GB/T 28473.2-2012 English PDFUS$279.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28473.2-2012: Temperature transmitters for use in industrial-process measure and control systems -- Part 2: Methods of evaluating the performance Status: Valid
Basic dataStandard ID: GB/T 28473.2-2012 (GB/T28473.2-2012)Description (Translated English): Temperature transmitters for use in industrial-process measure and control systems -- Part 2: Methods of evaluating the performance Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N11 Classification of International Standard: 25.040.40 Word Count Estimation: 12,180 Quoted Standard: GB/T 2423.10-2008; GB/T 2828.1-2003; GB 4793.1-2007; GB/T 4798.2-2008; GB/T 16511-1996; GB/T 17614.1-2008; GB/T 17626.2-2006; GB/T 17626.3-2006; GB/T 17626.4-2008; GB/T 17626.5-2008; GB/T 17626.8-2006; GB/T 18271.1-2000; GB/T 18271.2-2000; GB/T 18271.3-20 Regulation (derived from): National Standards Bulletin No. 13 of 2012 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the criteria to meet the requirements in Part 1 of the industrial process measurement and control systems with a temperature transmitter (hereinafter referred to as the transmitter) performance evaluation methods and inspection rul GB/T 28473.2-2012: Temperature transmitters for use in industrial-process measure and control systems -- Part 2: Methods of evaluating the performance---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Temperature transmitters for use in industrial-process measure and control systems Part 2. Methods of evaluating the performance ICS 25.040.40 N11 National Standards of People's Republic of China Industrial process measurement and control systems temperature transmitter Part 2. Methods for performance evaluation systems-Part 2. Methodsofevaluatingtheperformance Issued on. 2012-06-29 2012-11-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordGB/T 28473 "industrial process measurement and control systems temperature transmitter" is divided into two parts. --- Part 1. General requirements; --- Part 2. Methods for performance evaluation. This part of GB/T 28473 Part 2. This section Press GB/T 1.1-2009 "Standardization Guide Part 1. Standard structure and writing" requirement to write. The method of evaluating the performance of this part of the reference to GB/T 18271.1-2000 "process measurement and control devices - General performance evaluation method And procedures - Part 1. General ", GB/T 18271.2-2000" process measurement and control devices - General methods and procedures for evaluating performance Part 2. Test under reference conditions ", GB/T 18271.3-2000" process measurement and control devices - General methods and procedures for evaluating performance Order Part 3. effects of influence quantities test "and GB/T 18271.4-2000" process measurement and control devices - General performance evaluation method And procedures - Part 4. Content 'assessment reports relevant regulations. This section of Appendix A normative appendix. This part is proposed by China Machinery Industry Federation. This part of the measurement and control of Standardization Technical Committee (SAC/TC124) is administered by the National industrial processes. This section is responsible for drafting unit. Beijing Far East Instrument Co., Ltd.. Participated in the drafting of this section. Nanjing gifted times Electric Co., Ltd., Chongqing Sichuan Instrument Automation Co., Ltd., Chongqing Yutong System Software Ltd., Fujian on the Run Precision Instrument Co., Ltd., Fujian Shunchang Rainbow Run Precision Instrument Co., Ltd., Southwest University. The main drafters of this section. Wang Yue, Zhao exercise. The drafters of some of the participants. Dong Jian, Hanshao Ying, Zhang Xinguo, Wuhui Hua, Zhou Yue, Feng Wei, Ge Jian, Zhang Gang, Wei Xiaodong, Zhao Yixin, Li Tao, Zhou Xuelian, Zhu Peijun, He Qiang. Industrial process measurement and control systems temperature transmitter Part 2. Methods for performance evaluation1 ScopeThis section GB/T 28473 requirements to meet industrial process measurement and control system according to the standard specified in Part 1 of the temperature transmitter (Hereinafter referred to as transmitter) performance evaluation methods and inspection rules.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2423.10-2008 Environmental testing for electric and electronic products Part 2. Test methods Test Fc. Vibration (sinusoidal) (IEC 60068-2-6.1995, IDT) GB/T 2828.1-2003 Sampling procedures for inspection - Part 1. by acceptance quality limit (AQL) retrieval batch test sample Programme (ISO 2859-1.1999, IDT) GB 4793.1-2007 measurement, control and laboratory safety requirements for electrical equipment (IEC 61010-1.2001, IDT) GB/T 4798.2-2008 application of electric and electronic products environmental conditions - Part 2. Transport (IEC 60721-3-2.1997, MOD) GB/T 16511-1996 Electrical and electronic measuring equipment - Documentation GB/T 17614.1-2008 industrial process control systems use transmitters - Part 1. Methods of evaluating performance (IEC 60770-1. 1999, IDT) GB/T 17626.2-2006 Electromagnetic compatibility - Testing and measurement techniques - Electrostatic discharge immunity test (IEC 61000-4-2.2001, IDT) GB/T 17626.3-2006 Electromagnetic compatibility - Testing and measurement techniques RFEMS test (IEC 61000-4-3. 2002, IDT) GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test (IEC 61000-4-4. 2004, IDT) GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test (IEC 61000-4-5. 2005, IDT) GB/T 17626.8-2006 Electromagnetic compatibility - Testing and measurement techniques - Power frequency magnetic field immunity test (IEC 61000-4-8.2001, IDT) GB/T 18271.1-2000 Process measurement and control devices - General methods and procedures for evaluating performance - Part 1. General (idt IEC 61298-1.1995) GB/T 18271.2-2000 Process measurement and control devices - General methods and procedures for evaluating performance - Part 2. under reference conditions Test (idt IEC 61298-2.1995) GB/T 18271.3-2000 Process measurement and control devices - General methods and procedures for evaluating performance - Part 3. effects of influence quantities Test (idt IEC 61298-3.1998) GB/T 18271.4-2000 Process measurement and control devices - General methods and procedures for evaluating performance - Part 4. Evaluation report Content (idt IEC 61298-4.1995) GB/T 28473.1-2012 industrial process measurement and control system for temperature transmitters - Part 1. General requirements ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28473.2-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 28473.2-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 28473.2-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28473.2-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |