ 51Hz; --- 9.3.2 of "2%" add "(k = 2)"; --- 10.8.2 of IEC 61000-4-2 (electrostatic discharge immunity test) clearly erroneous and should be changed to IEC 61000-6-4; --- Table 3, "AC voltage" terms of reference "7.3" is a clerical error changed to "8.5." The standard proposed by the Defense Science and Technology Industrial Development Bureau. This standard by the National Nuclear Instrument Standardization Technical Committee (SAC/TC30) centralized. This standard was drafted. Shenzhen Academy of Metrology and Quality Inspection, Shenzhen University. The main drafters of this standard. Katherine Lee name, Ji Zhen, Liu Tiedong, YANG Bing Wang, Liu Qinghui, Zheng Xiuyu, wheat Xiuping. Radiation protection instrumentation radioactive noble gas sampling and Monitoring equipment1 ScopeThis standard applies to the workplace, released into the environment in gaseous effluents and the environment itself radioactive noble gas sampling And continuous measurement devices. Monitoring requirements is a continuous and real-time measurement process. This standard includes the sampling process or for real retrospective Laboratory analysis of samples of the acquisition process. The purpose of this standard is necessary to establish general requirements for radioactive noble gases given sampling and monitoring feasible method and apparatus for real example. This standard is the current standard GB/T 7165.3-2008 complete expansion, which applies only in gaseous effluents can be permanently installed Portable and removable radioactive noble gas sampling and monitoring equipment, and expand the coverage of this standard to include monitoring radioactive noble gases All situations can cause radiological hazards. Device is designed in normal operating conditions and in emergency conditions (including accidents and incidents during After) working. According to the characteristics of emergency conditions, you may need to install specially designed for normal operating conditions and equipment earmarked for emergency workers Other equipment condition design. This standard applies to provide the following functionality radioactive noble gas sampler and monitor. --- In the workplace, gaseous emissions and environmental point of discharge flow measuring radioactive noble gas, the volume of activity and over time Variety; --- During normal operating conditions and in emergency conditions (including accident and post-accident period) were measured; --- When the concentration exceeds a preset volume or activity or preset total emission activity, start the alarm; --- To determine the total activity of the gas emissions within a given time range provided different exhaust gas mixture composition information and (or); --- Air or gas sampling and retrospective analysis of an inert gas. Containing the isotope 219Rn, 220Rn and 222Rn radon is a naturally occurring radioactive noble gases, this standard does not consider the measure it. The presence of radon and its progeny may significantly interfere with the correct measurement of the standard covered by an inert gas. This standard specifies the general characteristics of the device, general test methods, mechanical properties, electrical and electronic properties, radiation characteristics, security features, and Environmental characteristics and the proper identification and a certificate. If the device as part of a continuous nuclear facilities radiation monitoring central control system, may Those systems have additional requirements and other relevant standards.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2900.81-2008 Electrotechnical terminology Nuclear Instruments Physical phenomena and basic concepts (IEC 60050-393.2003, IDT) GB/T 7165.1-2005 gaseous effluents (radioactive) activity continuous monitoring equipment - Part 1. General requirements (IEC 60761- 1.2002, IDT) GB/T 7165.3-2008 gaseous effluents (radioactive) activity continuous monitoring equipment - Part 3. radioactive noble gas monitoring Specific requirements (IEC 60761-3.2002, IDT) GB/T 16511-1996 Electrical and electronic measuring equipment - Documentation (IEC 61187.1993, IDT) GB 17799.4-2012 Electromagnetic compatibility - Generic emission standard for industrial environments (IEC 61000-6-4.2011, IDT) IEC 60068 (all parts), Environmental testing (Environmentaltesting) IEC 61000-4 (all parts) electromagnetic compatibility (EMC) Part 4. Testing and measurement techniques (Electromagneticcom- ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29789-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 29789-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 29789-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29789-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |