Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 29177-2012 English PDF

US$259.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 29177-2012: Fire emergency rescue -- Requirements for training facilities
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 29177-2012259 Add to Cart 3 days Fire emergency rescue -- Requirements for training facilities Valid

Similar standards

GB 4066   GB/T 26784   GA 578   GB/T 29176   GB/T 29178   GB/T 29175   

Basic data

Standard ID: GB/T 29177-2012 (GB/T29177-2012)
Description (Translated English): Fire emergency rescue -- Requirements for training facilities
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: C83
Classification of International Standard: 13.220.10
Word Count Estimation: 11,193
Quoted Standard: GB/T 5907; GB/T 29176; JTG B01
Regulation (derived from): National Standards Bulletin 2012 No. 41; National Standards Commission recently released 16 national standards for fire protection
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the fire emergency rescue training facilities, terms and definitions, construction principles, composition, settings and requirements. This standard applies to full-time fire brigade brigades and fire emergency rescue training faci

GB/T 29177-2012: Fire emergency rescue -- Requirements for training facilities

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Fire emergency rescue. Requirements for training facilities ICS 13.220.10 C83 National Standards of People's Republic of China Fire emergency rescue training facility requirements Issued on. 2012-12-31 2013-10-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by the People's Republic of China Ministry of Public Security. This standard by the National Standardization Technical Committee fire fighting and rescue Technical Committee (SAC/TC113/SC10) centralized. This standard was drafted. Shanghai Fire Research Institute of Ministry of Public Security. The main drafters of this standard. Cao Yongqiang, Wang Zhian, Nguyen Zhen, Weihan Dong, Xue Lin, Zhu Qing, Zhang Lei, Gao Ning Yu, Chen Yongsheng, Meng Qinggang, Zhang Guoli, Miao country code, Guohui, Shi Wei, Zhao Yihui. This standard is the first release.

Introduction

China's "Fire Act" provides that. public security fire brigade and the fire brigade to assume full-time major disasters and other rescue personnel in accordance with national regulations Life-based emergency rescue work. According to relevant regulations of the State Council, the public security fire department is mainly responsible for earthquakes and other natural disasters, construction matter Therefore, road traffic accidents, crash and other production safety accidents, terrorist attacks, the people in distress and other rescue mission social security incidents, as well as co Help professional teams do about floods and droughts, meteorological, geological disasters, forest and grassland fires, biological hazards, accidents in mines, dangerous chemicals business Therefore, water accidents, environmental pollution, nuclear and radiation accidents, public health emergencies such as rescue missions. Emergency rescue the national standards mainly for public security fire brigade and the fire brigade to assume full-time natural disasters, production safety accident And social safety incidents and other emergency rescue mission, and the current public security fire brigade and the fire brigade actual full-time commitment hazardous chemical accidents, water Disaster, storms, landslides, water accidents, collapse of buildings and other rescue tasks developed with the aim to clarify the emergency rescue of the fire Like, with specification fire emergency rescue equipment, training facilities, technical training, operating procedures and personnel qualifications, etc. The contents of this standard is to require fire emergency rescue training facilities, training facilities composed with GB/T 29176 "Fire Emergency Rescue General "Fire emergency rescue technology type listed based on various types of training facilities and GB/T 29175" Fire Emergency Rescue Training Practice guide "in the corresponding technical training requirements. Fire emergency rescue training facility requirements

1 Scope

This standard specifies the terms and definitions fire emergency rescue training facilities, the construction principle, composition, settings and requirements. This standard applies to full-time public security fire brigade and fire brigade fire emergency rescue training facilities, fire brigade and other emergency rescue teams May refer to.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 5907 fire first part basic terms GB/T 29176 General Emergency Rescue JTGB 01 highway engineering standard

3 Terms and Definitions

GB/T 5907 and GB/T 29176 and as defined in the following terms and definitions apply to this document. 3.1 Fire emergency rescue training facilities trainingfacilityforfireemergencyrescue Used for fire emergency rescue training and teaching all the farm area, buildings, installations and equipment in general.

4 construction principles

4.1 Rational Principle Fire emergency rescue training facility (hereinafter referred to as training facilities) should be based on local conditions, unified planning, rational setting. 4.2 Applicability Principles Construction of training facilities should meet the actual needs of the local fire emergency rescue, to meet the utility requirement emergency rescue training mission. 4.3 general principles Construction of training facilities should take full account of reasonable supporting the use of capital, land and equipment, equipment and other resources, and to meet emergency rescue training Based on the comprehensive consideration of firefighting training and other functions. 4.4 Security Principles Training facilities should comply with national safety regulations and to take the necessary technical measures to ensure the safe and reliable operation training.

5 Composition and settings

Composition and set up training facilities shall comply with the requirements of Table 1.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 29177-2012_English be delivered?

Answer: Upon your order, we will start to translate GB/T 29177-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 29177-2012_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 29177-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.