Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 28620-2012 PDF English

US$90.00 · In stock · Download in 9 seconds
GB/T 28620-2012: The calculating methods of remanufacturing rate
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 28620-201290 Add to Cart Auto, 9 seconds. The calculating methods of remanufacturing rate Valid

Similar standards

GB/T 35980   GB/T 28784.2   GB/T 28619   GB/T 36111   

GB/T 28620-2012: The calculating methods of remanufacturing rate

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT28620-2012
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 25.010 J 01 The calculating methods of remanufacturing rate ISSUED ON: JUNE 29, 2012 IMPLEMENTED ON: DECEMBER 01, 2012 Issued by: General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the People’s Republic of China.

Table of Contents

Foreword ... 3 1 Scope ... 4 2 Normative references ... 4 3 Terms and definitions ... 4 4 Calculating methods of remanufacturing rate ... 5

Foreword

This Standard is drafted in accordance with the rules given in GB/T 1.1-2009. This Standard was proposed and shall be under the jurisdiction of National Technical Committee on Green Manufacturing Technology of Standardization Administration of China (SAC/TC 337). Drafting organizations of this Standard: Equipment Remanufacturing Technology Key Laboratory of National Defense Science and Technology, Hefei University of Technology, XCMG Engineering Machinery Co., Ltd., Sinotruk Group Jinan Fuqiang Power Co., Ltd., China Machine Productivity Promotion Center, Foshan Shunde District Quality Technology Supervision Institute of Standards and Coding, China National Institute of Standardization, Shanghai Entry-Exit Inspection and Quarantine Bureau of the People’s Republic of China. Main drafters of this Standard: Xu Binshi, Liu Bohai, Zhang Wei, Shi Peijing, Xi Daoyun, Yan Lijuan, Wu Jiawei, Zhang Xiufen, Luo Jianming, Huang Tie, Ouyang Dan, Li Junsheng, Zhou Xinyuan, Wang Wenyu, Liu Yun, Wang Xiuteng, Wu Yiwen. The calculating methods of remanufacturing rate

1 Scope

This Standard specifies the calculation methods of remanufacturing rate. This Standard applies to products that are remanufactured in China.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 28619-2012 Remanufacturing - Terminology

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 remanufacturing rate The percentage of the sum of quantity, the sum of weight and the sum of value of qualified remanufactured parts obtained after remanufacturing production and processing of a unit of remanufactured blanks TO the total quantity, the total weight and the total value of the corresponding products. They are called quantity remanufacturing rate, quality remanufacturing rate and value remanufacturing rate, respectively. [GB/T 28619-2012, definition 2.29] 3.2 output remanufacturing rate The ratio of the output of remanufactured products per unit time (such as month, year, etc.) to the total output of all products (including non-remanufactured products) produced by the manufacturer. 3.3 ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 28620-2012 be delivered?Answer: The full copy PDF of English version of GB/T 28620-2012 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 28620-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28620-2012_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 28620-2012 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB/T 28620-2012?

A step-by-step guide to download PDF of GB/T 28620-2012_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 28620-2012".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9