Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 21645.6-2009 English PDF

US$509.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 21645.6-2009: Technical requirements for automatically switched optical network -- Part 6: Management plane
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 21645.6-2009509 Add to Cart 4 days Technical requirements for automatically switched optical network -- Part 6: Management plane Valid

Similar standards

YD/T 2554.1   GB/T 9771.1   GB/T 20186.1   GB/T 21645.11   GB/T 21645.10   GB/T 21645.8   

Basic data

Standard ID: GB/T 21645.6-2009 (GB/T21645.6-2009)
Description (Translated English): Technical requirements for automatically switched optical network -- Part 6: Management plane
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: M33
Classification of International Standard: 33.040.20
Word Count Estimation: 22,246
Date of Issue: 2009-09-30
Date of Implementation: 2009-12-01
Regulation (derived from): Announcement of Newly Approved National Standards No. 10 of 2009 (No. 150 overall)
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the Automatically Switched Optical Network (ASON) management plane technical requirements, including: ASON management framework, management needs and ASON Network Element Management System (EMS) technical requirements. This section applies to ASON network element management system.

GB/T 21645.6-2009: Technical requirements for automatically switched optical network -- Part 6: Management plane


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements for automatically switched optical network.Part 6. Management plane ICS 33.040.20 M33 National Standards of People's Republic of China Automatically Switched Optical Network (ASON) technical requirements Part 6. Management Plane Posted 2009-09-30 2009-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Abbreviations 1 4 ASON management framework 2 4.1 ASON network management relationship between the structure and TMN 2 4.2 ASON management architecture 3 5 ASON management requirements 4 5.1 ASON control plane element 4 5.2 ASON control-related services 4 5.3 Control plane transport resource identification 5 5.4 control and domain routing area 6 5.5 Conservation and Recovery 6 5.6 Data Communication Network (DCN) 6 5.7 accounting information 6 6 ASON network element management system (EMS) Technical requirements 6 Overall 6 6.1 System Requirements 6.2 Management features require 6 6.3 ASONEMS interface 17

Foreword

GB/T 21645 "Automatic Switched Optical Network (ASON) technical requirements" consists of the following components. --- Part 1. Architecture and general requirements; --- Part 2. Terms and definitions; --- Part 3. Data Communication Network (DCN); --- Part 4. signaling; --- Part 5. routing; --- Part 6. management plane; --- Part 7. automatic discovery. This section GB/T Part of 621,645. This section reference ITU-TG. 7718 "ASON Management Framework" (in English) and the ITU-TG. 7718.1 "protocol-independent control Plane management information model "(in English), and the International Organization for Standardization TMF recommendations on automatic switching optical network management and the draft customized. This part is proposed by the Ministry of Industry and Information Technology of the People's Republic of China. This part of the jurisdiction of the China Communications Standards Association. This section is responsible for drafting unit. Ministry of Industry and Information Technology and Telecommunications Research Institute. This section participated in the drafting unit. China Telecom, Huawei Technologies, ZTE Corporation, Wuhan Post and Telecommunications Division Graduate School, Shanghai Bell Alcatel. The main drafters of this section. Wang Yu, Zhang Guoying, Huo Xiaoli, Shi Xinghua, Si Xin, Gushu Gang, Jianhua. Automatically Switched Optical Network (ASON) technical requirements Part 6. Management Plane

1 Scope

This section GB/T 21645 specifies the Automatically Switched Optical Network (ASON) technology management plane requirements, including. ASON management Framework, management needs and ASON network element management system (EMS) technical requirements. This section applies to ASON network element management system.

2 Normative references

The following documents contain provisions which, through reference GB/T 21645 in this section constitute provisions of this section. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section. GB/T 21645.1 Automatic Switched Optical Network (ASON) technical requirements - Part 1. Architecture and general requirements YD/T 1289.2-2003 SDH transmission network management specification --- EMS system features section ITU-TG. 803 transport network architecture based on the synchronous digital hierarchy (SDH) of ITU-TG. 872 optical transport network architecture ITU-TG. 7718 ASON management framework ITU-TG. 8080 Automatic Switched Optical Network Architecture

3 Abbreviations

The following abbreviations apply to this section. ASON AutomaticalySwitchedOpticalNetwork Automatically Switched Optical Network BoD BandwidthonDemand Bandwidth on demand CC ConnectionControler connection controller CF ControlPlaneFunction control plane functions CP ControlPlane control plane CTP ConnectionTerminationPoint connection terminal point Discovery Agent DA DiscoveryAgent DCC DataCommunicationsChannel data communication path EMS ElementManagementSystem Element Management System E-NNI ExternalNetwork-NetworkInterface (referencepoint) external network - network interface (reference point) I-NNI InternalNetwork-NetworkInterface (referencepoint) internal network - network interface (reference point) LCAS LinkCapacityAdjustmentScheme link capacity adjustment scheme LRM LinkResourceManager link resource manager MCN ManagementCommunicationNetwork communications network management MP ManagementPlane management plane NE NE NetworkElement NEF NetworkElementFunction network element function NMS NMS NetworkManagementSystem
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 21645.6-2009_English be delivered?

Answer: Upon your order, we will start to translate GB/T 21645.6-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 21645.6-2009_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 21645.6-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.