GB/T 26610.3-2014 English PDFUS$349.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 26610.3-2014: Guideline for implementation of risk-based inspection of pressure equipment system -- Part 3: Qualitative approach to risk Status: Valid
Basic dataStandard ID: GB/T 26610.3-2014 (GB/T26610.3-2014)Description (Translated English): Guideline for implementation of risk-based inspection of pressure equipment system -- Part 3: Qualitative approach to risk Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: J74 Classification of International Standard: 23.020.30 Word Count Estimation: 15,110 Date of Issue: 5/6/2014 Date of Implementation: 12/1/2014 Quoted Standard: GB/T 26610.1 Regulation (derived from): National Standards Bulletin No. 9 2014 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the method for qualitative analysis of risk petrochemical plant pressure equipment system, qualitative risk analysis of other industrial pressure equipment may also refer to implementation of the system adopted. This standard appli GB/T 26610.3-2014: Guideline for implementation of risk-based inspection of pressure equipment system -- Part 3: Qualitative approach to risk---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Guideline for implementation of risk-based inspection of pressure equipment system Part 3.. Qualitative approach to risk ICS 23.020.30 J74 National Standards of People's Republic of China Pressure Equipment Risk Based Inspection System Implementation Guide Qualitative Risk Analysis. Part 3 pressureequipmentsystem-Part 3. Qualitativeapproachtorisk Issued on. 2014-05-06 2014-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordGB/T 26610 "Pressure Equipment Inspection System Based on the implementation of the pilot risk" is divided into five sections. --- Part 1. General requirements and implementation procedures; --- Part 2. risk-based inspection strategy; --- Part 3. Qualitative analysis of risk; --- Part 4. Quantitative analysis of the possibility of failure; --- Part 5. Quantitative analysis of the consequences of failure. This section GB/T Part of 326,610. This section drafted in accordance with GB/T 1.1-2009 given rules. This section reference APIRP581 "risk-based inspection", combined with China's actual situation to develop. This part of the National boiler pressure vessel Standardization Technical Committee (SAC/TC262) and focal points. This section is drafted. Hefei General Machinery Research Institute, China Special Equipment Inspection and Research Institute, Fujian Special Equipment Inspection and Research Institute, China Petroleum and Chemical Corporation, China National Petroleum Corporation, China Petroleum & Chemical Corporation Maoming Branch, Dalian West Pacific Petrochemical Co., Ltd. The main drafters of this section. Xuedong, Yi Zhibin, Yangtie Cheng, Hu Jiushao, Gu Wang Ping, Jia Guodong, Wang Hui, Li Guanghai, Xie Shan, Wang Xiaomei, Zhang Chao, HE Cheng thick, Lixin Wei, Han Jianyu, Qu Yu. Pressure Equipment Risk Based Inspection System Implementation Guide Qualitative Risk Analysis. Part 31 ScopeGB/T 26610 in this section gives a qualitative approach to risk analysis for petrochemical plant pressure equipment systems, other workers Qualitative Risk Analysis industry pressure equipment may also refer to implementation of the system adopted. This section applies to GB/T 26610.1 pressure equipment referred to in the system.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 26610.1 pressure equipment inspection system based on the implementation of the pilot risk - Part 1. General requirements and implementation procedures3 Terms and DefinitionsGB/T 26610.1 defined and the following terms and definitions apply to this document. 3.1 Equipment factor equipmentfactor EF And means (unit or section) in the characterization of the total number of values \u200b\u200brelated to equipment failure may occur. 3.2 Damage factor damagefactor DF Potential damage mechanism characterization of the type of quantization means (unit or section) in. 3.3 Inspection factor inspectionfactor IF Effectiveness and identification device (unit or section) of the potential damage to the mechanism's ability to quantify the characterization of the current testing procedures. 3.4 Maintenance status factor maintenanceconditionfactor MCF Characterization of quantization is running the evaluation unit (unit or section) design and manufacturing standards, enterprise management and maintenance program effectiveness. 3.5 Process factor processfactor PF Means (unit or section) Continuity of Operations, process stability and reliability of safety devices quantitative characterization. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 26610.3-2014_English be delivered?Answer: Upon your order, we will start to translate GB/T 26610.3-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 26610.3-2014_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 26610.3-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |