Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 29076-2021 English PDF

US$359.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 29076-2021: Execution requirements of quality problem closed loop for aerospace product
Status: Valid

GB/T 29076: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 29076-2021359 Add to Cart 4 days Execution requirements of quality problem closed loop for aerospace product Valid
GB/T 29076-2012160 Add to Cart Auto, < 3 mins Execution requirements for quality problem close loop of aerospace product Obsolete

Similar standards

GB/T 38905   GB/T 38239   GB/T 36249   GB/T 29073   GB/T 29072   

Basic data

Standard ID: GB/T 29076-2021 (GB/T29076-2021)
Description (Translated English): Execution requirements of quality problem closed loop for aerospace product
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: V00
Word Count Estimation: 18,158
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 29076-2021: Execution requirements of quality problem closed loop for aerospace product

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Execution requirements of quality problem closed loop for aerospace product ICS 03.120.10 CCSV00 National Standards of People's Republic of China Replace GB/T 29076-2012 Implementation requirements for zeroing the quality problems of aerospace products (ISO 18238.2015, Spacesystems- Released on 2021-08-20 2022-03-01 implementation State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee

Table of contents

Foreword Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General requirements 3 4.1 Principle 3 4.2 Zero scope of quality problems 3 4.3 Responsibility 4 4.4 Management requirements 4 5 Procedure for resetting quality problems 4 5.1 Overall Procedure 4 5.2 Problem report 4 5.3 Take emergency measures 5 5.4 Building a team 5 5.5 Carry out technology zeroing 5 5.6 Carry out management to zero 5 5.7 Completing the zero report of quality problems 5 5.8 Zero review 6 5.9 Disbanding the team 6 6 Technical zeroing work requirements 6 6.1 Problem location 6 6.2 Mechanism analysis 6 6.3 Carrying out reproducibility test 7 6.4 Corrections and corrective actions 7 6.5 Learn from analogy 8 7 Management Zeroing Work Requirements 8 7.1 Process of finding the problem 8 7.2 Identifying responsibilities 8 7.3 Take measures 8 7.4 Dealing with problems 9 7.5 Improving regulations and standards 9 Appendix A (Normative) Main content of "Quality Problem Zeroing Report" 10 Appendix B (informative) Cover format of "Quality Problem Zeroing Report" 13

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. This document replaces GB/T 29076-2012 "Aerospace Product Quality Problem Zeroing Implementation Requirements", compared with GB/T 29076-2012, In addition to editorial changes, the main technical changes are as follows. ---Changed the description of the scope (see Chapter 1, Chapter 1 of the.2012 edition); ---Added the definition of the terms "root cause" and "root cause analysis" (see 3.16, 3.17); --- Changed the definition of the term "quality problem to zero" and "repetitive quality problem" (see 3.1, 3.14, 3.1, 3.14 of the.2012 edition); --- Increased the scope of technology zeroing "causing cost, schedule, efficiency or system application degradation quality problems" (see 4.2); ---Added the general requirements in Chapter 4 about carrying out product-oriented, process-oriented, and organization-oriented analysis, which is difficult to completely return to zero. Make plans, reviews, key nodes and other requirements (see 4.1.4, 4.1.7, 4.4.1, 4.4.2, 4.4.3); ---Added the quality problem report before and after the formal implementation of the quality problem to zero, emergency treatment, establishment and dissolution of the team, etc. Procedure (see 5.2, 5.3, 5.4, 5.8, 5.9); ---Added the work requirements for technical zeroing and management zeroing (see Chapter 6 and Chapter 7); ---Added the main content of the technical zeroing report and management zeroing report (see Appendix A). This document is drafted with reference to ISO 18238.2015 "Management of the Resolution of Closed-loop Problems in Space Systems", and the degree of consistency is non-equivalent. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed and managed by the National Aerospace Technology and Application Standardization Technical Committee (SAC/TC425). Drafting organizations of this document. China Aerospace Standardization Institute, China Aerospace Science and Technology Corporation, China Academy of Launch Vehicle Technology. The main drafters of this document. Yi Beiyu, Yang Zhaojun, Li Sheng, Xia Xiaochun, Bao Zhiwen, Lu Xin, Jia Chunfeng, Wang Yuming. The previous versions of this document and the documents replaced are as follows. --- First published as GB/T 29076-2012 in December.2012; ---This is the first revision.

Introduction

The zeroing of quality problems is a closed-loop management method of quality problems with Chinese aerospace characteristics summarized in the practice of aerospace engineering. It provides a set of systematic and scientific procedures and methods for completely eliminating quality hidden dangers, solving quality problems and avoiding the recurrence of problems. Quality question The problem of zeroing has been successfully practiced in aerospace. Through the implementation of quality problem zeroing, the problem can be accurately located, and the origin of the problem can be analyzed in depth. Causes and mechanisms, effectively identify the weak links of quality management, improve management, optimize processes, and improve product quality and reliability. It has been eight years since GB/T 29076-2012 was released and implemented. During this period, the zeroing of quality problems has played an increasingly important role in the quality control of aerospace products. Important role. With the increase in space missions, the rapid increase in the number of collaborative supporting products and suppliers, and the vigorous development of commercial aerospace The application of quality problem zeroing in the aerospace field continues to deepen, and the connotation of quality problem zeroing continues to expand. At the same time, the International Organization for Standardization ISO 18238.2015 "Management of closed-loop problem solving in space systems" was released in.2015, and there are certain amendments to GB/T 29076 Reference meaning. In view of this, it is indeed necessary to revise and improve GB/T 29076 to meet the new requirements of aerospace product quality management and promote aerospace products New experience of zeroing quality problems, unified and standardized implementation procedures and requirements for zeroing quality problems. Implementation requirements for zeroing the quality problems of aerospace products

1 Scope

This document specifies the general requirements, procedures, technical zeroing work requirements and management zeroing work requirements for aerospace product quality problems. content. This document is applicable to the zeroing of quality problems in various stages of aerospace product design, production, testing, and use.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to This document. GB/T 19000 Quality Management System Foundation and Terminology

3 Terms and definitions

The following terms and definitions defined in GB/T 19000 apply to this document. 3.1 Quality problem zero qualityproblemclosedloop For quality problems that have occurred, analyze the causes and mechanisms of technology and management, and take corrective and preventive measures to fundamentally Eliminate problems and avoid recurring activities. Note 1.The zeroing of quality problems is divided into technical zeroing and management zeroing, sometimes referred to as "double five points" zeroing. Note 2.Quality problems include malfunctions, defects, accidents and other undesirable situations. 3.2 Technologyclosedloop In response to the quality problems that occur, technically follow the five requirements of "accurate positioning, clear mechanism, recurring problems, effective measures, and inferences from one another". Seek to implement item by item, and form the activity of technical zeroing report, related technical documents and certification materials. 3.3 Accurate location Determine the exact location where the quality problem occurred. Note. Accurate positioning is to find out which link, which product, which component, which part, which electronic component or which component the problem occurs in, and confirm Determine the abnormal status and basic reasons of the lowest-level faulty products that occur in the quality problems. 3.4 The mechanism is clear clearlocation Determine the root cause of quality problems by means of analysis, calculation or experiment. Note. A clear mechanism is the key to ensure that the quality problem is completely zeroed out, sort out the causal relationship between the problem and the cause, support and prove the correctness of the cause of the problem, Provide a basis for formulating measures. 3.5 Problemrepetition Through experiments or other verification methods, the quality problems that have occurred are reproduced, and the accuracy of the positioning and the correctness of the mechanism analysis are confirmed.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 29076-2021_English be delivered?

Answer: Upon your order, we will start to translate GB/T 29076-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 29076-2021_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 29076-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 29076-2021?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 29076-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.