GB/T 25738-2024 English PDFUS$249.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 25738-2024: Technical guideline of motor commissioning for nuclear power plant Status: Valid GB/T 25738: Historical versions
Basic dataStandard ID: GB/T 25738-2024 (GB/T25738-2024)Description (Translated English): Technical guideline of motor commissioning for nuclear power plant Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F25 Classification of International Standard: 29.240.99 Word Count Estimation: 12,147 Date of Issue: 2024-10-26 Date of Implementation: 2025-05-01 Older Standard (superseded by this standard): GB/T 25738-2010 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 25738-2024: Technical guideline of motor commissioning for nuclear power plant---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT25738-2024Technical guideline of motor commissioning for nuclear power plant Technical Guidelines for Commissioning of Electric Motors in Nuclear Power Plants ICS 29.240.99 CCS F 25 National Standard of the People's Republic of China Replaces GB/T 25738-2010 Released on October 26, 2024 Implementation on May 1, 2025 State Administration for Market Regulation The National Standardization Administration issued Table of ContentsPreface... Ⅲ 1 Scope... 1 2 Normative references... 1 3 Terms and Definitions 1 4 Debugging... 1 4.1 Debugging Prerequisites 1 4.2 Preliminary Inspection 2 4.3 Static test 2 4.4 Start the test... 4 5 Test Report... 6 Appendix A (Informative) Conversion Factors for Converting Motor Stator Winding Insulation Resistance to Operating Temperature 7 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents". Drafting is required. This document replaces GB/T 25738-2010 "Technical Guidelines for Commissioning of Electric Motors in Nuclear Power Plants". In addition to structural adjustments and editorial changes, the main technical changes are as follows. The scope of application has been changed (see Chapter 1, Chapter 1 of the.2010 edition); a) The definition of nuclear safety-grade motor has been changed (see 3.2, 3.2 of the.2010 edition); b) Added the requirements for the completion of motor installation (see 4.1.3); c) The provisions for checking lubricating oil have been changed [see 4.2.2 e) and 4.2.2 e) of the.2010 edition]; d) Added the requirement to check the current transformer (CT) wiring [see 4.4.1 g)]; e) Added the requirement to check the neutral point connection [see 4.4.1 h)]; f) Added the requirement to inspect the inverter [see 4.4.1 k)]; g) Added requirements for no-load starting voltage drop measurement (see 4.4.3.1); h) Added requirements for no-load starting of motors with frequency converters (see 4.4.3.7); i) Added requirements for measuring the voltage drop when starting with load (see 4.4.4.2); j) Change “low-voltage motor” to “motor with rated voltage below 1 000 V” and change “high-voltage motor” to “motor with rated voltage below 1 000 V”. Motors with a voltage of 1 000 V and above" (see 4.4.3.2, 4.4.4.3, 4.4.4.4,.2010 edition 4.4.3.2, 4.4.4.3, 4.4.4.4); k) The normative appendix "Quality Appraisal and Special Tests for Typical Nuclear Safety-Grade Motors" (see Appendix A of the.2010 edition) has been deleted. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the China Electricity Council. This document was drafted by. Suzhou Thermal Engineering Research Institute Co., Ltd., CGN Engineering Co., Ltd., China Nuclear Power Engineering Co., Ltd., Grid Electric Power Technology Co., Ltd., China Electric Power Engineering Consulting Group East China Electric Power Design Institute Co., Ltd., Jiamusi Electric Motor Co., Ltd. company. The main drafters of this document are. Liu Yong, Yuan Jin, Chen Wei, Zhou Jielian, Ye Yongjian, Chang Yanqin, Gong Boyang, Jin Chengyi, Zha Dongjian, Liu Qiang, Jin Chungang and Yu Chuanlin. The previous versions of this document and the documents it replaces are as follows. First published in.2010 as GB/T 25738-2010; This is the first revision. Technical Guidelines for Commissioning of Electric Motors in Nuclear Power Plants1 ScopeThis document specifies the commissioning conditions, commissioning methods, judgment criteria, and report contents for AC asynchronous motors in nuclear power plants. This document applies to the commissioning of AC asynchronous motors in nuclear power plants.2 Normative referencesThe contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the latest version (including all amendments) applies to this document. In this document. GB/T 755 Ratings and performance of rotating electrical machines GB/T 1032 Test methods for three-phase asynchronous motors GB/T 10068 Mechanical vibration of motors with a shaft center height of 56 mm or more - Measurement, evaluation and limits of vibration GB/T 14048.12 Low-voltage switchgear and controlgear Part 4﹘3.Contactors and motor starters for non-motor loads AC semiconductor controllers and contactors GB 50150 Electrical Equipment Acceptance Test Standard for Electrical Installation Engineering 3 Terms and Definitions The following terms and definitions apply to this document. 3.1 components Items that make up equipment. Note. Typical components of an electric motor include stators, rotors, bearings, couplings, electric heaters, coolers, terminal boxes, locking devices, seals, sensors, Devices, etc. 3.2 nuclear safety class motor Suitable for motors required to protect the public during and after an accident.4 Debugging4.1 Debugging Prerequisites 4.1.1 The instruments and meters used for debugging shall be inspected and calibrated to be qualified and within the validity period. 4.1.2 The design and manufacturing completion documents of the motor should be complete and valid. 4.1.3 The motor installation is complete, the electrical and instrumentation circuits are terminated, and the auxiliary systems are available. 4.1.4 The debugging related documents have come into effect and the debugging work permit has been obtained. 4.1.5 The quality appraisal of nuclear safety-grade motors, special test factory documents and the application environment of nuclear safety-grade motors shall comply with the design requirements. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 25738-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 25738-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 25738-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 25738-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 25738-2024?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 25738-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |