GB/T 29549.1-2023 English PDFUS$629.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29549.1-2023: Specification for offshore modular drilling rigs on fixed platforms - Part 1: Design Status: Valid GB/T 29549.1: Historical versions
Basic dataStandard ID: GB/T 29549.1-2023 (GB/T29549.1-2023)Description (Translated English): Specification for offshore modular drilling rigs on fixed platforms - Part 1: Design Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: E92 Classification of International Standard: 75.180.10 Word Count Estimation: 31,326 Date of Issue: 2023-11-27 Date of Implementation: 2024-06-01 Older Standard (superseded by this standard): GB/T 29549.1-2013 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 29549.1-2023: Specification for offshore modular drilling rigs on fixed platforms - Part 1: Design---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 75:180:10 CCSE92 National Standards of People's Republic of China Replace GB/T 29549:1-2013 Offshore oil fixed platform module drilling rig Part 1: Design Part 1:Design Published on 2023-11-27 2024-06-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration Committee Table of contentsPreface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 2 5 Basic requirements and parameters 3 5:1 Basic requirements 3 5:2 Basic parameters 3 6 Module division and arrangement 5 6:1 Module division 5 6:2 Module layout 5 7 Module Design 5 7:1 General 5 7:2 Drilling Equipment System Module (DES) 6 7:3 Drilling Support System Module (DSM) 9 7:4 Bulk tank module (P-Tank) 13 7:5 Cementing module, logging module, logging module, directional well module 14 7:6 Structural design 14 7:7 Auxiliary systems 18 8 Platform interface 19 8:1 General layout 19 8:2 Security interface 19 8:3 Public system interface 19 8:4 Electrical interface 20 8:5 Instrument communication interface 20 8:6 Well Control System 20 8:7 Structural interface 20 Appendix A (informative) Typical layout diagram of modular drilling rig 21 Reference 25ForewordThis document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents" Drafting: This document is Part 1 of GB/T 29549 "Modular Drilling Rig for Fixed Offshore Oil Platforms": GB/T 29549 has released the following part: ---Part 1: Design; ---Part 2: Construction; ---Part 3: Offshore installation, commissioning and acceptance: This document replaces GB/T 29549:1-2013 "Offshore oil fixed platform module drilling rig Part 1: Design" and is consistent with GB/T 29549:1- Compared with:2013, in addition to structural adjustments and editorial changes, the main technical changes are as follows: a) The winch rated power in Table 1 has been changed (see 5:2, 4:2 of the:2013 edition); b) Changed the description of module layout (see 6:2, 5:2 of the:2013 version); c) Changed the list of typical materials submitted by each major (see 7:1:14, 6:1:11 of the:2013 version); d) Changed the letter code description of formula (4) and changed Figure 1 (see 7:2:2, 6:2:2 of the:2013 version); e) Changed some errors in formula (6) (see 7:3:2:1:1, 6:3:2:1:1 of the:2013 version); f) Changed the calculation method of drilling fluid tank volume (see 7:3:2:2, 6:3:2:2 of the:2013 edition); g) Changed the load rate of drilling rig equipment under various working conditions in Table 4 (see 7:3:2:3, 6:3:2:3 of the:2013 edition); h) The specific layout requirements of P-Tank have been changed (see 7:4:1, 6:4:1:1 of the:2013 version); i) Added technical requirements for flatbed truck shipping (see 7:6:5:3:2); j) The maximum stress ratio of important components has been changed (see 7:6:7:1, 6:6:8:1 of the:2013 version): Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents: This document is proposed and coordinated by the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96): This document was drafted by: CNOOC Research Institute Co:, Ltd:, PetroChina Exploration and Development Research Institute, Baoji Petroleum Machinery Co:, Ltd:, Nanyang Erji Petroleum Equipment Group Co:, Ltd:, CNPC National Oil and Gas Drilling Equipment Engineering Technology Research Research Center Co:, Ltd:, Sinopec Siji Petroleum Machinery Co:, Ltd: The main drafters of this document: Yang Xiangqian, Guo Hua, Zhou Chao, Zheng Qinghua, Zhang Fu, Zhang Yu, Wang Weixu, He Junguo, Wang Chunchun, and Lu Xian: The previous versions of this document and the documents it replaces are as follows: ---First published as GB/T 29549:1-2013 in:2013; ---This is the first revision:IntroductionGB/T 29549 aims to determine the generally applicable basis for the design, construction, offshore installation, commissioning and acceptance of offshore fixed platform module drilling rigs: this requirement: It is planned to consist of three parts: ---Part 1: Design: The purpose is to establish the basic requirements and parameters of modular drilling rig design, module division and layout, and module design: As well as the requirements for the interface between the module drilling rig and the platform where it is located: ---Part 2: Construction: The purpose is to establish the requirements for modular drilling rig structure, pipelines, outfitting manufacturing and equipment installation and commissioning: ---Part 3: Offshore installation, commissioning and acceptance: The purpose is to establish the system for offshore hoisting of modular drilling rigs and installation of offshore equipment: Requirements for connection, system commissioning and acceptance: GB/T 29549:1 was first released in:2013: This revision mainly combines the actual application of this document in recent years and changes some clauses: Modifications and improvements have been made, and the following principles have been adhered to during the revision process: a) In accordance with the existing laws and regulations of the country, combined with the current status of relevant international and domestic national standards and enterprise standards, ensure the safety and safety of drilling rig operations: Efficient and environmentally friendly: b) The preparation focuses on the current status of domestic modular drilling rigs to ensure that the modular drilling rigs designed in accordance with this document operate safely, efficiently and reliably: It is reliable and can also be adapted to the overall processing and construction level of the domestic offshore oil industry: c) This document combines my country’s years of experience in offshore oil fixed platform module drilling rig design, and is based on a methodological standard to strictly Specification requirements, and highlights the characteristics of modular drilling rigs on offshore oil fixed platforms that are easy to transport, install and use: This time repair The order mainly combines the specific construction experience in recent years such as flatbed truck loading and drilling fluid tank volume requirements, and supplements the original practice: and perfection: Offshore oil fixed platform module drilling rig Part 1: Design1 ScopeThis document specifies the basic requirements and parameters, module divisions and Layout, module design and platform interface requirements: This document applies to the design of modular drilling rigs:2 Normative reference documentsThe contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to this document: GB/T 3836:1 Explosive atmosphere Part 1: General requirements for equipment GB 4914 Pollutant emission concentration limits for offshore oil exploration and development GB/T 8423:5 Oil and gas industry terminology Part 5: Equipment and materials GB 18420:1 Biological toxicity of pollutants in offshore oil exploration and development Part 1: Classification GB/T 25428 Oil and gas industrial drilling and production equipment drilling and workover derricks and bases GB/T 31049 Top drive drilling device for oil and gas drilling equipment GB 50370 Design specifications for gas fire extinguishing systems SY/T 6671 Recommended practices for classification of Class I electrical equipment sites in petroleum facilities, Zone 0, Zone 1 and Zone 2 SY/T 6962 Configuration and installation requirements for well control system of offshore drilling equipment SY/T 10030 Recommended practices for planning, design and construction of fixed offshore platforms - Working stress design method3 Terms and definitionsThe terms and definitions defined in GB/T 8423:5 and the following apply to this document: 3:1 modular drilling rig modulardrilingrig It is an assembled offshore drilling rig with a modular structure placed on the deck of an offshore oil fixed platform: Note: It consists of drilling equipment system module, drilling support system module, bulk tank module, cementing module, logging module and logging module: 3:2 Drilling equipment system module drillingequipmentset Equipment and structures placed on the deck of an offshore oil fixed platform to realize lifting and rotating functions during drilling operations: Note: It consists of derrick, base, winch, crane, traveling block, top drive (hook, faucet), turntable, blowout preventer, driller's room and drilling floor equipment: 3:3 Drilling support system module drillingsupportmodule Equipment and structures placed on the deck of an offshore oil fixed platform to provide operational support for drilling rigs: ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29549.1-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 29549.1-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 29549.1-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29549.1-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 29549.1-2023?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 29549.1-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |