GB/T 25928-2010 English PDF

US$714.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 25928-2010: Automation systems in the process industry -- Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 25928-2010714 Add to Cart 4 days Automation systems in the process industry -- Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) Valid

Similar standards

GB/T 20438.7   GB/T 20438.6   GB/T 20438.5   GB/T 25919.2   GB/T 25921   GB/T 25919.1   

Basic data

Standard ID: GB/T 25928-2010 (GB/T25928-2010)
Description (Translated English): Automation systems in the process industry -- Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: N10
Classification of International Standard: 25.040.40
Word Count Estimation: 36,378
Date of Issue: 1/14/2011
Date of Implementation: 5/1/2011
Adopted Standard: IEC 62381-2006, IDT
Regulation (derived from): Announcement of Newly Approved National Standards No. 2 of 2011
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This Standard specifies the side factory acceptance test (FAT), site acceptance test (SAT) and site integration testing (SIT) procedures and standards. These tests are fully automated control system in order to prove compliance with standards. Engineering and system testing prior to production activities not within This Standard is applicable to a range of the content of this standard can be used as guidance in practical work, the actual requirements for a variety of processes, plant and equipment. Figure 1 depicts a typical sequence of activities and events throughout the Figure 2 and FIG. 3 shows the relationship between the various stages.

GB/T 25928-2010: Automation systems in the process industry -- Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Automation systems in the process industry.Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) ICS 25.040.40 N10 National Standards of People's Republic of China Industrial process automation systems Factory Acceptance Test (FAT), site acceptance Test (SAT), a comprehensive field test (SIT) specification Factoryacceptancetest (FAT), siteacceptancetest (SAT), andsiteintegrationtest (SIT) (IEC 62381.2006, IDT) Issued on. 2011-01-14 2011-05-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ Introduction Ⅱ 1 Scope 1 2 Terms and definitions 2 3 Acronyms 3 We must be prepared prior to the implementation work FAT 4 3 4.1 File owner/general contractor usually prepared 4 File 4.2 Suppliers usually prepare 4 5 Factory Acceptance Test FAT 4 5.1 General 4 5.2 FAT test schedule 5 5.3 Test procedure 5 5.4 FAT's review 7 5.5 FAT file (see Appendix A) 7 6 Site Acceptance Test SAT 8 6.1 General 8 6.2 SAT test schedule 8 Comprehensive field testing SIT 8 7 7.1 General 8 7.2 SIT test schedule 8 Appendix A (informative) Factory Acceptance Test (FAT) Test Table 10 Annex B (informative) Site Acceptance Test (SAT) Test Table 22 Annex C (informative) Comprehensive field testing (SIT) Checklists 23 Appendix D (Informative Appendix) FAT 24 certificate Appendix E (Informative Appendix) SAT 25 certificate Appendix F (Informative Appendix) SIT certificate 26 Annex G (informative) automation systems acceptance certificate 27 Appendix H (Informative Appendix) FAT does not meet the entry table 28 Annex I (Information Appendix) SAT does not meet the entry table 29 Appendix J (Informative Appendix) SIT does not meet the entry table 30

Foreword

This standard is identical with IEC 62381.2006 "industrial process automation systems --- factory acceptance test (FAT), site acceptance test (SAT), a comprehensive field test (SIT) Specification "(in English). This standard is equivalent translation IEC 62381.2006, there was no difference in the technical content, for the convenience of users, with the structure of the text On appropriately adjusted, according to GB/T 1.1-2000 "Standardization Guide Part 1. Structure and rules are written standard" and GB/T 20000.2-2001. the relevant provisions of "Standardization Guide Part 2 rules of international standards" were editorial modify. This standard is mainly made editorial changes as follows. a) Remove the preface to the international standards; b) "The document" to the "standard"; c) according to GB/T 1.1-2000 column entry requirements (5.2.5), within the full range of punctuation column item regulate, and Two items listed in section 5.3.2 increases the number for identification. The Standard Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G, Appendix H, Appendix I, Appendix J for information only appendix. The standard proposed by China Machinery Industry Federation. This standard by the national industrial process measurement and control Standardization Technical Committee (SAC/TC124) centralized. This standard is drafted by. Shanghai Institute of Industrial Automation Instrumentation. Participated in the drafting of this standard. Shanghai Siemens Industrial Automation Ltd., Shanghai Emerson Process Management, Shanghai Municipal Engineering Design Institute, Jiang Su Jinzhi Technologies AG, Shanghai Hyde controlling stake in the company, Tokyo Electric Power Automation Co., Ltd. Shanghai, Parker Environmental Technology (Shanghai) Co., Ltd., Information Science and Engineering, East China University of Technology, Shanghai Automation Instrumentation System Inspection and Testing Institute. The main drafters of this standard. Xu Qing, Zhang Guangping, Miao Xueqin, Chen Tingjiong, WU Guo-wei, Gao Ming, Wu Yaqi. Participate drafters of this standard. Li Minghua, Gu Xing-sheng, Wang Ou, Yan Wei of cotinine, stone beads, Liu Jingbo, Luzu Ming, Liu Jian, Yifan, Qiu Xuanzhen.

Introduction

The current field of process control there is such a phenomenon, the period of the Project were asked to compress getting shorter, while the automatic control system But due to the complexity of the various reasons on the rise, these reasons include the increase relates to the use of communication layers and a variety of new technologies, such as now Field bus system. Experience shows, owners, general contractors and subcontractors are often used to distinguish their commitment to the standard by consuming huge Gongben discussions and consultations will have Help improve the effectiveness and reduce the time to negotiate consultations, the parties can reach a consensus as soon as possible is responsible for their content. Appendix to this standard contains the testing process may be used in form. These appendices form using Excel format. The standard purchase After registration, users can copy these forms according to their needs, but the number should not exceed the number of replication specified. For the pharmaceutical industry, or other highly specialized industrial applications, some special specifications, instructions and constraints existing file with the current The standard file act together. Industrial process automation systems Factory Acceptance Test (FAT), site acceptance Test (SAT), a comprehensive field test (SIT) specification

1 Scope

This standard defines the factory acceptance test (FAT), site acceptance test (SAT) and site integration testing (SIT) procedures and specifications. These tests are fully automated control system in order to prove compliance with standards. Systems engineering and production activities before the test is not within the scope of this standard involved. The content of this standard can be used as guidance in practical work for a variety of practical requirements of process, plant and equipment. Figure 1 depicts A typical sequence of events and activities throughout, Figures 2 and 3 shows the relationship between the various stages. FAT prerequisite. --- Complete software development; --- To complete the system connection; --- Complete Supplier internal testing. SAT prerequisite. --- System has been delivered to the Site; --- Installed correctly; --- System startup. SIT prerequisite. Room --- system is properly connected; --- To complete the SAT. Note. In fact, during the construction phase, once the basic components required to complete the installation and start the loop test. Project nodes corresponding to the FAT 1, SAT and SIT typical sequence of events schematic Figure 2 DCS subsystem SAT and SIT phase and phase relationship between the schematic
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 25928-2010_English be delivered?

Answer: Upon your order, we will start to translate GB/T 25928-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 25928-2010_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 25928-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.