GB/T 28681-2012 English PDFUS$139.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28681-2012: Technical regulation of postharvest handling on bulbs of lily, calla and gladiolus Status: Valid
Basic dataStandard ID: GB/T 28681-2012 (GB/T28681-2012)Description (Translated English): Technical regulation of postharvest handling on bulbs of lily, calla and gladiolus Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: B62 Classification of International Standard: 65.020.20 Word Count Estimation: 6,613 Quoted Standard: GB/T 18247.6 Regulation (derived from): National Standards Bulletin No. 24 of 2012 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the lily (Lilium spp.), Calla (Zantedeschia spp.) And gladiolus (Gladiolus hybridus) bulbs harvesting, pre-treatment, grading, packaging, labeling and storage technology requirements. This standard applies to lily, calla lily and g GB/T 28681-2012: Technical regulation of postharvest handling on bulbs of lily, calla and gladiolus---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS65.020.20 B62 National Standards of People's Republic of China Lily, calla lily, gladiolus bulbs after harvest handling Technical specification Technicalregulationofpostharvesthandlingonbulbsoflily, calaandgladiolus Issued on. 2012-11-01 2012-09-03 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordThis standard rule according to GB/T 1.1-2009 given draft. This standard was proposed by the State Forestry Administration. This standard by the National Standardization Technical Committee Flowers (SAC/TC282) centralized. This standard was drafted. the Ministry of Agriculture Flowers Product Quality Supervision and Testing Center (Kunming), quality standards and inspection Yunnan Academy of Agricultural Sciences Measurement Technology Institute, Flower Research Institute, Yunnan Academy of Agricultural Sciences, Yunnan Flower Engineering Technology Research Center, focused on real Yunnan Flower Breeding Laboratory. The main drafters of this standard. Wang Li flower, Qusu Ping, Wuxue Wei, Tang school, and sunflower, Zhang Cheng, Xu Bo. Lily, calla lily, gladiolus bulbs after harvest handling Technical specification1 ScopeThis standard specifies the lily (Liliumspp.), Calla (Zantedeschiaspp.) Gladioli (Gladiolushybridus) bulb Harvesting, pre-processing, grading, packaging, labeling and storage technology requirements. This standard applies to lily, calla lily and gladiolus bulbs production and trade.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated edition applies to this article Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 18247.6 main floral products Level - Part 6. flower bulbs3 Terms and DefinitionsThe following terms and definitions apply to this document. 3.1 Harvest time harvestingtime Bulb shape or physical development to be harvested after a certain period of maturity. 3.2 Precooling precooling The former storage transport ball through the cool and ventilated, cold storage and other measures to cool down for some time to process a predetermined temperature. 3.3 Cormels bulbs Asexual reproduction for young bulbs used.4 Harvest4.1 harvest time Bulbs completed one growing season, the growth of state requirements in Appendix A and choose sunny harvest. 4.2 recovery methods Excavation tool to dig deep and promptly clean up the soil, into a clean, smooth inner, inner edge of the flat container to avoid mechanical damage and sun exposure Drying. Specific requirements in Appendix A. 4.3 Pre-treatment After digging through the pre-cooling, cleaning, drying, radio, to the complex and inferior to the pre-treatment step. Specific requirements in Appendix A. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28681-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 28681-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 28681-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28681-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |