GB/T 28168-2025 English PDFUS$379.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28168-2025: Information technology - Middleware - Technical requirement for message-oriented middleware Status: Valid GB/T 28168: Historical versions
Basic dataStandard ID: GB/T 28168-2025 (GB/T28168-2025)Description (Translated English): Information technology - Middleware - Technical requirement for message-oriented middleware Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: L70 Classification of International Standard: 35.240.01 Word Count Estimation: 18,149 Date of Issue: 2025-04-25 Date of Implementation: 2025-11-01 Older Standard (superseded by this standard): GB/T 28168-2011 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 28168-2025: Information technology - Middleware - Technical requirement for message-oriented middleware---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. ICS 35.240.01 CCSL70 National Standard of the People's Republic of China Replaces GB/T 28168-2011 Information technology middleware message middleware technical requirements message-oriented middleware 2025-11-01 Implementation State Administration for Market Regulation The National Standardization Administration issued Table of contentsPreface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 2 5 Message Middleware Technology Reference Model 2 6 Deployment Management 3 6.1 Installation and Uninstallation 3 6.2 Starting and Stopping 3 6.3 System Deployment 3 7 Storage Management 3 7.1 Storage Mechanism 3 7.2 Storage Mode 3 8 Transmission Management 4 8.1 Network transmission protocol 4 8.2 Connection method 4 8.3 Message Uniqueness 4 9 Message Management 4 9.1 Message Attributes 4 9.2 Sending and Receiving Management 5 9.3 Message Control 5 9.4 Transaction Management 6 10 Message Service 6 10.1 Publish/Subscribe Method 6 10.2 Point-to-point mode 6 10.3 Routing and forwarding methods 7 11 Application Development 7 11.1 Application Development Interface 7 11.2 Message Protocol 7 12 Operation and Maintenance Management 7 12.1 Configuration Management 7 12.2 Log Management 8 12.3 Alarm Management 8 12.4 Message Operation and Management 8 12.5 Monitoring and Management 8 13 Safety Management 8 13.1 Message Encryption 8 13.2 Transmission Security 9 13.3 Identity Authentication 9 13.4 Configuring Security 9 13.5 Access Control 9 13.6 Log Audit 9 14 Reliability 9 14.1 Core Process Automatic Recovery 9 14.2 Route Backup 9 14.3 Stability 9 15 Ease of use 9 15.1 Product Manual 9 15.2 Application Examples 9 Reference 10ForewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 28168-2011 "Technical Specification for Information Technology Middleware Message Middleware" and GB/T 28168- Compared with.2011, in addition to structural adjustments and editorial changes, the main technical changes are as follows. a) Change "Architecture and composition of message middleware" to "Technical reference model of message middleware" (see Chapter 5,.2011 edition) Chapter 4); b) Change “functional requirements” to “transmission management” and “application development” (see Chapters 8 and 11, Chapter 5 of the.2011 edition); c) Added storage management (see Chapter 7); d) Changed message management (see Chapter 9, 4.2.4 of the.2011 edition); e) Added message service (see Chapter 10); f) Change “Quality Characteristics Attributes” to “Operation and Maintenance Management”, “Reliability” and “Usability” (see Chapters 12, 14 and 15, Chapter 7 of the.2011 edition); g) Safety management has been modified (see Chapter 13, 4.2.9 of the.2011 edition); h) Deleted the supported operating environments (see Chapter 8 of the.2011 edition). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Information Technology Standardization Technical Committee (SAC/TC28). This document was drafted by. China Electronics Technology Standardization Institute, Beijing Eastcom Technology Co., Ltd., Ant Technology Group Co., Ltd. Co., Ltd., Inspur Electronic Information Industry Co., Ltd., Shandong Zhongchuang Software Commercial Middleware Co., Ltd., Beijing Huasheng Xintai Digital Technology Co., Ltd., Beijing Baolande Software Co., Ltd., Puyuan Information Technology Co., Ltd., Shenzhen Kingdee Tianyan Cloud Computing Co., Ltd., Shenzhen Huarui Distributed Technology Co., Ltd., Institute of Software, Chinese Academy of Sciences, China Southern Power Grid Co., Ltd. China Electronics Jinxin Digital Technology Group Co., Ltd., Aerospace Network Security Technology (Shenzhen) Co., Ltd., Inspur Cloud Information Technology Co., Ltd., Shangrao Normal University, Aerospace Information Co., Ltd. The main drafters of this document are. Fang Chunyan, Fu Ping, Zhang Jie, Yu Binfeng, Zou Qiang, Chen Jingyang, Wei Jian, Sun Zhe, Wang Jinxian, Zhan Nianke, Wang Jianhua, Guo Bingrong, Zhang Wei, Wang Wei, Lin Zhida, Hu Rudao, Hao Song, Zhang Min, Huang Qibao, Zhang Lijun, Li Zhipeng, Yang Wei, Wang Kaiyong, Zeng Pengbing, Guo Zhihui, Yang Wei, Hu Depeng, He Jinbiao, Zhao Xin, Jia Xianyang, Yu Yanan, Liu Yueqiang, Li Chaopeng, Deng Zhe, Guo Wenjie, Liu Xiang, Chen Huiyuan, Tang Zhen, Zhang Shuyang, Zhao Ping, Cheng Chao, Ma Fuchao, Zheng Jiajia, Li Meng, Xin Hua, and Fan Zhongkai. The previous versions of this document and the documents it replaces are as follows. ---First published in.2011 as GB/T 28168-2011; ---This is the first revision. Information technology middleware message middleware technical requirements1 ScopeThis document establishes the technical reference model of message middleware and specifies deployment management, storage management, transmission management, message management, message Requirements for services, application development, operation and maintenance management, security management, reliability and ease of use. This document applies to the design, development, application and testing of message middleware software.2 Normative referencesThis document has no normative references.3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 message-oriented middleware Software that supports messaging and integration of distributed systems through queuing and messaging mechanisms. [Source. GB/T 33847-2017, 2.8] 3.2 message Information passed or exchanged between different applications. Note. The format and content of the message are determined by negotiation between the sender and receiver of the message. 3.3 Message sendermessagesender The entity that originated the message. Note. The entity that actively publishes messages by subscribing to topics is called a message publisher. 3.4 message receivermessagereceiver The entity that receives the message. Note. An entity that actively receives messages by subscribing to a topic is called a message subscriber. 3.5 queue A buffer entity that stores messages. 3.6 message priority messagepriority Set different priority levels for messages according to their urgency. Note. Messages have different priorities. During the message sending and receiving process, high priority messages are processed first. 3.7 expirationofmessage When a message is generated, the message attributes set by the application specify the period within which the message can be consumed. Note. Messages within the validity period can be consumed by applications. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28168-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 28168-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 28168-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28168-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 28168-2025?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 28168-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |