Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 21412.5-2017 English PDF

US$2879.00 · In stock
Delivery: <= 10 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 21412.5-2017: Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 5: Subsea umbilical
Status: Valid

GB/T 21412.5: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 21412.5-20172879 Add to Cart 10 days Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 5: Subsea umbilical Valid
GB/T 21412.5-2010RFQ ASK 8 days Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 5: Subsea umbilical Obsolete

Similar standards

GB/T 21447   SY/T 5164   SY/T 5324   GB/T 21412.2   GB/T 21412.11   GB/T 21412.10   

Basic data

Standard ID: GB/T 21412.5-2017 (GB/T21412.5-2017)
Description (Translated English): Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 5: Subsea umbilical
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: E94
Classification of International Standard: 75.180.10
Word Count Estimation: 144,169
Date of Issue: 2017-10-14
Date of Implementation: 2018-05-01
Older Standard (superseded by this standard): GB/T 21412.5-2010
Regulation (derived from): National Standard Announcement 2017 No. 26
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 21412.5-2017: Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 5: Subsea umbilical


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Petroleum and natural gas industries-Design and operation of subsea production systems-Part 5. Subsea umbilicals ICS 75.180.10 E94 National Standards of People's Republic of China Replacing GB/T 21412.5-2010 Oil and gas industry Underwater production system design and operation Part 5. Underwater umbilicals Petroleumand naturalgasindustries- Design and operating of subseaproductionsystems- Part 5.Subseaumbilicals (ISO 13628-5.2009, IDT) 2017-10-14 published.2018-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Foreword V. Introduction Ⅵ 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 3 3.1 Terms and definitions 3 3.2 Abbreviations 8 4 functional requirements 9 4.1 General requirements 9 4.2 Engineering Specific Requirements 10 5 Safety, Design and Test Principles 10 5.1 Application 10 5.2 Safety Goal 10 5.3 System Review 10 5.4 Basic Requirements 10 5.5 Design Principles 11 5.6 Test 12 6 Design Requirements 13 6.1 Overview 13 6.2 Load 13 6.3 Load Effect Analysis 16 6.4 Installation Analysis 20 6.5 Fatigue life 21 Part 7 Design, Fabrication and Testing 21 7.1 Overview 21 7.2 Cables 22 7.3 Hose 30 7.4 Optical Cable 38 7.5 metal tube 42 8 Terminal and ancillary equipment design 55 8.1 Design Principles 55 8.2 Design Process 55 8.3 armored terminal 55 8.4 Steel and Hose Terminals 55 8.5 Cable Terminal 56 8.6 drag head 56 8.7 Upper Suspension 56 8.8 underwater terminal interface 57 8.9 Underwater umbilical terminal 57 8.10 Curvature Limiter 57 8.11 Anti-bending reinforcement 57 8.12 Ancillary Equipment 58 Design of umbilical cord 9.1 Temperature range 60 9.2 Maximum tensile load 60 9.3 Ultimate Tensile Load 60 9.4 minimum bend radius of 60 9.5 Cross section layout 60 9.6 Cable 61 Subbeam 61 9.8 inner sheath 61 9.9 armored 61 9.10 Outer sheath 62 9.11 Length logo 62 Manufacture and testing of umbilicals 10.1 Manufacture of umbilicals 62 10.2 Assessment and Verification Tests 64 11 Factory Acceptance Test (FAT) 64 11.1 Overview 64 11.2 Appearance and Size Inspection 65 11.3 Terminal Electrical Continuity 65 11.4 terminal test connection 65 11.5 cable 65 11.6 Optical Cable 65 11.7 Hose 65 11.8 Metal tube 66 11.9 Terminal 66 11.10 Continuity check 66 Save 12 12.1 Overview 66 12.2 Umbilical Protection 66 12.3 Spare Cable 67 12.4 Maintenance Tools 67 12.5 Overall Test 67 Work Before Installation 67 13.1 umbilical data 67 13.2 Routing Information 68 13.3 Terminal and Auxiliary Equipment Information 68 13.4 Rely on Facility Information 68 13.5 Underwater structures information 69 13.6 Relying on Facilities Survey 69 14 loading 69 14.1 Overview 69 14.2 Technical Review of Loading Equipment 69 14.3 Shipping Procedures 70 14.4 pre-shipment meeting 70 14.5 Pre-shipment test 70 14.6 Loading operations 71 14.7 Suspension and commencement of shipment 71 14.8 Handling of umbilicals 71 14.9 Shipment Monitoring 72 14.10 Ship with reel or turntable 73 14.11 Post-Shipment Test 73 15 Install the job 15.1 Overview 73 15.2 Requirements for the Installation of Ships and Equipment 73 15.3 Pre-Installation Exploration 74 15.4 I-type or J-tube dragging operation 75 15.5 Installation of Underwater Terminal (Starting End) 77 15.6 Laying Routing 77 15.7 Route Laying Requirements 77 15.8 Cable carrier positioning to reach the required touchdown point 77 15.9 Control and inspection of laying length 78 15.10 Integrity monitoring during laying 78 15.11 Burying 79 15.12 Laying near the end of laying (terminal laying) 80 15.13 Underwater terminal decentralization 80 15.14 Dragging of the underwater terminal 81 15.15 Pipeline crossing 81 15.16 Floating Attachments 81 15.17 Weak Connection Configuration 81 15.18 Exploration After Laying 81 15.19 Buried Exploration 82 15.20 Post-drag test 82 15.21 Test after connection 82 15.22 Recovery of Installation Aids 83 15.23 Emergency Procedures 83 15.24 Fixes 83 15.25 Post-Installation Survey 83 Appendix A (Informative) Information provided in Buyer's Specifications Appendix B (informative) umbilical cord test 90 Appendix C (informative) Preferred hose and metal pipe size 94 Appendix D (Normative) Hose and umbilical cord properties test 95 Appendix E (informative) fatigue test 99 Appendix F (Informative) Load Effect Analysis 101 Appendix G (informative) umbilical full scale test Appendix H (informative) metal pipe material list Appendix I (informative) metal pipe wall calculation example 129 Appendix J (Informative) Metal tube buckling 134 References 136

Foreword

GB/T 21412 "Design and operation of oil and gas industry underwater production system" is divided into 15 parts. --- Part 1. General requirements and recommended practices; --- Part 2. Non-bonded flexible pipe systems for the seabed and the sea; --- Part 3. Out of the pipeline (TFL) system; --- Part 4. Underwater wellhead equipment and Christmas tree equipment; --- Part 5. Underwater umbilical; --- Part 6. Underwater production control system; --- Part 7. Completion/workover riser systems; --- Part 8. Underwater vehicle (ROV) interface for subsea production systems; --- Part 9. Remote operation tool (ROT) maintenance system; --- Part 10. Cohesive flexible pipe specifications; --- Part 11. Flexible pipe systems for the seabed and the sea; --- Part 12. Dynamic production of legislation; --- Part 13. Underwater production system remote operation tools and interfaces; --- Part 14. Underwater high integrity pressure protection system; --- Part 15. Underwater structures and manifold. This section GB/T 21412 Part 5. This section drafted in accordance with GB/T 1.1-2009 given rules. This section uses the translation method is equivalent to using ISO 13628-5.2009 "design and operation of oil and gas industry underwater production system Part 5. Underwater umbilicals. " The documents of our country that are consistent with the corresponding international documents that are normative references in this section are as follows. --- GB/T 3956-2008 conductor of the cable (IEC 60228.2004, IDT) --- GB/T 5563-2013 Rubber and plastics hoses and hose assemblies - Hydrostatic test method (ISO 1402.2009, IDT) --- GB/T 7129-2001 Determination of volume expansion of rubber or plastic hoses (idtISO 6801.1983) --- GB/T 9574-2001 rubber and plastic hose and hose assembly test pressure, burst pressure and design pressure Ratio (idtISO 7751.1991) --- GB/T 18422-2013 Determination of breathability of rubber and plastics hoses and hose assemblies (ISO 4080.2009, IDT) --- GB/T 21412.8-2010 Design and operation of subsea production systems for oil and gas industry - Part 8. Underwater production System's Underwater Robot (ROV) Interface (ISO 13628-8.2002, IDT) This part of the National Oil and Gas Standardization Technical Committee (SAC/TC355) proposed and managed. This part of the drafting unit. Offshore Oil Engineering Co., Ltd., CNOOC Research Institute. The main drafters of this section. Zhou Meizhen, Cheng Hansheng, Guo Hong, Liu Huajian, Zhang Fei, Fang Wei, Yan Jia Yu, Xu Wenhu. This part replaces the standards previously issued as. --- GB/T 21412.5-2010.

Introduction

The second edition of this part is based on the first edition of ISO 13628-5, the first edition of ISO 13628-5 is based on APISpec17E second edition and APIRP 17I first edition. The first edition of ISO 13628-5 has been adopted by API as the third edition of APISpec17E. APISpec17E fourth edition will be with The second edition of this section to be consistent. Users of this section should note that for specific applications may require different from the requirements of this section, or than the rules in this section Set the content deeper requirements. This section is not intended to prohibit suppliers to provide products or buyers to accept the products provided by suppliers, for specific Applications, especially in the case of technological innovation or development, alternative equipment or engineering alternative. When using alternative to do Act, the supplier should be different from this part of the logo and provide detailed instructions. Oil and gas industry Underwater production system design and operation Part 5. Underwater umbilicals

1 Scope

GB/T 21412 provisions of this part of the umbilical cord and related ancillary equipment design, material selection, manufacturing, design verification, test, safety Installation and operation requirements, and gives the recommended practices for the oil and gas industry. Ancillary equipment does not include the upper block hardware device, these hard Parts are those that are not permanently connected to the umbilical cord over the upper block suspension terminals. This section applies to separate components, such as cables, optical fibers, thermoplastic hoses or metal pipes constitute the umbilical cord, or combination of their navel With cable. This section applies to static or dynamic operation of the umbilical, the path can be water - water, water - underwater and underwater - underwater. This section does not apply to the relevant components joints, unless these joints affect the umbilical or its ancillary equipment performance. This section only applies to the following dimensions of the metal pipe wall thickness t < 6mm, ID ID < 50.8mm (2in). More than these sizes of production The product shall be considered as a pipe/pipe and shall be designed and manufactured in accordance with accepted pipe/pipe standards. This section does not apply to the rated pressure of less than 7MPa (1015psi) of the metal pipe or hose. This section does not apply to the rated voltage higher than the standard rated voltage U0/U (Um) = 3.6/6 (7.2) kVrms cable, where U0, U Um is defined by IEC 60502-1 and IEC 60502-2.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 5564-2006 rubber and plastic hose low temperature deflection test (ISO 4672.1997, IDT) GB/T 5568-2013 Rubber or plastic hose and hose assemblies Flexural hydraulic pulse test (ISO 6803.2008, IDT) ISO 527 (all parts) Determination of plastic tensile properties (Plastics-Determinationoftensileproperties) ISO 1402 Rubber, plastic hoses and hose assemblies Hydraulic static test (Rubberandplasticshosesandhoseas- semblies-Hydrostatictesting) ISO 4080 Rubber, plastic hoses and their combinations Determination of breathability (Rubberandplasticshosesandhoseas- semblies-Determinationofpermeabilitytogas) ISO 4406 Liquid Transmission Fluid Solid Particle Pollution Level Code-name method (Hydraulicfluidpower-Fluids-Method forcodingthelevelofcontaminationbysolidparticles) ISO 6801 Determination of rubber or plastic hose volume expansion (Rubberorplasticshoses-Determinationofvolu- metricexpansion) ISO 7751 Rubber, plastic hoses and hose assemblies Test pressure, ratio of burst pressure to design working pressure (Rubber andplasticshosesandhoseassemblies-Ratiosofproofandburstpressuretodesignworkingpres- sure ISO 13628-8 Design and operation of subsea production systems for the oil and gas industry - Part 8. Underwater machines for subsea production systems (ROV) interface (Petroleumand natural gasindustries-Designandoperationofsubseaproduction systems-Part 8.RemotelyOperatedVehicle (ROV) interfacesonsubseaproductionsystems) ISO 8308 Rubber and plastics hoses and non-reinforced hoses - Determination of liquid wall penetration (Rubberandplasticshosesandtub-
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 21412.5-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 21412.5-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 21412.5-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 21412.5-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 21412.5-2017?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 21412.5-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.