GB/T 28814-2012 English PDFUS$299.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28814-2012: The guide for composition of the ±800kV converter station operating code Status: Valid
Basic dataStandard ID: GB/T 28814-2012 (GB/T28814-2012)Description (Translated English): The guide for composition of the ��800kV converter station operating code Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K40 Classification of International Standard: 29.240.10 Word Count Estimation: 13,199 Quoted Standard: GB/T 2900.50; GB/T 2900.57; GB/T 2900.59; GB/T 13498; GB/Z 14429-2005; DL/T 800 Regulation (derived from): National Standards Bulletin 2012 No. 28 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the �� 800kV and below voltage converter station operating procedures prepared by the format, content and requirements. This standard applies to �� 800 kV and below voltage converter station operating procedures of preparation, appro GB/T 28814-2012: The guide for composition of the ±800kV converter station operating code---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.ICS29.240.10 K40 National Standards of People's Republic of China ± 800kV converter station operating procedures Establishment Regulations Theguideforcompositionofthe ± 800kVconverterstation operatingcode Issued on. 2013-02-01 2012-11-05 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ 1 Scope 1 2 Normative references 1 3 Contents 1 Main operating procedures 4 operating procedures managed 8ForewordThis standard rule according to GB/T 1.1-2009 given draft. The standard proposed by China Electricity Council. This standard by the National Standardization Technical Committee HVDC project (SAC/TC324) centralized. Drafting of this standard. National Grid Corporation of running branch. The main drafters of this standard. Lou Dianjiang, Yuke Wu, Tang Kaiping, SHE vibration ball, Cheng Jiong, Sun wash where, Hukai Jun, Sun Peng, Li Jing, Ningbo. ± 800kV converter station operating procedures Establishment Regulations1 ScopeThis standard specifies the ± 800kV and below voltage converter station operating procedures written in the format, content and requirements. This standard applies to ± 800kV and below voltage converter station operating procedures for preparation, approval and management.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated edition applies to this article Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2900.50 Electrotechnical terminology Generation, transmission and distribution of generic terms GB/T 2900.57 Electrotechnical terminology Generation, transmission and distribution operations GB/T 2900.59 Electrotechnical terminology Generation, transmission and distribution substations GB/T 13498 HVDC term GB /Z14429-2005 Telecontrol equipment and systems - Part 1-3. General term DL/T800 Power Standard Rules for the Enterprise3 operating procedures main content3.1 Equipment Overview Location and nature of the converter stations, establishment date and the date of the previous expansion, the development process, the master device wiring, converter capacity, change Capacity, reactive power compensation capacity, the inlet and outlet of each loop and voltage levels sent by the relationship between the grid and the like. 3.1.1 Equipment Overview 3.1.1.1 Circuit Breaker Breaker structure models, the main accessories, installation location, the date of commissioning, equipment manufacturers; breaker main technical parameters and instructions. 3.1.1.2 disconnector (earthing switch) Disconnector (earthing switch) structure models, the main accessories, installation location, the date of commissioning, equipment manufacturers; disconnector (earthing switch) TECHNOLOGY Specifications and operation instructions. 3.1.1.3 Current Transformer Current transformer structure models, the main accessories, installation location, the date of commissioning, equipment manufacturers; main technical parameters and current transformers Instructions. 3.1.1.4 voltage transformer (DC voltage divider) Voltage transformer (DC voltage divider) structure models, the main accessories, installation location, the date of commissioning, equipment manufacturers; voltage transformer (DC Divider) technical specifications and instructions. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28814-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 28814-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 28814-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28814-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |