GB/T 26763-2011 English PDFUS$329.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 26763-2011: Flight operational quality assurance events and deviation limits for Boeing and Airbus aircraft Status: Valid
Basic dataStandard ID: GB/T 26763-2011 (GB/T26763-2011)Description (Translated English): Flight operational quality assurance events and deviation limits for Boeing and Airbus aircraft Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: C04 Classification of International Standard: 11.020 Word Count Estimation: 14,182 Date of Issue: 2011-07-20 Date of Implementation: 2012-05-01 Regulation (derived from): Announcement of Newly Approved National Standards No. 10 of 2011 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the Airbus and Boeing aircraft flight each flight phase quality control projects and requirements. This standard applies to the Airbus A300-600 series, A310 series, A319 series, A320 series, A321 series, A330 series, A340 series, Boeing B737 series, B747 series, B757 series, B767 series and B777 series aircraft flight quality control. GB/T 26763-2011: Flight operational quality assurance events and deviation limits for Boeing and Airbus aircraft---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Flight operational quality assurance events and deviation limits for Boeing and Airbus aircraft ICS 11.020 C04 National Standards of People's Republic of China Boeing and Airbus aircraft flying qualities Monitoring Project Specification Issued on. 2011-07-20 2012-05-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordThis standard was drafted in accordance with the rules of GB/T 1.1 is given. This standard is proposed and managed by the Civil Aviation Administration of China. This standard was drafted. China Civil Aviation Administration of Aviation Safety Technology Center, China Civil Aviation Administration Office of Aviation Safety. The main drafters of this standard. Shu Ping, Wang lighting, Yang Lin, Li Bin, Li Xiang, Wang Haofeng. Boeing and Airbus aircraft flying qualities Monitoring Project Specification1 ScopeThis standard specifies the Airbus and Boeing series aircraft flight phases of flight quality control and project requirements. This standard applies to the Airbus A300-600 series, A310 series, A319 series, A320 series, A321 series, A330 series, A340 series, Boeing B737 series, B747 series, B757 series, B767 Series and B777 series aircraft flight quality control. 2 terms, definitions and abbreviations 2.1 Terms and Definitions The following terms and definitions apply to this document. 2.1.1 Monitoring Project eventdescription To monitor the quality of the project content flight set. 2.1.2 Monitoring parameters triggeringparameters Recorded on the recorder, and monitoring data related to the project. 2.1.3 Monitoring points monitoringpoint Data control point monitoring project. 2.1.4 Deviation limit deviationlimits According to the project monitoring flight parameters set limits, sub-two levels of mild and severe. 2.1.5 Mild deviation lowlevel Flight parameter deviation from the normal range of values \u200b\u200bsmaller deviation. 2.1.6 Serious discrepancies highlevel Flight parameter deviation from the normal range of values \u200b\u200bof large deviation. 2.1.7 F Speed \u200b\u200bFspeed Takeoff minimum flap retraction speed or aircraft in the form of the target rate of 2 or 3 forms of the approach. 2.1.8 Normal law normallaw Airbus FBW aircraft under normal circumstances, with all the flight control manipulation protection mode. allows pilots pitch, Roll and yaw axis control; analysis of each electronic signal, it exceeded the safety limit of aircraft flight envelope. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 26763-2011_English be delivered?Answer: Upon your order, we will start to translate GB/T 26763-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 26763-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 26763-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |