GB/T 28688-2012 English PDFUS$209.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28688-2012: Low pressure die casting machine -- Technical requirements Status: Valid
Basic dataStandard ID: GB/T 28688-2012 (GB/T28688-2012)Description (Translated English): Low pressure die casting machine -- Technical requirements Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: J61 Classification of International Standard: 25.120.30 Word Count Estimation: 9,917 Quoted Standard: GB/T 191; GB/T 1184-1996; GB/T 3766; GB 5226.1; GB/T 7932; GB/T 9969; GB/T 13306; GB/T 14039-2002; GB/T 17421.1; GB 20905; GB/T 25371; GB/T 25711-2010; JB/T 5365.2; JB/T 8356.1; JB/T 8356.2 Regulation (derived from): National Standards Bulletin No. 24 of 2012 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the technical requirements for low-pressure casting machine, test methods, inspection rules, marking, packaging, storage and transportation. This standard applies to low-pressure casting method to produce aluminum castings low pres GB/T 28688-2012: Low pressure die casting machine -- Technical requirements---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.ICS25.120.30 J61 National Standards of People's Republic of China Low pressure casting machine technical conditions Issued on. 2013-01-01 2012-09-03 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordThis standard rule according to GB/T 1.1-2009 given draft. The standard proposed by China Machinery Industry Federation. This standard by the National Foundry Machinery Standardization Technical Committee (SAC/TC186) centralized. This standard was drafted. Jinan Foundry and Metalforming Machinery Research Institute Co., Ltd., Zhejiang Wanfeng Technology Co., Ltd. Huarong Tianshui Foundry Machinery Limited. The main drafters of this standard. Jing Kang Yue, Lu Jun, Ding Supei, water Zhang Yong, Li Jianping. Low pressure casting machine technical conditions1 ScopeThis standard specifies the technical requirements for low-pressure casting machine, testing methods, inspection rules, marking, packaging, storage and transportation. This standard applies to low-pressure casting method for the production of aluminum castings low pressure casting machine (hereinafter referred to as casting machine).2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated edition applies to this article Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 191 Packing and storage Fig flag GB/T 1184-1996 shape and position tolerances without individual tolerance value GB/T 3766 General technical conditions for hydraulic systems GB 5226.1 mechanical and electrical safety of machinery - Electrical equipment - Part 1. General requirements GB/T 7932 General technical condition of pneumatic systems GB/T 9969 General Industrial Product Manual GB/T 13306 signage GB/T 14039-2002 Hydraulic fluid level of contamination by solid particles GB/T 17421.1 General machine testing - Part 1. under no-load or finishing conditions Geometric accuracy of machines Foundry machinery - Safety requirements GB 20905 GB/T 25371 casting machinery noise level measurement method GB/T 25711-2010 casting machinery - General requirements JB/T5365.2 casting machinery cleanliness measurement method microscopy JB/T8356.1 and technical conditions Packaging Machine JB/T8356.2 tool box3 Terms and DefinitionsThis standard uses the following terms and definitions. 3.1 Pressure rate pressure-increasingrate In the low-pressure casting process, stalk, filling and booster stages than the gas pressure increase the amount of their time in a holding furnace. 3.2 Stalk pressure liquid-level-increasingpressure In the low-pressure casting process, molten metal stalk tube rises to the gate, holding furnace desired pressure. 3.3 Filling pressure fil-inpressure In the low-pressure casting process, the mold is filled with liquid metal, the pressure required in the holding furnace. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28688-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 28688-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 28688-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28688-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |